X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110401000

Well Details

Well ID: 0786110401000
Loading map...
Location: 00/01-04-078-11W6/0
Location Alias: 00/01-04-78-11 W6M
Location Alias 2: 00/01-04-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 04
County/Municipality: Saddle Hills County
Well Name: TQN HZ PCOUPES 1-4-78-11
Operator Name: TAQA North Ltd.
License Number: 0492990
License Date: 2018-12-21
License Status: Amended
Spud Date: 2019-02-26
Final Drill Date: 2019-04-08
Well Total Depth: 4302.00 m
Surface Hole Latitude: 55.726757
Surface Hole Longitude: -119.666294

For data sources see[1][2]

Well History

Date Event
2018-12-21 Obtained License
2019-02-27 Surface Casing Operation Performed
2019-03-30 Direction Drilling Operation Performed - Deviate
2019-04-03 Direction Drilling Operation Performed - Horizontal
2019-04-03 Well Log Performed
2019-04-08 Finished Drilling
2019-04-08 Well Log Performed
2019-04-08 Well Mode changed to Drilled and Cased
2019-04-09 Perforation Treatment Performed - Open-Hole Completion
2019-04-09 Production Casing Operation Performed
2019-04-10 Rig Released
2019-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-02 Well Began Production
2019-10-02 Well Fluid changed to Crude Oil
2019-10-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-26 Nabors Drilling Canada Limited 5 N/A Set Surface
2019-03-29 Nabors Drilling Canada Limited 5 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-30 770.50 Deviate (5 - 79 degrees)
2019-04-03 2258.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-04-09 Open Hole/Barefoot Completion 4295.00 4302.00 0
2019-09-18 Multi-Stage Fracture 3805.20 3859.70 0
2019-09-19 Multi-Stage Fracture 3750.30 3805.20 0
2019-09-19 Multi-Stage Fracture 3695.30 3750.30 0
2019-09-19 Multi-Stage Fracture 3640.40 3695.30 0
2019-09-19 Multi-Stage Fracture 3585.50 3640.40 0
2019-09-19 Multi-Stage Fracture 3531.40 3585.50 0
2019-09-19 Multi-Stage Fracture 3476.90 3531.40 0
2019-09-19 Multi-Stage Fracture 3422.40 3476.90 0
2019-09-19 Multi-Stage Fracture 3367.40 3422.40 0
2019-09-19 Multi-Stage Fracture 3312.50 3367.40 0
2019-09-18 Multi-Stage Fracture 4256.70 4302.00 0
2019-09-19 Multi-Stage Fracture 3257.60 3312.50 0
2019-09-19 Multi-Stage Fracture 3202.60 3257.60 0
2019-09-19 Multi-Stage Fracture 3147.70 3202.60 0
2019-09-19 Multi-Stage Fracture 3093.20 3147.70 0
2019-09-19 Multi-Stage Fracture 3038.30 3093.20 0
2019-09-19 Multi-Stage Fracture 2983.40 3038.30 0
2019-09-19 Multi-Stage Fracture 2928.40 2983.40 0
2019-09-19 Multi-Stage Fracture 2873.40 2928.40 0
2019-09-19 Multi-Stage Fracture 2818.50 2873.40 0
2019-09-19 Multi-Stage Fracture 2763.60 2818.50 0
2019-09-18 Multi-Stage Fracture 4201.70 4256.70 0
2019-09-19 Multi-Stage Fracture 2708.60 2763.60 0
2019-09-19 Multi-Stage Fracture 2653.70 2708.60 0
2019-09-20 Multi-Stage Fracture 2598.70 2653.70 0
2019-09-20 Multi-Stage Fracture 2516.80 2598.70 0
2019-09-20 Multi-Stage Fracture 2471.80 2516.80 0
2019-09-20 Multi-Stage Fracture 2414.90 2471.80 0
2019-09-20 Multi-Stage Fracture 2357.50 2414.90 0
2019-09-20 Multi-Stage Fracture 2299.60 2357.50 0
2019-09-20 Multi-Stage Fracture 2253.20 2299.60 0
2019-09-18 Multi-Stage Fracture 4146.80 4201.70 0
2019-09-18 Multi-Stage Fracture 4091.80 4146.80 0
2019-09-18 Multi-Stage Fracture 4024.20 4091.80 0
2019-09-18 Multi-Stage Fracture 3969.60 4024.20 0
2019-09-18 Multi-Stage Fracture 3914.70 3969.60 0
2019-09-18 Multi-Stage Fracture 3859.70 3914.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-09-18 2019-09-20 2,138 19,181 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 90.6272 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 4.8123 N/A
SECURE BIO-20D Secure Energy Services Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.1089 N/A
Dibromoacetonitrile 3252-43-5 100 0.1089 N/A
water 7732-18-5 100 0.1089 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.013 N/A
water 7732-18-5 100 0.013 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.0754 N/A
IH-FR-2A Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0709 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-09-19 2019-09-22 Surface Water - Lake 19181

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 48 0.0 0.0 0.0
2020 1661 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-01 No Incident Encountered 0.00 0.00
2019-09-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References