If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786110401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.726757,"lon":-119.666294,"icon":""}]} |
Location: 00/01-04-078-11W6/0 | |
Location Alias: 00/01-04-78-11 W6M | |
Location Alias 2: 00/01-04-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 04 | |
County/Municipality: Saddle Hills County | |
Well Name: TQN HZ PCOUPES 1-4-78-11 | |
Operator Name: TAQA North Ltd. | |
License Number: 0492990 | |
License Date: 2018-12-21 | |
License Status: Amended | |
Spud Date: 2019-02-26 | |
Final Drill Date: 2019-04-08 | |
Well Total Depth: 4302.00 m | |
Surface Hole Latitude: 55.726757 | |
Surface Hole Longitude: -119.666294 |
Date | Event |
---|---|
2018-12-21 | Obtained License |
2019-02-27 | Surface Casing Operation Performed |
2019-03-30 | Direction Drilling Operation Performed - Deviate |
2019-04-03 | Direction Drilling Operation Performed - Horizontal |
2019-04-03 | Well Log Performed |
2019-04-08 | Finished Drilling |
2019-04-08 | Well Log Performed |
2019-04-08 | Well Mode changed to Drilled and Cased |
2019-04-09 | Perforation Treatment Performed - Open-Hole Completion |
2019-04-09 | Production Casing Operation Performed |
2019-04-10 | Rig Released |
2019-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-09-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-09-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-10-02 | Well Began Production |
2019-10-02 | Well Fluid changed to Crude Oil |
2019-10-02 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-02-26 | Nabors Drilling Canada Limited | 5 | N/A | Set Surface |
2019-03-29 | Nabors Drilling Canada Limited | 5 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-03-30 | 770.50 | Deviate (5 - 79 degrees) |
2019-04-03 | 2258.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-04-09 | Open Hole/Barefoot Completion | 4295.00 | 4302.00 | 0 |
2019-09-18 | Multi-Stage Fracture | 3805.20 | 3859.70 | 0 |
2019-09-19 | Multi-Stage Fracture | 3750.30 | 3805.20 | 0 |
2019-09-19 | Multi-Stage Fracture | 3695.30 | 3750.30 | 0 |
2019-09-19 | Multi-Stage Fracture | 3640.40 | 3695.30 | 0 |
2019-09-19 | Multi-Stage Fracture | 3585.50 | 3640.40 | 0 |
2019-09-19 | Multi-Stage Fracture | 3531.40 | 3585.50 | 0 |
2019-09-19 | Multi-Stage Fracture | 3476.90 | 3531.40 | 0 |
2019-09-19 | Multi-Stage Fracture | 3422.40 | 3476.90 | 0 |
2019-09-19 | Multi-Stage Fracture | 3367.40 | 3422.40 | 0 |
2019-09-19 | Multi-Stage Fracture | 3312.50 | 3367.40 | 0 |
2019-09-18 | Multi-Stage Fracture | 4256.70 | 4302.00 | 0 |
2019-09-19 | Multi-Stage Fracture | 3257.60 | 3312.50 | 0 |
2019-09-19 | Multi-Stage Fracture | 3202.60 | 3257.60 | 0 |
2019-09-19 | Multi-Stage Fracture | 3147.70 | 3202.60 | 0 |
2019-09-19 | Multi-Stage Fracture | 3093.20 | 3147.70 | 0 |
2019-09-19 | Multi-Stage Fracture | 3038.30 | 3093.20 | 0 |
2019-09-19 | Multi-Stage Fracture | 2983.40 | 3038.30 | 0 |
2019-09-19 | Multi-Stage Fracture | 2928.40 | 2983.40 | 0 |
2019-09-19 | Multi-Stage Fracture | 2873.40 | 2928.40 | 0 |
2019-09-19 | Multi-Stage Fracture | 2818.50 | 2873.40 | 0 |
2019-09-19 | Multi-Stage Fracture | 2763.60 | 2818.50 | 0 |
2019-09-18 | Multi-Stage Fracture | 4201.70 | 4256.70 | 0 |
2019-09-19 | Multi-Stage Fracture | 2708.60 | 2763.60 | 0 |
2019-09-19 | Multi-Stage Fracture | 2653.70 | 2708.60 | 0 |
2019-09-20 | Multi-Stage Fracture | 2598.70 | 2653.70 | 0 |
2019-09-20 | Multi-Stage Fracture | 2516.80 | 2598.70 | 0 |
2019-09-20 | Multi-Stage Fracture | 2471.80 | 2516.80 | 0 |
2019-09-20 | Multi-Stage Fracture | 2414.90 | 2471.80 | 0 |
2019-09-20 | Multi-Stage Fracture | 2357.50 | 2414.90 | 0 |
2019-09-20 | Multi-Stage Fracture | 2299.60 | 2357.50 | 0 |
2019-09-20 | Multi-Stage Fracture | 2253.20 | 2299.60 | 0 |
2019-09-18 | Multi-Stage Fracture | 4146.80 | 4201.70 | 0 |
2019-09-18 | Multi-Stage Fracture | 4091.80 | 4146.80 | 0 |
2019-09-18 | Multi-Stage Fracture | 4024.20 | 4091.80 | 0 |
2019-09-18 | Multi-Stage Fracture | 3969.60 | 4024.20 | 0 |
2019-09-18 | Multi-Stage Fracture | 3914.70 | 3969.60 | 0 |
2019-09-18 | Multi-Stage Fracture | 3859.70 | 3914.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-09-18 | 2019-09-20 | 2,138 | 19,181 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 90.6272 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 4.8123 | N/A | ||
SECURE BIO-20D | Secure Energy Services | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.1089 | N/A | |
Dibromoacetonitrile | 3252-43-5 | 100 | 0.1089 | N/A | ||||
water | 7732-18-5 | 100 | 0.1089 | N/A | ||||
Tolcide PS75LT | Fusion Technologies Inc. | Bactericide/Biocide | Tetrakis(Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.013 | N/A | |
water | 7732-18-5 | 100 | 0.013 | N/A | ||||
IH-CS-1 | Fusion Technologies Inc. | Clay Control | Non-Whimis Regulated | 64-18-6 | 100 | 0.0754 | N/A | |
IH-FR-2A | Fusion Technologies Inc. | Friction Reducer | Non-Whimis Regulated | Not Available | 100 | 0.0709 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-09-19 | 2019-09-22 | Surface Water - Lake | 19181 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 48 | 0.0 | 0.0 | 0.0 |
2020 | 1661 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-04-01 | No Incident Encountered | 0.00 | 0.00 |
2019-09-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]