X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110209030

Well Details

Well ID: 0786110209030
Loading map...
Location: 03/09-02-078-11W6/0
Location Alias: 03/09-02-78-11 W6M
Location Alias 2: 03/09-02-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 02
County/Municipality: Saddle Hills County
Well Name: BIR 1-10 HZ 103 PCOUPES 9-2-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0487242
License Date: 2017-12-15
License Status: Issued
Spud Date: 2018-01-28
Final Drill Date: 2018-02-07
Well Total Depth: 4159.00 m
Surface Hole Latitude: 55.741295
Surface Hole Longitude: -119.606450

For data sources see[1][2]

Well History

Date Event
2017-12-15 Obtained License
2018-01-28 Surface Casing Operation Performed
2018-01-30 Direction Drilling Operation Performed - Deviate
2018-02-03 Direction Drilling Operation Performed - Horizontal
2018-02-03 Well Log Performed
2018-02-07 Finished Drilling
2018-02-07 Production Casing Operation Performed
2018-02-07 Well Log Performed
2018-02-07 Well Mode changed to Drilled and Cased
2018-02-08 Rig Released
2018-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-26 Perforation Treatment Performed - Open-Hole Completion
2018-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-08 Well Log Performed
2018-04-12 Well Began Production
2018-04-12 Well Fluid changed to Crude Oil
2018-04-12 Well Mode changed to Flowing
2020-02-01 Well Fluid changed to Crude Oil
2020-02-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-28 Trinidad Drilling Ltd. 449 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-30 813.20 Deviate (5 - 79 degrees)
2018-02-03 2312.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-26 Open Hole/Barefoot Completion 4154.00 4159.00 0
2018-03-26 Multi-Stage Fracture 3797.60 3798.50 0
2018-03-26 Multi-Stage Fracture 3755.10 3756.00 0
2018-03-26 Multi-Stage Fracture 3712.70 3713.60 0
2018-03-26 Multi-Stage Fracture 3670.50 3671.40 0
2018-03-26 Multi-Stage Fracture 3628.10 3629.00 0
2018-03-26 Multi-Stage Fracture 3585.70 3586.60 0
2018-03-26 Multi-Stage Fracture 3543.50 3544.40 0
2018-03-27 Multi-Stage Fracture 3501.10 3502.00 0
2018-03-27 Multi-Stage Fracture 3458.80 3459.70 0
2018-03-27 Multi-Stage Fracture 3416.40 3417.30 0
2018-03-26 Multi-Stage Fracture 4142.00 4143.20 0
2018-03-27 Multi-Stage Fracture 3374.00 3374.90 0
2018-03-27 Multi-Stage Fracture 3331.60 3332.50 0
2018-03-27 Multi-Stage Fracture 3289.20 3290.10 0
2018-03-27 Multi-Stage Fracture 3247.00 3247.90 0
2018-03-27 Multi-Stage Fracture 3204.60 3205.50 0
2018-03-27 Multi-Stage Fracture 3162.10 3163.00 0
2018-03-27 Multi-Stage Fracture 3119.90 3120.80 0
2018-03-27 Multi-Stage Fracture 3077.50 3078.40 0
2018-03-27 Multi-Stage Fracture 3035.10 3036.00 0
2018-03-27 Multi-Stage Fracture 2992.60 2993.50 0
2018-03-26 Multi-Stage Fracture 4093.90 4094.80 0
2018-03-27 Multi-Stage Fracture 2950.20 2951.10 0
2018-03-27 Multi-Stage Fracture 2908.00 2908.90 0
2018-03-27 Multi-Stage Fracture 2865.80 2866.70 0
2018-03-27 Multi-Stage Fracture 2823.40 2824.30 0
2018-03-27 Multi-Stage Fracture 2781.00 2781.90 0
2018-03-27 Multi-Stage Fracture 2738.50 2739.40 0
2018-03-27 Multi-Stage Fracture 2696.30 2697.20 0
2018-03-27 Multi-Stage Fracture 2653.80 2654.70 0
2018-03-27 Multi-Stage Fracture 2611.50 2612.40 0
2018-03-27 Multi-Stage Fracture 2582.40 2583.30 0
2018-03-26 Multi-Stage Fracture 4051.50 4052.40 0
2018-03-27 Multi-Stage Fracture 2553.40 2554.30 0
2018-03-27 Multi-Stage Fracture 2524.30 2525.20 0
2018-03-27 Multi-Stage Fracture 2495.30 2496.20 0
2018-03-27 Multi-Stage Fracture 2466.40 2467.30 0
2018-03-27 Multi-Stage Fracture 2437.40 2438.30 0
2018-03-27 Multi-Stage Fracture 2408.30 2409.20 0
2018-03-27 Multi-Stage Fracture 2379.30 2380.20 0
2018-03-26 Multi-Stage Fracture 4009.30 4010.20 0
2018-03-26 Multi-Stage Fracture 3966.90 3967.80 0
2018-03-26 Multi-Stage Fracture 3924.40 3925.30 0
2018-03-26 Multi-Stage Fracture 3882.20 3883.10 0
2018-03-26 Multi-Stage Fracture 3840.00 3840.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-26 2018-03-27 2,142 11,309 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.8745 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.9126 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.1135 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0114 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0114 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0114 N/A
Polyethylene glycol 25322-68-3 100 0.0114 N/A
Sodium bromide 7647-15-6 100 0.0114 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0878 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-14 2018-03-24 Surface Water - Runoff 7880
2018-03-14 2018-03-24 Surface Water - Runoff 3576

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5658 0.0 0.0 0.0
2019 7549 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-08 No Incident Encountered 0.00 0.00
2018-04-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References