If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786110209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.741372,"lon":-119.606369,"icon":""}]} |
Location: 00/09-02-078-11W6/0 | |
Location Alias: 00/09-02-78-11 W6M | |
Location Alias 2: 00/09-02-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 02 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 1-10 HZ PCOUPES 9-2-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0487093 | |
License Date: 2017-12-13 | |
License Status: Issued | |
Spud Date: 2018-01-15 | |
Final Drill Date: 2018-01-24 | |
Well Total Depth: 4019.00 m | |
Surface Hole Latitude: 55.741372 | |
Surface Hole Longitude: -119.606369 |
Date | Event |
---|---|
2017-12-13 | Obtained License |
2018-01-16 | Surface Casing Operation Performed |
2018-01-17 | Direction Drilling Operation Performed - Deviate |
2018-01-21 | Direction Drilling Operation Performed - Horizontal |
2018-01-21 | Well Log Performed |
2018-01-24 | Finished Drilling |
2018-01-24 | Well Log Performed |
2018-01-24 | Well Mode changed to Drilled and Cased |
2018-01-25 | Production Casing Operation Performed |
2018-01-26 | Rig Released |
2018-03-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-24 | Perforation Treatment Performed - Open-Hole Completion |
2018-03-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-08 | Well Log Performed |
2018-04-11 | Well Began Production |
2018-04-11 | Well Fluid changed to Crude Oil |
2018-04-11 | Well Mode changed to Flowing |
2020-02-18 | Well Fluid changed to Crude Oil |
2020-02-18 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-15 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-17 | 791.30 | Deviate (5 - 79 degrees) |
2018-01-21 | 2348.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-24 | Open Hole/Barefoot Completion | 4013.50 | 4019.00 | 0 |
2018-03-25 | Multi-Stage Fracture | 3657.50 | 3658.40 | 0 |
2018-03-25 | Multi-Stage Fracture | 3615.10 | 3616.00 | 0 |
2018-03-25 | Multi-Stage Fracture | 3572.60 | 3573.50 | 0 |
2018-03-25 | Multi-Stage Fracture | 3530.10 | 3531.00 | 0 |
2018-03-25 | Multi-Stage Fracture | 3487.70 | 3488.60 | 0 |
2018-03-25 | Multi-Stage Fracture | 3445.40 | 3446.30 | 0 |
2018-03-25 | Multi-Stage Fracture | 3403.00 | 3403.90 | 0 |
2018-03-25 | Multi-Stage Fracture | 3360.50 | 3361.40 | 0 |
2018-03-25 | Multi-Stage Fracture | 3318.10 | 3319.00 | 0 |
2018-03-25 | Multi-Stage Fracture | 3275.60 | 3276.50 | 0 |
2018-03-24 | Multi-Stage Fracture | 4002.20 | 4003.40 | 0 |
2018-03-25 | Multi-Stage Fracture | 3233.10 | 3234.00 | 0 |
2018-03-25 | Multi-Stage Fracture | 3190.80 | 3191.70 | 0 |
2018-03-25 | Multi-Stage Fracture | 3148.60 | 3149.50 | 0 |
2018-03-25 | Multi-Stage Fracture | 3106.10 | 3107.00 | 0 |
2018-03-25 | Multi-Stage Fracture | 3063.70 | 3064.60 | 0 |
2018-03-25 | Multi-Stage Fracture | 3036.30 | 3037.20 | 0 |
2018-03-25 | Multi-Stage Fracture | 3007.20 | 3008.10 | 0 |
2018-03-25 | Multi-Stage Fracture | 2978.20 | 2979.10 | 0 |
2018-03-25 | Multi-Stage Fracture | 2949.20 | 2950.10 | 0 |
2018-03-25 | Multi-Stage Fracture | 2920.60 | 2921.50 | 0 |
2018-03-24 | Multi-Stage Fracture | 3954.50 | 3955.40 | 0 |
2018-03-25 | Multi-Stage Fracture | 2891.50 | 2892.40 | 0 |
2018-03-25 | Multi-Stage Fracture | 2862.50 | 2863.40 | 0 |
2018-03-25 | Multi-Stage Fracture | 2833.40 | 2834.30 | 0 |
2018-03-25 | Multi-Stage Fracture | 2804.40 | 2805.30 | 0 |
2018-03-25 | Multi-Stage Fracture | 2775.30 | 2776.20 | 0 |
2018-03-25 | Multi-Stage Fracture | 2746.30 | 2747.20 | 0 |
2018-03-25 | Multi-Stage Fracture | 2717.20 | 2718.10 | 0 |
2018-03-25 | Multi-Stage Fracture | 2688.10 | 2689.00 | 0 |
2018-03-25 | Multi-Stage Fracture | 2659.10 | 2660.00 | 0 |
2018-03-25 | Multi-Stage Fracture | 2630.20 | 2631.10 | 0 |
2018-03-24 | Multi-Stage Fracture | 3912.10 | 3913.00 | 0 |
2018-03-25 | Multi-Stage Fracture | 2601.20 | 2602.10 | 0 |
2018-03-26 | Multi-Stage Fracture | 2572.10 | 2573.00 | 0 |
2018-03-26 | Multi-Stage Fracture | 2543.00 | 2543.90 | 0 |
2018-03-26 | Multi-Stage Fracture | 2514.00 | 2514.90 | 0 |
2018-03-26 | Multi-Stage Fracture | 2485.00 | 2485.90 | 0 |
2018-03-26 | Multi-Stage Fracture | 2456.00 | 2456.90 | 0 |
2018-03-26 | Multi-Stage Fracture | 2426.90 | 2427.80 | 0 |
2018-03-24 | Multi-Stage Fracture | 3869.60 | 3870.50 | 0 |
2018-03-24 | Multi-Stage Fracture | 3827.40 | 3828.30 | 0 |
2018-03-24 | Multi-Stage Fracture | 3784.90 | 3785.80 | 0 |
2018-03-24 | Multi-Stage Fracture | 3742.40 | 3743.30 | 0 |
2018-03-25 | Multi-Stage Fracture | 3700.00 | 3700.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-24 | 2018-03-26 | 2,195 | 8,740 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 78.5462 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 21.1346 | N/A | ||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0114 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0114 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0114 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0114 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0114 | N/A | ||||
DWP-690 | Calfrac | Breaker | Hydrogen peroxide | 7722-84-1 | 100 | 0.0322 | N/A | |
Water | 7732-18-5 | 100 | 0.0322 | N/A | ||||
CalVisc | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.2753 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-03-14 | 2018-03-24 | Surface Water - Runoff | 6090 |
2018-03-14 | 2018-03-24 | Surface Water - Runoff | 2763 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5662 | 0.0 | 0.0 | 0.0 |
2019 | 7597 | 0.0 | 0.0 | 0.0 |
2020 | 865 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-01-26 | No Incident Encountered | 0.00 | 0.00 |
2018-04-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]