X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110208020

Well Details

Well ID: 0786110208020
Loading map...
Location: 02/08-02-078-11W6/0
Location Alias: 02/08-02-78-11 W6M
Location Alias 2: 02/08-02-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 02
County/Municipality: Saddle Hills County
Well Name: BIR 1-10 HZ 102 PCOUPES 8-2-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0492683
License Date: 2018-12-10
License Status: Issued
Spud Date: 2019-02-22
Final Drill Date: 2019-03-04
Well Total Depth: 4300.00 m
Surface Hole Latitude: 55.741027
Surface Hole Longitude: -119.606737

For data sources see[1][2]

Well History

Date Event
2018-12-10 Obtained License
2019-02-23 Surface Casing Operation Performed
2019-02-24 Direction Drilling Operation Performed - Deviate
2019-02-28 Direction Drilling Operation Performed - Horizontal
2019-03-04 Finished Drilling
2019-03-04 Well Log Performed
2019-03-04 Well Mode changed to Drilled and Cased
2019-03-05 Production Casing Operation Performed
2019-03-05 Well Log Performed
2019-03-06 Rig Released
2019-05-11 Perforation Treatment Performed - Jet Perforation
2019-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-12 Perforation Treatment Performed - Jet Perforation
2019-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-13 Perforation Treatment Performed - Jet Perforation
2019-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-14 Perforation Treatment Performed - Jet Perforation
2019-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-15 Perforation Treatment Performed - Jet Perforation
2019-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-16 Perforation Treatment Performed - Jet Perforation
2019-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-17 Perforation Treatment Performed - Jet Perforation
2019-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-18 Perforation Treatment Performed - Jet Perforation
2019-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-02 Well Log Performed
2019-06-13 Well Fluid changed to Crude Oil
2019-06-13 Well Mode changed to Drilling and Completing
2019-07-10 Well Began Production
2019-07-10 Well Fluid changed to Crude Oil
2019-07-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-22 Trinidad Drilling Ltd. 60 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-24 629.60 Deviate (5 - 79 degrees)
2019-02-28 2277.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-11 Perforation 4250.50 4250.80 3
2019-05-12 Multi-Stage Fracture 4145.50 4190.80 0
2019-05-16 Multi-Stage Fracture 3065.50 3110.80 0
2019-05-16 Perforation 3050.50 3050.80 3
2019-05-16 Perforation 3035.50 3035.80 3
2019-05-16 Perforation 3020.50 3020.80 3
2019-05-16 Perforation 3005.50 3005.80 3
2019-05-16 Multi-Stage Fracture 3005.50 3050.80 0
2019-05-16 Perforation 2990.50 2990.80 2
2019-05-16 Perforation 2975.50 2975.80 2
2019-05-16 Perforation 2960.50 2960.80 2
2019-05-16 Perforation 2945.50 2945.80 2
2019-05-12 Perforation 4130.50 4130.80 3
2019-05-16 Perforation 2930.50 2930.80 2
2019-05-16 Multi-Stage Fracture 2930.50 2990.80 0
2019-05-16 Perforation 2915.50 2915.80 2
2019-05-16 Perforation 2900.50 2900.80 2
2019-05-16 Perforation 2885.50 2885.80 2
2019-05-16 Perforation 2870.50 2870.80 2
2019-05-16 Perforation 2855.50 2855.80 2
2019-05-16 Multi-Stage Fracture 2855.50 2915.80 0
2019-05-16 Perforation 2840.50 2840.80 2
2019-05-16 Perforation 2825.50 2825.80 2
2019-05-12 Perforation 4115.50 4115.80 3
2019-05-16 Perforation 2810.50 2810.80 2
2019-05-16 Perforation 2795.50 2795.80 2
