If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786111105020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.752586,"lon":-119.618965,"icon":""}]} |
Location: 02/05-11-078-11W6/0 | |
Location Alias: 02/05-11-78-11 W6M | |
Location Alias 2: 02/05-11-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 11 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 3-15 HZ 102 PCOUPES 5-11-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0487073 | |
License Date: 2017-12-12 | |
License Status: Issued | |
Spud Date: 2018-02-02 | |
Final Drill Date: 2018-02-12 | |
Well Total Depth: 4099.00 m | |
Surface Hole Latitude: 55.752586 | |
Surface Hole Longitude: -119.618965 |
Date | Event |
---|---|
2017-12-12 | Obtained License |
2018-02-03 | Surface Casing Operation Performed |
2018-02-05 | Direction Drilling Operation Performed - Deviate |
2018-02-08 | Direction Drilling Operation Performed - Horizontal |
2018-02-12 | Finished Drilling |
2018-02-12 | Well Log Performed |
2018-02-12 | Well Mode changed to Drilled and Cased |
2018-02-13 | Well Log Performed |
2018-02-17 | Well Log Performed |
2018-02-19 | Production Casing Operation Performed |
2018-02-20 | Rig Released |
2018-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-16 | Perforation Treatment Performed - Open-Hole Completion |
2018-03-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-13 | Well Log Performed |
2018-04-18 | Well Began Production |
2018-04-18 | Well Fluid changed to Crude Oil |
2018-04-18 | Well Mode changed to Flowing |
2018-05-15 | Well Fluid changed to Crude Oil |
2018-05-15 | Well Mode changed to Gas Lift |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-02-02 | Ensign Drilling Inc. | 556 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-05 | 708.00 | Deviate (5 - 79 degrees) |
2018-02-08 | 2351.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-16 | Open Hole/Barefoot Completion | 4093.00 | 4099.00 | 0 |
2018-03-16 | Multi-Stage Fracture | 3736.90 | 3737.80 | 0 |
2018-03-16 | Multi-Stage Fracture | 3694.90 | 3695.80 | 0 |
2018-03-16 | Multi-Stage Fracture | 3652.50 | 3653.40 | 0 |
2018-03-16 | Multi-Stage Fracture | 3610.30 | 3611.20 | 0 |
2018-03-16 | Multi-Stage Fracture | 3568.00 | 3568.90 | 0 |
2018-03-16 | Multi-Stage Fracture | 3525.50 | 3526.40 | 0 |
2018-03-16 | Multi-Stage Fracture | 3483.30 | 3484.20 | 0 |
2018-03-16 | Multi-Stage Fracture | 3441.00 | 3441.90 | 0 |
2018-03-16 | Multi-Stage Fracture | 3398.80 | 3399.70 | 0 |
2018-03-17 | Multi-Stage Fracture | 3356.40 | 3357.30 | 0 |
2018-03-16 | Multi-Stage Fracture | 4067.80 | 4069.10 | 0 |
2018-03-17 | Multi-Stage Fracture | 3314.00 | 3314.90 | 0 |
2018-03-17 | Multi-Stage Fracture | 3271.50 | 3272.40 | 0 |
2018-03-17 | Multi-Stage Fracture | 3229.20 | 3230.10 | 0 |
2018-03-17 | Multi-Stage Fracture | 3186.80 | 3187.70 | 0 |
2018-03-17 | Multi-Stage Fracture | 3144.30 | 3145.20 | 0 |
2018-03-17 | Multi-Stage Fracture | 3101.90 | 3102.80 | 0 |
2018-03-17 | Multi-Stage Fracture | 3059.50 | 3060.40 | 0 |
2018-03-17 | Multi-Stage Fracture | 3017.10 | 3018.00 | 0 |
2018-03-17 | Multi-Stage Fracture | 2974.70 | 2975.60 | 0 |
2018-03-17 | Multi-Stage Fracture | 2932.30 | 2933.20 | 0 |
2018-03-16 | Multi-Stage Fracture | 4033.10 | 4034.00 | 0 |
2018-03-17 | Multi-Stage Fracture | 2889.80 | 2890.70 | 0 |
2018-03-17 | Multi-Stage Fracture | 2860.70 | 2861.60 | 0 |
2018-03-17 | Multi-Stage Fracture | 2831.80 | 2832.70 | 0 |
2018-03-17 | Multi-Stage Fracture | 2802.80 | 2803.70 | 0 |
2018-03-17 | Multi-Stage Fracture | 2773.70 | 2774.60 | 0 |
2018-03-17 | Multi-Stage Fracture | 2744.70 | 2745.60 | 0 |
2018-03-17 | Multi-Stage Fracture | 2715.80 | 2716.70 | 0 |
2018-03-17 | Multi-Stage Fracture | 2686.80 | 2687.70 | 0 |
2018-03-17 | Multi-Stage Fracture | 2657.90 | 2658.80 | 0 |
2018-03-17 | Multi-Stage Fracture | 2628.90 | 2629.80 | 0 |
2018-03-16 | Multi-Stage Fracture | 3990.70 | 3991.60 | 0 |
2018-03-17 | Multi-Stage Fracture | 2599.90 | 2600.80 | 0 |
2018-03-17 | Multi-Stage Fracture | 2571.10 | 2572.00 | 0 |
2018-03-17 | Multi-Stage Fracture | 2542.20 | 2543.10 | 0 |
2018-03-17 | Multi-Stage Fracture | 2513.30 | 2514.20 | 0 |
2018-03-17 | Multi-Stage Fracture | 2484.20 | 2485.10 | 0 |
2018-03-17 | Multi-Stage Fracture | 2455.40 | 2456.30 | 0 |
2018-03-17 | Multi-Stage Fracture | 2426.50 | 2427.40 | 0 |
2018-03-16 | Multi-Stage Fracture | 3948.30 | 3949.20 | 0 |
2018-03-16 | Multi-Stage Fracture | 3906.00 | 3906.90 | 0 |
2018-03-16 | Multi-Stage Fracture | 3863.60 | 3864.50 | 0 |
2018-03-16 | Multi-Stage Fracture | 3821.10 | 3822.00 | 0 |
2018-03-16 | Multi-Stage Fracture | 3778.90 | 3779.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-16 | 2018-03-17 | 2,188 | 9,856 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 80.7925 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 18.7149 | N/A | ||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0109 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0109 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0109 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0109 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0109 | N/A | ||||
DWP-690 | Calfrac | Breaker | Hydrogen peroxide | 7722-84-1 | 100 | 0.0382 | N/A | |
Water | 7732-18-5 | 100 | 0.0382 | N/A | ||||
CalVisc | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.4432 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-03-14 | 2018-03-21 | Surface Water - Runoff | 9467 |
2018-03-16 | 2018-09-04 | Recycled Fracturing Water (treated at well site) | 55 |
2018-02-27 | 2018-04-08 | Groundwater - Saline | 62 |
2018-04-05 | 2018-04-06 | Recycled Fracturing Water (treated at well site) | 64 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5815 | 0.0 | 0.0 | 0.0 |
2019 | 8456 | 0.0 | 0.0 | 0.0 |
2020 | 2070 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-20 | No Incident Encountered | 0.00 | 0.00 |
2018-04-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]