X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786111101000

Well Details

Well ID: 0786111101000
Loading map...
Location: 00/01-11-078-11W6/0
Location Alias: 00/01-11-78-11 W6M
Location Alias 2: 00/01-11-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 11
County/Municipality: Saddle Hills County
Well Name: BIR 3-15 HZ PCOUPES 1-11-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0481077
License Date: 2016-11-01
License Status: Amended
Spud Date: 2017-01-01
Final Drill Date: 2017-01-12
Well Total Depth: 4725.00 m
Surface Hole Latitude: 55.753163
Surface Hole Longitude: -119.619528

For data sources see[1][2]

Well History

Date Event
2016-11-01 Obtained License
2017-01-02 Surface Casing Operation Performed
2017-01-03 Direction Drilling Operation Performed - Deviate
2017-01-07 Direction Drilling Operation Performed - Horizontal
2017-01-12 Finished Drilling
2017-01-12 Well Log Performed
2017-01-12 Well Mode changed to Drilled and Cased
2017-01-14 Production Casing Operation Performed
2017-01-15 Rig Released
2017-04-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-02 Perforation Treatment Performed - Open-Hole Completion
2017-04-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-15 Well Began Production
2017-04-15 Well Fluid changed to Crude Oil
2017-04-15 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-01 Ensign Drilling Inc. 546 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-03 667.90 Deviate (5 - 79 degrees)
2017-01-07 2415.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-04-02 Open Hole/Barefoot Completion 4724.00 4725.00 0
2017-04-03 Multi-Stage Fracture 4281.70 4282.60 0
2017-04-03 Multi-Stage Fracture 4227.50 4228.40 0
2017-04-03 Multi-Stage Fracture 4174.80 4175.70 0
2017-04-03 Multi-Stage Fracture 4119.00 4119.90 0
2017-04-03 Multi-Stage Fracture 4065.60 4066.50 0
2017-04-03 Multi-Stage Fracture 4010.40 4011.30 0
2017-04-03 Multi-Stage Fracture 3956.30 3957.20 0
2017-04-03 Multi-Stage Fracture 3902.80 3903.70 0
2017-04-03 Multi-Stage Fracture 3846.90 3847.80 0
2017-04-03 Multi-Stage Fracture 3791.20 3792.10 0
2017-04-02 Multi-Stage Fracture 4712.50 4713.80 0
2017-04-03 Multi-Stage Fracture 3736.50 3737.40 0
2017-04-03 Multi-Stage Fracture 3682.90 3683.80 0
2017-04-03 Multi-Stage Fracture 3627.20 3628.10 0
2017-04-03 Multi-Stage Fracture 3571.40 3572.30 0
2017-04-03 Multi-Stage Fracture 3519.30 3520.10 0
2017-04-03 Multi-Stage Fracture 3465.70 3466.60 0
2017-04-03 Multi-Stage Fracture 3411.60 3412.50 0
2017-04-03 Multi-Stage Fracture 3357.50 3358.40 0
2017-04-03 Multi-Stage Fracture 3301.70 3302.50 0
2017-04-03 Multi-Stage Fracture 3245.90 3246.70 0
2017-04-02 Multi-Stage Fracture 4666.20 4667.10 0
2017-04-03 Multi-Stage Fracture 3191.00 3191.80 0
2017-04-03 Multi-Stage Fracture 3137.80 3138.60 0
2017-04-03 Multi-Stage Fracture 3082.50 3083.30 0
2017-04-03 Multi-Stage Fracture 3028.20 3029.00 0
2017-04-03 Multi-Stage Fracture 2977.50 2978.30 0
2017-04-03 Multi-Stage Fracture 2922.20 2923.00 0
2017-04-04 Multi-Stage Fracture 2879.80 2880.60 0
2017-04-04 Multi-Stage Fracture 2839.30 2840.10 0
2017-04-04 Multi-Stage Fracture 2797.10 2797.90 0
2017-04-04 Multi-Stage Fracture 2758.00 2758.80 0
2017-04-02 Multi-Stage Fracture 4610.40 4611.30 0
2017-04-04 Multi-Stage Fracture 2715.50 2716.30 0
2017-04-04 Multi-Stage Fracture 2674.70 2675.20 0
2017-04-04 Multi-Stage Fracture 2633.80 2634.60 0
2017-04-04 Multi-Stage Fracture 2591.40 2592.20 0
2017-04-04 Multi-Stage Fracture 2549.50 2550.30 0
2017-04-02 Multi-Stage Fracture 4554.70 4555.60 0
2017-04-02 Multi-Stage Fracture 4498.90 4499.80 0
2017-04-03 Multi-Stage Fracture 4444.60 4445.50 0
2017-04-03 Multi-Stage Fracture 4391.80 4392.70 0
2017-04-03 Multi-Stage Fracture 4337.50 4338.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-04-02 2017-04-04 2,174 13,608 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 78.1495 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 12.5267 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.2237 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0077 N/A
Dibromoacetonitrile 3252-43-5 100 0.0077 N/A
Polyethylene Glycol 25322-68-3 100 0.0077 N/A
Sodium Bromide 7647-15-6 100 0.0077 N/A
Water 7732-18-5 100 0.0077 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.004 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.0862 N/A
Oxyalkylated alcohol 9014 100 0.0862 N/A
Petroleum distillates 64742-47-8 100 0.0862 N/A
Polyacrylate 9014 100 0.0862 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-02-18 2017-02-24 Surface Water - Runoff 1743
2017-02-24 2017-03-02 Surface Water - Runoff 377
2017-03-02 2017-03-04 Surface Water - Runoff 220
2017-02-27 2017-03-05 Surface Water - Runoff 1996
2016-09-30 2016-10-01 Surface Water - Runoff 178
2017-03-31 2017-04-08 Surface Water - Runoff 338
2016-10-03 2016-10-05 Surface Water - Runoff 2919
2017-03-29 2017-04-08 Surface Water - Runoff 559
2016-09-30 2016-10-01 Surface Water - Runoff 213
2016-09-30 2016-10-03 Surface Water - Runoff 206
2017-03-31 2017-04-10 Surface Water - Runoff 2582
2017-03-03 2017-03-11 Recycled Fracturing Water (treated at well site) 61
2017-03-03 2017-03-11 Recycled Fracturing Water (treated at well site) 64
2017-03-27 2017-04-15 Recycled Fracturing Water (treated at independent stand-alone facility) 728
2017-03-26 2017-04-07 Recycled Fracturing Water (treated at well site) 60
2017-03-26 2017-04-07 Recycled Fracturing Water (treated at well site) 75
2017-03-26 2017-04-07 Recycled Fracturing Water (treated at well site) 78

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5169 0.0 0.0 0.0
2018 8400 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-15 No Incident Encountered 0.00 0.00
2017-04-04 No Incident Encountered 0.00 0.00
2018-03-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References