2019-05-16 Perforation 2780.50 2780.80 2
2019-05-16 Multi-Stage Fracture 2780.50 2840.80 0
2019-05-17 Perforation 2765.50 2765.80 2
2019-05-17 Perforation 2750.50 2750.80 2
2019-05-17 Perforation 2735.50 2735.80 2
2019-05-17 Perforation 2720.50 2720.80 2
2019-05-17 Perforation 2705.50 2705.80 2
2019-05-17 Multi-Stage Fracture 2705.50 2765.80 0
2019-05-12 Perforation 4100.50 4100.80 3
2019-05-17 Perforation 2690.50 2690.80 2
2019-05-17 Perforation 2675.50 2675.80 2
2019-05-17 Perforation 2660.50 2660.80 2
2019-05-17 Perforation 2645.50 2645.80 2
2019-05-17 Perforation 2630.50 2630.80 2
2019-05-17 Multi-Stage Fracture 2630.50 2690.80 0
2019-05-17 Perforation 2615.50 2615.80 2
2019-05-17 Perforation 2600.50 2600.80 2
2019-05-17 Perforation 2585.50 2585.80 2
2019-05-17 Perforation 2570.50 2570.80 2
2019-05-12 Perforation 4085.50 4085.80 3
2019-05-17 Perforation 2555.50 2555.80 2
2019-05-17 Multi-Stage Fracture 2555.50 2615.80 0
2019-05-17 Perforation 2540.50 2540.80 2
2019-05-17 Perforation 2525.50 2525.80 2
2019-05-17 Perforation 2510.50 2510.80 2
2019-05-17 Perforation 2495.50 2495.80 2
2019-05-17 Perforation 2480.50 2480.80 2
2019-05-17 Multi-Stage Fracture 2480.50 2540.80 0
2019-05-17 Perforation 2465.50 2465.80 2
2019-05-17 Perforation 2450.50 2450.80 2
2019-05-12 Multi-Stage Fracture 4085.50 4130.80 0
2019-05-17 Perforation 2435.50 2435.80 2
2019-05-17 Perforation 2420.50 2420.80 2
2019-05-17 Perforation 2405.50 2405.80 2
2019-05-17 Multi-Stage Fracture 2405.50 2465.80 0
2019-05-17 Perforation 2390.50 2390.80 2
2019-05-17 Perforation 2375.50 2375.80 2
2019-05-17 Perforation 2360.50 2360.80 2
2019-05-17 Perforation 2345.50 2345.80 2
2019-05-17 Perforation 2330.50 2330.80 2
2019-05-18 Multi-Stage Fracture 2330.50 2390.80 0
2019-05-12 Perforation 4070.50 4070.80 3
2019-05-18 Perforation 2315.50 2315.80 2
2019-05-18 Perforation 2300.50 2300.80 2
2019-05-18 Perforation 2285.50 2285.80 2
2019-05-18 Perforation 2270.50 2270.80 2
2019-05-18 Perforation 2255.50 2255.80 2
2019-05-18 Multi-Stage Fracture 2255.50 2315.80 0
2019-05-18 Perforation 2240.50 2240.80 1
2019-05-18 Perforation 2225.50 2225.80 1
2019-05-12 Perforation 4055.50 4055.80 3
2019-05-12 Perforation 4040.50 4040.80 3
2019-05-12 Perforation 4025.50 4025.80 3
2019-05-11 Perforation 4235.50 4235.80 3
2019-05-12 Multi-Stage Fracture 4025.50 4070.80 0
2019-05-13 Perforation 4010.50 4010.80 3
2019-05-13 Perforation 3995.50 3995.80 3
2019-05-13 Perforation 3980.50 3980.80 3
2019-05-13 Perforation 3965.50 3965.80 3
2019-05-13 Multi-Stage Fracture 3965.50 4010.80 0
2019-05-13 Perforation 3950.50 3950.80 3
2019-05-13 Perforation 3935.50 3935.80 3
2019-05-13 Perforation 3920.50 3920.80 3
2019-05-13 Perforation 3905.50 3905.80 3
2019-05-11 Perforation 4220.50 4220.80 3
2019-05-13 Multi-Stage Fracture 3905.50 3950.80 0
2019-05-13 Perforation 3890.50 3890.80 3
2019-05-13 Perforation 3875.50 3875.80 3
2019-05-13 Perforation 3860.50 3860.80 3
2019-05-13 Perforation 3845.50 3845.80 3
2019-05-13 Multi-Stage Fracture 3845.50 3890.80 0
2019-05-13 Perforation 3830.50 3830.80 3
2019-05-13 Perforation 3815.50 3815.80 3
2019-05-13 Perforation 3800.50 3800.80 3
2019-05-13 Perforation 3785.50 3785.80 3
2019-05-11 Perforation 4205.50 4205.80 3
2019-05-13 Multi-Stage Fracture 3785.50 3830.80 0
2019-05-13 Perforation 3770.50 3770.80 3
2019-05-13 Perforation 3755.50 3755.80 3
2019-05-13 Perforation 3740.50 3740.80 3
2019-05-13 Perforation 3725.50 3725.80 3
2019-05-14 Multi-Stage Fracture 3725.50 3770.80 0
