If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786110209020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.741458,"lon":-119.606288,"icon":""}]} |
Location: 02/09-02-078-11W6/0 | |
Location Alias: 02/09-02-78-11 W6M | |
Location Alias 2: 02/09-02-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 02 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 1-10 HZ 102 PCOUPES 9-2-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0487133 | |
License Date: 2017-12-13 | |
License Status: Issued | |
Spud Date: 2018-01-01 | |
Final Drill Date: 2018-01-11 | |
Well Total Depth: 3898.00 m | |
Surface Hole Latitude: 55.741458 | |
Surface Hole Longitude: -119.606288 |
Date | Event |
---|---|
2017-12-13 | Obtained License |
2018-01-02 | Surface Casing Operation Performed |
2018-01-03 | Direction Drilling Operation Performed - Deviate |
2018-01-07 | Direction Drilling Operation Performed - Horizontal |
2018-01-08 | Well Log Performed |
2018-01-11 | Finished Drilling |
2018-01-11 | Well Log Performed |
2018-01-11 | Well Mode changed to Drilled and Cased |
2018-01-12 | Production Casing Operation Performed |
2018-01-12 | Well Log Performed |
2018-01-13 | Rig Released |
2018-03-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-22 | Perforation Treatment Performed - Open-Hole Completion |
2018-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-07 | Well Log Performed |
2018-04-11 | Well Began Production |
2018-04-11 | Well Fluid changed to Crude Oil |
2018-04-11 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-01 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-03 | 734.70 | Deviate (5 - 79 degrees) |
2018-01-07 | 2332.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-22 | Open Hole/Barefoot Completion | 3893.00 | 3898.00 | 0 |
2018-03-23 | Multi-Stage Fracture | 3657.80 | 3658.70 | 0 |
2018-03-23 | Multi-Stage Fracture | 3628.70 | 3629.60 | 0 |
2018-03-23 | Multi-Stage Fracture | 3600.60 | 3601.50 | 0 |
2018-03-23 | Multi-Stage Fracture | 3571.60 | 3572.50 | 0 |
2018-03-23 | Multi-Stage Fracture | 3543.10 | 3544.00 | 0 |
2018-03-23 | Multi-Stage Fracture | 3514.20 | 3515.10 | 0 |
2018-03-23 | Multi-Stage Fracture | 3485.60 | 3486.50 | 0 |
2018-03-23 | Multi-Stage Fracture | 3459.20 | 3460.10 | 0 |
2018-03-23 | Multi-Stage Fracture | 3430.80 | 3431.70 | 0 |
2018-03-23 | Multi-Stage Fracture | 3401.80 | 3402.70 | 0 |
2018-03-22 | Multi-Stage Fracture | 3881.70 | 3882.90 | 0 |
2018-03-23 | Multi-Stage Fracture | 3372.70 | 3373.60 | 0 |
2018-03-23 | Multi-Stage Fracture | 3343.70 | 3344.60 | 0 |
2018-03-23 | Multi-Stage Fracture | 3314.70 | 3315.60 | 0 |
2018-03-23 | Multi-Stage Fracture | 3285.70 | 3286.60 | 0 |
2018-03-23 | Multi-Stage Fracture | 3256.60 | 3257.50 | 0 |
2018-03-23 | Multi-Stage Fracture | 3227.60 | 3228.50 | 0 |
2018-03-23 | Multi-Stage Fracture | 3198.60 | 3199.50 | 0 |
2018-03-23 | Multi-Stage Fracture | 3169.80 | 3170.70 | 0 |
2018-03-23 | Multi-Stage Fracture | 3129.60 | 3130.50 | 0 |
2018-03-23 | Multi-Stage Fracture | 3087.90 | 3088.80 | 0 |
2018-03-22 | Multi-Stage Fracture | 3860.20 | 3861.10 | 0 |
2018-03-23 | Multi-Stage Fracture | 3045.50 | 3046.40 | 0 |
2018-03-24 | Multi-Stage Fracture | 3003.10 | 3004.00 | 0 |
2018-03-24 | Multi-Stage Fracture | 2960.90 | 2961.80 | 0 |
2018-03-24 | Multi-Stage Fracture | 2918.40 | 2919.30 | 0 |
2018-03-24 | Multi-Stage Fracture | 2876.00 | 2876.90 | 0 |
2018-03-24 | Multi-Stage Fracture | 2833.60 | 2834.50 | 0 |
2018-03-24 | Multi-Stage Fracture | 2791.40 | 2792.30 | 0 |
2018-03-24 | Multi-Stage Fracture | 2748.90 | 2749.80 | 0 |
2018-03-24 | Multi-Stage Fracture | 2706.50 | 2707.40 | 0 |
2018-03-24 | Multi-Stage Fracture | 2664.10 | 2665.00 | 0 |
2018-03-22 | Multi-Stage Fracture | 3831.20 | 3832.10 | 0 |
2018-03-24 | Multi-Stage Fracture | 2621.70 | 2622.60 | 0 |
2018-03-24 | Multi-Stage Fracture | 2579.30 | 2580.20 | 0 |
2018-03-24 | Multi-Stage Fracture | 2537.10 | 2538.00 | 0 |
2018-03-24 | Multi-Stage Fracture | 2494.70 | 2495.60 | 0 |
2018-03-24 | Multi-Stage Fracture | 2452.30 | 2453.20 | 0 |
2018-03-24 | Multi-Stage Fracture | 2409.90 | 2410.80 | 0 |
2018-03-24 | Multi-Stage Fracture | 2367.50 | 2368.40 | 0 |
2018-03-22 | Multi-Stage Fracture | 3802.30 | 3803.20 | 0 |
2018-03-22 | Multi-Stage Fracture | 3773.30 | 3774.20 | 0 |
2018-03-22 | Multi-Stage Fracture | 3744.20 | 3745.10 | 0 |
2018-03-22 | Multi-Stage Fracture | 3715.80 | 3716.70 | 0 |
2018-03-23 | Multi-Stage Fracture | 3686.80 | 3687.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-22 | 2018-03-24 | 2,134 | 12,531 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.24 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.1104 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.6698 | N/A | ||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0114 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0114 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0114 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0114 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0114 | N/A | ||||
DWP-690 | Calfrac | Breaker | Hydrogen peroxide | 7722-84-1 | 100 | 0.0184 | N/A | |
Water | 7732-18-5 | 100 | 0.0184 | N/A | ||||
CalVisc | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1966 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-03-14 | 2018-03-24 | Surface Water - Runoff | 8731 |
2018-03-14 | 2018-03-24 | Surface Water - Runoff | 3962 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5634 | 0.0 | 0.0 | 0.0 |
2019 | 8448 | 0.0 | 0.0 | 0.0 |
2020 | 2163 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-01-13 | No Incident Encountered | 0.00 | 0.00 |
2018-04-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]