X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110408020

Well Details

Well ID: 0786110408020
Loading map...
Location: 02/08-04-078-11W6/0
Location Alias: 02/08-04-78-11 W6M
Location Alias 2: 02/08-04-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 04
County/Municipality: Saddle Hills County
Well Name: TQN HZ PCOUPES 8-4-78-11
Operator Name: TAQA North Ltd.
License Number: 0492992
License Date: 2018-12-21
License Status: Issued
Spud Date: 2019-03-03
Final Drill Date: 2019-03-16
Well Total Depth: 4331.00 m
Surface Hole Latitude: 55.726931
Surface Hole Longitude: -119.666368

For data sources see[1][2]

Well History

Date Event
2018-12-21 Obtained License
2019-03-03 Conductor Casing Operation Performed
2019-03-05 Direction Drilling Operation Performed - Deviate
2019-03-08 Well Log Performed
2019-03-11 Direction Drilling Operation Performed - Horizontal
2019-03-16 Finished Drilling
2019-03-16 Perforation Treatment Performed - Open-Hole Completion
2019-03-16 Production Casing Operation Performed
2019-03-16 Well Log Performed
2019-03-16 Well Mode changed to Drilled and Cased
2019-03-18 Rig Released
2019-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-28 Well Began Production
2019-09-28 Well Fluid changed to Crude Oil
2019-09-28 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-03-05 718.50 Deviate (5 - 79 degrees)
2019-03-11 2253.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-16 Open Hole/Barefoot Completion 4316.00 4331.00 0
2019-09-15 Multi-Stage Fracture 3835.80 3890.90 0
2019-09-15 Multi-Stage Fracture 3780.60 3835.80 0
2019-09-15 Multi-Stage Fracture 3725.90 3780.60 0
2019-09-15 Multi-Stage Fracture 3670.80 3725.90 0
2019-09-15 Multi-Stage Fracture 3615.80 3670.80 0
2019-09-15 Multi-Stage Fracture 3560.70 3615.80 0
2019-09-15 Multi-Stage Fracture 3505.50 3560.70 0
2019-09-15 Multi-Stage Fracture 3450.40 3505.50 0
2019-09-16 Multi-Stage Fracture 3395.30 3450.40 0
2019-09-16 Multi-Stage Fracture 3340.10 3395.30 0
2019-09-15 Multi-Stage Fracture 4276.90 4331.00 0
2019-09-16 Multi-Stage Fracture 3285.30 3340.10 0
2019-09-16 Multi-Stage Fracture 3230.20 3285.30 0
2019-09-16 Multi-Stage Fracture 3175.00 3230.20 0
2019-09-16 Multi-Stage Fracture 3119.80 3175.00 0
2019-09-16 Multi-Stage Fracture 3064.60 3119.80 0
2019-09-16 Multi-Stage Fracture 3009.50 3064.60 0
2019-09-16 Multi-Stage Fracture 2956.30 3009.50 0
2019-09-16 Multi-Stage Fracture 2899.10 2954.30 0
2019-09-16 Multi-Stage Fracture 2843.90 2899.10 0
2019-09-16 Multi-Stage Fracture 2788.70 2843.90 0
2019-09-15 Multi-Stage Fracture 4221.80 4276.90 0
2019-09-16 Multi-Stage Fracture 2733.50 2788.70 0
2019-09-16 Multi-Stage Fracture 2678.30 2733.50 0
2019-09-16 Multi-Stage Fracture 2623.10 2678.30 0
2019-09-16 Multi-Stage Fracture 2540.70 2623.10 0
2019-09-16 Multi-Stage Fracture 2482.90 2540.70 0
2019-09-22 Multi-Stage Fracture 2425.10 2482.90 0
2019-09-23 Multi-Stage Fracture 2367.30 2425.10 0
2019-09-23 Multi-Stage Fracture 2309.70 2367.30 0
2019-09-23 Multi-Stage Fracture 2250.80 2309.70 0
2019-09-15 Multi-Stage Fracture 4166.60 4221.80 0
2019-09-15 Multi-Stage Fracture 4111.40 4166.60 0
2019-09-15 Multi-Stage Fracture 4056.30 4111.40 0
2019-09-15 Multi-Stage Fracture 4001.20 4056.30 0
2019-09-15 Multi-Stage Fracture 3946.10 4001.20 0
2019-09-15 Multi-Stage Fracture 3890.90 3949.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-09-15 2019-09-23 2,150 19,647 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 89.9709 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 4.8961 N/A
SECURE BIO-20D Secure Energy Services Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0112 N/A
Dibromoacetonitrile 3252-43-5 100 0.0112 N/A
water 7732-18-5 100 0.0112 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.0739 N/A
IH-FR-2A Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0714 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.08 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.08 N/A
water 7732-18-5 100 0.08 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-09-15 2019-09-23 Surface Water - Lake 19647

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 375 0.0 0.0 0.0
2020 1530 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-10 No Incident Encountered 0.00 0.00
2019-09-15 No Incident Encountered 0.00 0.00

For data sources see[9]

References