X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786111101020

Well Details

Well ID: 0786111101020
Loading map...
Location: 02/01-11-078-11W6/0
Location Alias: 02/01-11-78-11 W6M
Location Alias 2: 02/01-11-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 11
County/Municipality: Saddle Hills County
Well Name: BIR 3-15 HZ 102 PCOUPES 1-11-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0482422
License Date: 2017-01-17
License Status: Issued
Spud Date: 2017-02-28
Final Drill Date: 2017-03-11
Well Total Depth: 4818.00 m
Surface Hole Latitude: 55.752931
Surface Hole Longitude: -119.619284

For data sources see[1][2]

Well History

Date Event
2017-01-17 Obtained License
2017-03-01 Surface Casing Operation Performed
2017-03-02 Direction Drilling Operation Performed - Deviate
2017-03-05 Direction Drilling Operation Performed - Horizontal
2017-03-11 Finished Drilling
2017-03-11 Well Log Performed
2017-03-11 Well Mode changed to Drilled and Cased
2017-03-12 Production Casing Operation Performed
2017-03-12 Well Log Performed
2017-03-13 Rig Released
2017-04-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-09 Perforation Treatment Performed - Open-Hole Completion
2017-04-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-25 Well Began Production
2017-04-25 Well Fluid changed to Crude Oil
2017-04-25 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-02-28 Ensign Drilling Inc. 546 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-02 783.10 Deviate (5 - 79 degrees)
2017-03-05 2221.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-04-09 Open Hole/Barefoot Completion 4810.80 4818.00 0
2017-04-09 Multi-Stage Fracture 4360.40 4361.30 0
2017-04-09 Multi-Stage Fracture 4303.90 4304.80 0
2017-04-09 Multi-Stage Fracture 4248.00 4248.90 0
2017-04-09 Multi-Stage Fracture 4191.40 4192.30 0
2017-04-09 Multi-Stage Fracture 4135.10 4136.00 0
2017-04-09 Multi-Stage Fracture 4078.60 4079.50 0
2017-04-09 Multi-Stage Fracture 4022.70 4023.60 0
2017-04-09 Multi-Stage Fracture 3967.80 3968.70 0
2017-04-09 Multi-Stage Fracture 3911.90 3912.80 0
2017-04-09 Multi-Stage Fracture 3857.20 3858.10 0
2017-04-09 Multi-Stage Fracture 4799.50 4801.80 0
2017-04-10 Multi-Stage Fracture 3804.20 3805.10 0
2017-04-10 Multi-Stage Fracture 3749.30 3750.20 0
2017-04-10 Multi-Stage Fracture 3693.00 3693.90 0
2017-04-10 Multi-Stage Fracture 3636.80 3637.70 0
2017-04-10 Multi-Stage Fracture 3580.10 3581.00 0
2017-04-10 Multi-Stage Fracture 3524.20 3525.10 0
2017-04-10 Multi-Stage Fracture 3467.90 3468.80 0
2017-04-10 Multi-Stage Fracture 3411.20 3412.10 0
2017-04-10 Multi-Stage Fracture 3355.10 3356.00 0
2017-04-10 Multi-Stage Fracture 3300.00 3300.90 0
2017-04-09 Multi-Stage Fracture 4750.80 4751.70 0
2017-04-10 Multi-Stage Fracture 3243.20 3244.10 0
2017-04-10 Multi-Stage Fracture 3186.90 3187.80 0
2017-04-10 Multi-Stage Fracture 3144.10 3145.00 0
2017-04-10 Multi-Stage Fracture 3088.70 3089.60 0
2017-04-10 Multi-Stage Fracture 3032.80 3033.70 0
2017-04-10 Multi-Stage Fracture 2976.80 2977.70 0
2017-04-10 Multi-Stage Fracture 2920.80 2921.70 0
2017-04-10 Multi-Stage Fracture 2864.90 2865.80 0
2017-04-10 Multi-Stage Fracture 2822.50 2823.40 0
2017-04-10 Multi-Stage Fracture 2779.80 2780.70 0
2017-04-09 Multi-Stage Fracture 4695.50 4696.40 0
2017-04-10 Multi-Stage Fracture 2724.10 2725.00 0
2017-04-10 Multi-Stage Fracture 2667.90 2668.80 0
2017-04-10 Multi-Stage Fracture 2612.30 2613.20 0
2017-04-10 Multi-Stage Fracture 2556.00 2556.90 0
2017-04-10 Multi-Stage Fracture 2513.30 2514.20 0
2017-04-10 Multi-Stage Fracture 2484.20 2485.10 0
2017-04-09 Multi-Stage Fracture 4639.20 4640.10 0
2017-04-09 Multi-Stage Fracture 4582.80 4583.70 0
2017-04-09 Multi-Stage Fracture 4526.20 4527.10 0
2017-04-09 Multi-Stage Fracture 4472.60 4473.50 0
2017-04-09 Multi-Stage Fracture 4416.70 4417.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-04-09 2017-04-10 2,111 14,145 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.3475 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.4762 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 4.0688 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0085 N/A
Dibromoacetonitrile 3252-43-5 100 0.0085 N/A
Polyethylene Glycol 25322-68-3 100 0.0085 N/A
Sodium Bromide 7647-15-6 100 0.0085 N/A
Water 7732-18-5 100 0.0085 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0036 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.0929 N/A
Oxyalkylated alcohol 9014 100 0.0929 N/A
Petroleum distillates 64742-47-8 100 0.0929 N/A
Polyacrylate 9014 100 0.0929 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-02-18 2017-02-24 Surface Water - Runoff 2060
2017-02-24 2017-03-02 Surface Water - Runoff 445
2017-03-02 2017-03-04 Surface Water - Runoff 259
2017-02-27 2017-03-05 Surface Water - Runoff 2359
2016-09-30 2016-10-01 Surface Water - Runoff 210
2017-03-31 2017-04-08 Surface Water - Runoff 399
2016-10-03 2016-10-05 Surface Water - Runoff 3449
2017-03-29 2017-04-08 Surface Water - Runoff 660
2016-09-30 2016-10-01 Surface Water - Runoff 251
2016-09-30 2016-10-03 Surface Water - Runoff 243
2017-03-31 2017-04-10 Surface Water - Runoff 3051
2017-03-03 2017-03-11 Recycled Fracturing Water (treated at well site) 72
2017-03-03 2017-03-11 Recycled Fracturing Water (treated at well site) 76
2017-03-27 2017-04-15 Recycled Fracturing Water (treated at independent stand-alone facility) 860
2017-03-26 2017-04-07 Recycled Fracturing Water (treated at well site) 71
2017-03-26 2017-04-07 Recycled Fracturing Water (treated at well site) 89
2017-03-27 2017-04-07 Recycled Fracturing Water (treated at well site) 93

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5299 0.0 0.0 0.0
2018 8031 0.0 0.0 0.0
2019 8704 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-13 No Incident Encountered 0.00 0.00
2017-04-10 No Incident Encountered 0.00 0.00
2018-03-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References