X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110408030

Well Details

Well ID: 0786110408030
Loading map...
Location: 03/08-04-078-11W6/0
Location Alias: 03/08-04-78-11 W6M
Location Alias 2: 03/08-04-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 04
County/Municipality: Saddle Hills County
Well Name: TQN HZ PCOUPES 8-4-78-11
Operator Name: TAQA North Ltd.
License Number: 0492993
License Date: 2018-12-21
License Status: Issued
Spud Date: 2019-02-28
Final Drill Date: 2019-03-26
Well Total Depth: 4355.00 m
Surface Hole Latitude: 55.727106
Surface Hole Longitude: -119.666441

For data sources see[1][2]

Well History

Date Event
2018-12-21 Obtained License
2019-03-01 Surface Casing Operation Performed
2019-03-19 Direction Drilling Operation Performed - Deviate
2019-03-20 Direction Drilling Operation Performed - Horizontal
2019-03-23 Well Log Performed
2019-03-26 Finished Drilling
2019-03-26 Perforation Treatment Performed - Open-Hole Completion
2019-03-26 Well Log Performed
2019-03-26 Well Mode changed to Drilled and Cased
2019-03-27 Production Casing Operation Performed
2019-03-29 Rig Released
2019-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-30 Well Began Production
2019-09-30 Well Fluid changed to Crude Oil
2019-09-30 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-03-19 Nabors Drilling Canada Limited 5 N/A Resumption
2019-02-28 Nabors Drilling Canada Limited 5 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-19 779.30 Deviate (5 - 79 degrees)
2019-03-20 1884.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-26 Open Hole/Barefoot Completion 4353.00 4355.00 0
2019-09-17 Multi-Stage Fracture 3859.90 3915.00 0
2019-09-17 Multi-Stage Fracture 3804.80 3859.90 0
2019-09-17 Multi-Stage Fracture 3749.90 3804.80 0
2019-09-17 Multi-Stage Fracture 3694.70 3749.90 0
2019-09-17 Multi-Stage Fracture 3639.50 3694.70 0
2019-09-17 Multi-Stage Fracture 3584.30 3639.50 0
2019-09-17 Multi-Stage Fracture 3529.10 3584.30 0
2019-09-17 Multi-Stage Fracture 3474.00 3529.10 0
2019-09-17 Multi-Stage Fracture 3419.10 3474.00 0
2019-09-17 Multi-Stage Fracture 3363.90 3419.10 0
2019-09-17 Multi-Stage Fracture 4300.80 4355.00 0
2019-09-17 Multi-Stage Fracture 3308.70 3363.90 0
2019-09-17 Multi-Stage Fracture 3254.00 3308.70 0
2019-09-17 Multi-Stage Fracture 3198.80 3254.00 0
2019-09-17 Multi-Stage Fracture 3143.60 3198.80 0
2019-09-18 Multi-Stage Fracture 3088.40 3143.60 0
2019-09-18 Multi-Stage Fracture 3033.60 3088.40 0
2019-09-18 Multi-Stage Fracture 2978.80 3033.60 0
2019-09-18 Multi-Stage Fracture 2924.10 2978.80 0
2019-09-18 Multi-Stage Fracture 2869.00 2924.10 0
2019-09-18 Multi-Stage Fracture 2813.80 2869.00 0
2019-09-17 Multi-Stage Fracture 4245.60 4300.80 0
2019-09-18 Multi-Stage Fracture 2758.70 2813.80 0
2019-09-22 Multi-Stage Fracture 2704.70 2758.70 0
2019-09-22 Multi-Stage Fracture 2649.50 2704.70 0
2019-09-22 Multi-Stage Fracture 2554.80 2648.50 0
2019-09-22 Multi-Stage Fracture 2496.60 2554.80 0
2019-09-22 Multi-Stage Fracture 2438.20 2496.60 0
2019-09-22 Multi-Stage Fracture 2392.60 2438.20 0
2019-09-22 Multi-Stage Fracture 2346.90 2392.60 0
2019-09-17 Multi-Stage Fracture 4190.40 4245.60 0
2019-09-17 Multi-Stage Fracture 4135.20 4190.40 0
2019-09-17 Multi-Stage Fracture 4080.10 4135.30 0
2019-09-17 Multi-Stage Fracture 4025.40 4080.10 0
2019-09-17 Multi-Stage Fracture 3970.20 4025.40 0
2019-09-17 Multi-Stage Fracture 3915.00 3970.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-09-17 2019-09-22 2,204 18,841 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 89.7064 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 5.0341 N/A
SECURE BIO-20D Secure Energy Services Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0109 N/A
Dibromoacetonitrile 3252-43-5 100 0.0109 N/A
water 7732-18-5 100 0.0109 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.0741 N/A
IH-FR-2A Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0603 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0796 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0796 N/A
water 7732-18-5 100 0.0796 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-09-19 2019-09-22 Surface Water - Lake 18840

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 24 0.0 0.0 0.0
2020 2122 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-25 No Incident Encountered 0.00 0.00
2019-10-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References