X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110312000

Well Details

Well ID: 0786110312000
Loading map...
Location: 00/12-03-078-11W6/0
Location Alias: 00/12-03-78-11 W6M
Location Alias 2: 00/12-03-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 03
County/Municipality: Saddle Hills County
Well Name: BIR PCOUPES 12-3-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0465608
License Date: 2014-03-11
License Status: Issued
Spud Date: 2014-04-26
Final Drill Date: 2014-05-09
Well Total Depth: 4455.00 m
Surface Hole Latitude: 55.725340
Surface Hole Longitude: -119.592668

For data sources see[1][2]

Well History

Date Event
2014-03-11 Obtained License
2014-04-26 Direction Drilling Operation Performed - Deviate
2014-04-27 Surface Casing Operation Performed
2014-05-04 Direction Drilling Operation Performed - Horizontal
2014-05-04 Intermediate Casing Operation Performed
2014-05-09 Finished Drilling
2014-05-09 Well Log Performed
2014-05-09 Well Mode changed to Drilled and Cased
2014-05-11 Liner Casing Operation Performed
2014-05-11 Perforation Treatment Performed - Open-Hole Completion
2014-05-12 Rig Released
2014-06-21 Well Log Performed
2014-07-01 Perforation Treatment Performed - Multi-Stage Fracture
2014-07-02 Perforation Treatment Performed - Multi-Stage Fracture
2014-07-03 Perforation Treatment Performed - Multi-Stage Fracture
2014-07-04 Perforation Treatment Performed - Multi-Stage Fracture
2014-07-05 Perforation Treatment Performed - Multi-Stage Fracture
2014-07-06 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-31 Well Began Production
2014-08-31 Well Fluid changed to Crude Oil
2014-08-31 Well Mode changed to Flowing
2020-02-01 Well Fluid changed to Crude Oil
2020-02-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-04-26 Precision Drilling Corporation 534 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-04-26 140.00 Deviate (5 - 79 degrees)
2014-05-04 2330.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-05-11 Open Hole/Barefoot Completion 4450.00 4455.00 0
2014-07-04 Multi-Stage Fracture 4012.30 4013.50 0
2014-07-04 Multi-Stage Fracture 3959.00 3960.20 0
2014-07-04 Multi-Stage Fracture 3905.50 3906.70 0
2014-07-04 Multi-Stage Fracture 3853.70 3855.00 0
2014-07-04 Multi-Stage Fracture 3798.80 3800.00 0
2014-07-04 Multi-Stage Fracture 3757.80 3759.00 0
2014-07-04 Multi-Stage Fracture 3704.60 3705.80 0
2014-07-04 Multi-Stage Fracture 3649.80 3651.10 0
2014-07-05 Multi-Stage Fracture 3595.80 3597.10 0
2014-07-05 Multi-Stage Fracture 3554.80 3556.00 0
2014-07-01 Multi-Stage Fracture 4414.10 4429.40 0
2014-07-05 Multi-Stage Fracture 3500.00 3501.20 0
2014-07-05 Multi-Stage Fracture 3446.20 3447.40 0
2014-07-05 Multi-Stage Fracture 3394.30 3395.60 0
2014-07-05 Multi-Stage Fracture 3343.80 3345.00 0
2014-07-05 Multi-Stage Fracture 3303.40 3304.60 0
2014-07-05 Multi-Stage Fracture 3251.50 3252.80 0
2014-07-05 Multi-Stage Fracture 3196.60 3197.80 0
2014-07-05 Multi-Stage Fracture 3142.80 3144.10 0
2014-07-05 Multi-Stage Fracture 3089.30 3090.40 0
2014-07-05 Multi-Stage Fracture 3048.20 3049.40 0
2014-07-02 Multi-Stage Fracture 4360.80 4362.10 0
2014-07-05 Multi-Stage Fracture 2995.60 2996.80 0
2014-07-05 Multi-Stage Fracture 2942.10 2943.30 0
2014-07-05 Multi-Stage Fracture 2891.90 2893.10 0
2014-07-06 Multi-Stage Fracture 2837.50 2838.70 0
2014-07-06 Multi-Stage Fracture 2782.70 2784.00 0
2014-07-06 Multi-Stage Fracture 2742.00 2743.20 0
2014-07-02 Multi-Stage Fracture 4319.70 4320.90 0
2014-07-03 Multi-Stage Fracture 4266.20 4267.50 0
2014-07-03 Multi-Stage Fracture 4212.00 4213.20 0
2014-07-03 Multi-Stage Fracture 4157.70 4158.90 0
2014-07-04 Multi-Stage Fracture 4105.70 4107.00 0
2014-07-04 Multi-Stage Fracture 4065.60 4066.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-07-01 2014-07-06 2,223 16,317 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 79.1794 N/A
Pearl RCS 30/50 encana polyurethane resin Trade Secret 100 5.1677 N/A
silica crystalline 14808-60-7 100 5.1677 N/A
Sand 40/70 encana silica crystalline 14808-60-7 100 15.5933 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0017 N/A
Non-Hazardous Not Available 100 0.0576 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-07-02 2014-07-02 Surface Water - Runoff 2728
2014-07-03 2014-07-03 Surface Water - Runoff 2896
2014-07-04 2014-07-04 Surface Water - Runoff 4248
2014-07-05 2014-07-05 Surface Water - Runoff 5504
2014-07-06 2014-07-06 Surface Water - Runoff 1045

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 2264 0.0 0.0 0.0
2015 8319 0.0 0.0 0.0
2016 8551 0.0 0.0 0.0
2017 7662 0.0 0.0 0.0
2018 8087 0.0 0.0 0.0
2019 6250 0.0 0.0 0.0
2020 2126 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-05-12 No Incident Encountered 0.00 0.00
2014-07-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References