2019-05-14 Perforation 3710.50 3710.80 3
2019-05-14 Perforation 3695.50 3695.80 3
2019-05-14 Perforation 3680.50 3680.80 3
2019-05-14 Perforation 3665.50 3665.80 3
2019-05-11 Multi-Stage Fracture 4205.50 4250.80 0
2019-05-14 Multi-Stage Fracture 3665.50 3710.80 0
2019-05-14 Perforation 3650.50 3650.80 3
2019-05-14 Perforation 3635.50 3635.80 3
2019-05-14 Perforation 3620.50 3620.80 3
2019-05-14 Perforation 3605.50 3605.80 3
2019-05-14 Multi-Stage Fracture 3605.50 3650.80 0
2019-05-14 Perforation 3590.50 3590.80 3
2019-05-14 Perforation 3575.50 3575.80 3
2019-05-14 Perforation 3560.50 3560.80 3
2019-05-14 Perforation 3545.50 3545.80 3
2019-05-12 Perforation 4190.50 4190.80 3
2019-05-14 Multi-Stage Fracture 3545.50 3590.80 0
2019-05-14 Perforation 3530.50 3530.80 3
2019-05-14 Perforation 3515.50 3515.80 3
2019-05-14 Perforation 3500.50 3500.80 3
2019-05-14 Perforation 3485.50 3485.80 3
2019-05-14 Multi-Stage Fracture 3485.50 3530.80 0
2019-05-15 Perforation 3470.50 3470.80 3
2019-05-15 Perforation 3455.50 3455.80 3
2019-05-15 Perforation 3440.50 3440.80 3
2019-05-15 Perforation 3425.50 3425.80 3
2019-05-12 Perforation 4175.50 4175.80 3
2019-05-15 Multi-Stage Fracture 3425.50 3470.80 0
2019-05-15 Perforation 3410.50 3410.80 3
2019-05-15 Perforation 3395.50 3395.80 3
2019-05-15 Perforation 3380.50 3380.80 3
2019-05-15 Perforation 3365.50 3365.80 3
2019-05-15 Multi-Stage Fracture 3365.50 3410.80 0
2019-05-15 Perforation 3350.50 3350.80 3
2019-05-15 Perforation 3335.50 3335.80 3
2019-05-15 Perforation 3320.50 3320.80 3
2019-05-15 Perforation 3305.50 3305.80 3
2019-05-12 Perforation 4160.50 4160.80 3
2019-05-15 Multi-Stage Fracture 3305.50 3350.80 0
2019-05-15 Perforation 3290.50 3290.80 3
2019-05-15 Perforation 3275.50 3275.80 3
2019-05-15 Perforation 3260.50 3260.80 3
2019-05-15 Perforation 3245.50 3245.80 3
2019-05-15 Multi-Stage Fracture 3245.50 3290.80 0
2019-05-15 Perforation 3230.50 3230.80 3
2019-05-15 Perforation 3215.50 3215.80 3
2019-05-15 Perforation 3200.50 3200.80 3
2019-05-15 Perforation 3185.50 3185.80 3
2019-05-12 Perforation 4145.50 4145.80 3
2019-05-15 Multi-Stage Fracture 3185.50 3230.80 0
2019-05-16 Perforation 3170.50 3170.80 3
2019-05-16 Perforation 3155.50 3155.80 3
2019-05-16 Perforation 3140.50 3140.80 3
2019-05-16 Perforation 3125.50 3125.80 3
2019-05-16 Multi-Stage Fracture 3125.50 3170.80 0
2019-05-16 Perforation 3110.50 3110.80 3
2019-05-16 Perforation 3095.50 3095.80 3
2019-05-16 Perforation 3080.50 3080.80 3
2019-05-16 Perforation 3065.50 3065.80 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-11 2019-05-18 2,154 15,482 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.7271 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 16.4827 N/A
Enviro-Syn HCR Fluid Energy Group Ltd. Acid Non-Hazardous Ingredients Trade Secret 100 0.7493 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0112 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0112 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0112 N/A
Polyethylene glycol 25322-68-3 100 0.0112 N/A
Sodium bromide 7647-15-6 100 0.0112 N/A
CalVisc?. High Viscosity Friction Reducer Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0051 N/A
DynaRate 6202D. Friction Reducer Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0242 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4178 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-06 No Incident Encountered 0.00 0.00
2019-06-04 No Incident Encountered 0.00 0.00

For data sources see[9]

References