If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786110209030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.741295,"lon":-119.60645,"icon":""}]} |
Location: 03/09-02-078-11W6/0 | |
Location Alias: 03/09-02-78-11 W6M | |
Location Alias 2: 03/09-02-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 02 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 1-10 HZ 103 PCOUPES 9-2-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0487242 | |
License Date: 2017-12-15 | |
License Status: Issued | |
Spud Date: 2018-01-28 | |
Final Drill Date: 2018-02-07 | |
Well Total Depth: 4159.00 m | |
Surface Hole Latitude: 55.741295 | |
Surface Hole Longitude: -119.606450 |
Date | Event |
---|---|
2017-12-15 | Obtained License |
2018-01-28 | Surface Casing Operation Performed |
2018-01-30 | Direction Drilling Operation Performed - Deviate |
2018-02-03 | Direction Drilling Operation Performed - Horizontal |
2018-02-03 | Well Log Performed |
2018-02-07 | Finished Drilling |
2018-02-07 | Production Casing Operation Performed |
2018-02-07 | Well Log Performed |
2018-02-07 | Well Mode changed to Drilled and Cased |
2018-02-08 | Rig Released |
2018-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-26 | Perforation Treatment Performed - Open-Hole Completion |
2018-03-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-08 | Well Log Performed |
2018-04-12 | Well Began Production |
2018-04-12 | Well Fluid changed to Crude Oil |
2018-04-12 | Well Mode changed to Flowing |
2020-02-01 | Well Fluid changed to Crude Oil |
2020-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-28 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-30 | 813.20 | Deviate (5 - 79 degrees) |
2018-02-03 | 2312.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-26 | Open Hole/Barefoot Completion | 4154.00 | 4159.00 | 0 |
2018-03-26 | Multi-Stage Fracture | 3797.60 | 3798.50 | 0 |
2018-03-26 | Multi-Stage Fracture | 3755.10 | 3756.00 | 0 |
2018-03-26 | Multi-Stage Fracture | 3712.70 | 3713.60 | 0 |
2018-03-26 | Multi-Stage Fracture | 3670.50 | 3671.40 | 0 |
2018-03-26 | Multi-Stage Fracture | 3628.10 | 3629.00 | 0 |
2018-03-26 | Multi-Stage Fracture | 3585.70 | 3586.60 | 0 |
2018-03-26 | Multi-Stage Fracture | 3543.50 | 3544.40 | 0 |
2018-03-27 | Multi-Stage Fracture | 3501.10 | 3502.00 | 0 |
2018-03-27 | Multi-Stage Fracture | 3458.80 | 3459.70 | 0 |
2018-03-27 | Multi-Stage Fracture | 3416.40 | 3417.30 | 0 |
2018-03-26 | Multi-Stage Fracture | 4142.00 | 4143.20 | 0 |
2018-03-27 | Multi-Stage Fracture | 3374.00 | 3374.90 | 0 |
2018-03-27 | Multi-Stage Fracture | 3331.60 | 3332.50 | 0 |
2018-03-27 | Multi-Stage Fracture | 3289.20 | 3290.10 | 0 |
2018-03-27 | Multi-Stage Fracture | 3247.00 | 3247.90 | 0 |
2018-03-27 | Multi-Stage Fracture | 3204.60 | 3205.50 | 0 |
2018-03-27 | Multi-Stage Fracture | 3162.10 | 3163.00 | 0 |
2018-03-27 | Multi-Stage Fracture | 3119.90 | 3120.80 | 0 |
2018-03-27 | Multi-Stage Fracture | 3077.50 | 3078.40 | 0 |
2018-03-27 | Multi-Stage Fracture | 3035.10 | 3036.00 | 0 |
2018-03-27 | Multi-Stage Fracture | 2992.60 | 2993.50 | 0 |
2018-03-26 | Multi-Stage Fracture | 4093.90 | 4094.80 | 0 |
2018-03-27 | Multi-Stage Fracture | 2950.20 | 2951.10 | 0 |
2018-03-27 | Multi-Stage Fracture | 2908.00 | 2908.90 | 0 |
2018-03-27 | Multi-Stage Fracture | 2865.80 | 2866.70 | 0 |
2018-03-27 | Multi-Stage Fracture | 2823.40 | 2824.30 | 0 |
2018-03-27 | Multi-Stage Fracture | 2781.00 | 2781.90 | 0 |
2018-03-27 | Multi-Stage Fracture | 2738.50 | 2739.40 | 0 |
2018-03-27 | Multi-Stage Fracture | 2696.30 | 2697.20 | 0 |
2018-03-27 | Multi-Stage Fracture | 2653.80 | 2654.70 | 0 |
2018-03-27 | Multi-Stage Fracture | 2611.50 | 2612.40 | 0 |
2018-03-27 | Multi-Stage Fracture | 2582.40 | 2583.30 | 0 |
2018-03-26 | Multi-Stage Fracture | 4051.50 | 4052.40 | 0 |
2018-03-27 | Multi-Stage Fracture | 2553.40 | 2554.30 | 0 |
2018-03-27 | Multi-Stage Fracture | 2524.30 | 2525.20 | 0 |
2018-03-27 | Multi-Stage Fracture | 2495.30 | 2496.20 | 0 |
2018-03-27 | Multi-Stage Fracture | 2466.40 | 2467.30 | 0 |
2018-03-27 | Multi-Stage Fracture | 2437.40 | 2438.30 | 0 |
2018-03-27 | Multi-Stage Fracture | 2408.30 | 2409.20 | 0 |
2018-03-27 | Multi-Stage Fracture | 2379.30 | 2380.20 | 0 |
2018-03-26 | Multi-Stage Fracture | 4009.30 | 4010.20 | 0 |
2018-03-26 | Multi-Stage Fracture | 3966.90 | 3967.80 | 0 |
2018-03-26 | Multi-Stage Fracture | 3924.40 | 3925.30 | 0 |
2018-03-26 | Multi-Stage Fracture | 3882.20 | 3883.10 | 0 |
2018-03-26 | Multi-Stage Fracture | 3840.00 | 3840.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-26 | 2018-03-27 | 2,142 | 11,309 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.8745 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.9126 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 5.1135 | N/A | ||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0114 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0114 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0114 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0114 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0114 | N/A | ||||
CalVisc | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0878 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-03-14 | 2018-03-24 | Surface Water - Runoff | 7880 |
2018-03-14 | 2018-03-24 | Surface Water - Runoff | 3576 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5658 | 0.0 | 0.0 | 0.0 |
2019 | 7549 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-08 | No Incident Encountered | 0.00 | 0.00 |
2018-04-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]