If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786110208020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.741027,"lon":-119.606737,"icon":""}]} |
Location: 02/08-02-078-11W6/0 | |
Location Alias: 02/08-02-78-11 W6M | |
Location Alias 2: 02/08-02-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 02 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 1-10 HZ 102 PCOUPES 8-2-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0492683 | |
License Date: 2018-12-10 | |
License Status: Issued | |
Spud Date: 2019-02-22 | |
Final Drill Date: 2019-03-04 | |
Well Total Depth: 4300.00 m | |
Surface Hole Latitude: 55.741027 | |
Surface Hole Longitude: -119.606737 |
Date | Event |
---|---|
2018-12-10 | Obtained License |
2019-02-23 | Surface Casing Operation Performed |
2019-02-24 | Direction Drilling Operation Performed - Deviate |
2019-02-28 | Direction Drilling Operation Performed - Horizontal |
2019-03-04 | Finished Drilling |
2019-03-04 | Well Log Performed |
2019-03-04 | Well Mode changed to Drilled and Cased |
2019-03-05 | Production Casing Operation Performed |
2019-03-05 | Well Log Performed |
2019-03-06 | Rig Released |
2019-05-11 | Perforation Treatment Performed - Jet Perforation |
2019-05-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-12 | Perforation Treatment Performed - Jet Perforation |
2019-05-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-13 | Perforation Treatment Performed - Jet Perforation |
2019-05-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-14 | Perforation Treatment Performed - Jet Perforation |
2019-05-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-15 | Perforation Treatment Performed - Jet Perforation |
2019-05-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-16 | Perforation Treatment Performed - Jet Perforation |
2019-05-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-17 | Perforation Treatment Performed - Jet Perforation |
2019-05-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-18 | Perforation Treatment Performed - Jet Perforation |
2019-05-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-02 | Well Log Performed |
2019-06-13 | Well Fluid changed to Crude Oil |
2019-06-13 | Well Mode changed to Drilling and Completing |
2019-07-10 | Well Began Production |
2019-07-10 | Well Fluid changed to Crude Oil |
2019-07-10 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-02-22 | Trinidad Drilling Ltd. | 60 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-02-24 | 629.60 | Deviate (5 - 79 degrees) |
2019-02-28 | 2277.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-05-11 | Perforation | 4250.50 | 4250.80 | 3 |
2019-05-12 | Multi-Stage Fracture | 4145.50 | 4190.80 | 0 |
2019-05-16 | Multi-Stage Fracture | 3065.50 | 3110.80 | 0 |
2019-05-16 | Perforation | 3050.50 | 3050.80 | 3 |
2019-05-16 | Perforation | 3035.50 | 3035.80 | 3 |
2019-05-16 | Perforation | 3020.50 | 3020.80 | 3 |
2019-05-16 | Perforation | 3005.50 | 3005.80 | 3 |
2019-05-16 | Multi-Stage Fracture | 3005.50 | 3050.80 | 0 |
2019-05-16 | Perforation | 2990.50 | 2990.80 | 2 |
2019-05-16 | Perforation | 2975.50 | 2975.80 | 2 |
2019-05-16 | Perforation | 2960.50 | 2960.80 | 2 |
2019-05-16 | Perforation | 2945.50 | 2945.80 | 2 |
2019-05-12 | Perforation | 4130.50 | 4130.80 | 3 |
2019-05-16 | Perforation | 2930.50 | 2930.80 | 2 |
2019-05-16 | Multi-Stage Fracture | 2930.50 | 2990.80 | 0 |
2019-05-16 | Perforation | 2915.50 | 2915.80 | 2 |
2019-05-16 | Perforation | 2900.50 | 2900.80 | 2 |
2019-05-16 | Perforation | 2885.50 | 2885.80 | 2 |
2019-05-16 | Perforation | 2870.50 | 2870.80 | 2 |
2019-05-16 | Perforation | 2855.50 | 2855.80 | 2 |
2019-05-16 | Multi-Stage Fracture | 2855.50 | 2915.80 | 0 |
2019-05-16 | Perforation | 2840.50 | 2840.80 | 2 |
2019-05-16 | Perforation | 2825.50 | 2825.80 | 2 |
2019-05-12 | Perforation | 4115.50 | 4115.80 | 3 |
2019-05-16 | Perforation | 2810.50 | 2810.80 | 2 |
2019-05-16 | Perforation | 2795.50 | 2795.80 | 2 |
2019-05-16 | Perforation | 2780.50 | 2780.80 | 2 |
2019-05-16 | Multi-Stage Fracture | 2780.50 | 2840.80 | 0 |
2019-05-17 | Perforation | 2765.50 | 2765.80 | 2 |
2019-05-17 | Perforation | 2750.50 | 2750.80 | 2 |
2019-05-17 | Perforation | 2735.50 | 2735.80 | 2 |
2019-05-17 | Perforation | 2720.50 | 2720.80 | 2 |
2019-05-17 | Perforation | 2705.50 | 2705.80 | 2 |
2019-05-17 | Multi-Stage Fracture | 2705.50 | 2765.80 | 0 |
2019-05-12 | Perforation | 4100.50 | 4100.80 | 3 |
2019-05-17 | Perforation | 2690.50 | 2690.80 | 2 |
2019-05-17 | Perforation | 2675.50 | 2675.80 | 2 |
2019-05-17 | Perforation | 2660.50 | 2660.80 | 2 |
2019-05-17 | Perforation | 2645.50 | 2645.80 | 2 |
2019-05-17 | Perforation | 2630.50 | 2630.80 | 2 |
2019-05-17 | Multi-Stage Fracture | 2630.50 | 2690.80 | 0 |
2019-05-17 | Perforation | 2615.50 | 2615.80 | 2 |
2019-05-17 | Perforation | 2600.50 | 2600.80 | 2 |
2019-05-17 | Perforation | 2585.50 | 2585.80 | 2 |
2019-05-17 | Perforation | 2570.50 | 2570.80 | 2 |
2019-05-12 | Perforation | 4085.50 | 4085.80 | 3 |
2019-05-17 | Perforation | 2555.50 | 2555.80 | 2 |
2019-05-17 | Multi-Stage Fracture | 2555.50 | 2615.80 | 0 |
2019-05-17 | Perforation | 2540.50 | 2540.80 | 2 |
2019-05-17 | Perforation | 2525.50 | 2525.80 | 2 |
2019-05-17 | Perforation | 2510.50 | 2510.80 | 2 |
2019-05-17 | Perforation | 2495.50 | 2495.80 | 2 |
2019-05-17 | Perforation | 2480.50 | 2480.80 | 2 |
2019-05-17 | Multi-Stage Fracture | 2480.50 | 2540.80 | 0 |
2019-05-17 | Perforation | 2465.50 | 2465.80 | 2 |
2019-05-17 | Perforation | 2450.50 | 2450.80 | 2 |
2019-05-12 | Multi-Stage Fracture | 4085.50 | 4130.80 | 0 |
2019-05-17 | Perforation | 2435.50 | 2435.80 | 2 |
2019-05-17 | Perforation | 2420.50 | 2420.80 | 2 |
2019-05-17 | Perforation | 2405.50 | 2405.80 | 2 |
2019-05-17 | Multi-Stage Fracture | 2405.50 | 2465.80 | 0 |
2019-05-17 | Perforation | 2390.50 | 2390.80 | 2 |
2019-05-17 | Perforation | 2375.50 | 2375.80 | 2 |
2019-05-17 | Perforation | 2360.50 | 2360.80 | 2 |
2019-05-17 | Perforation | 2345.50 | 2345.80 | 2 |
2019-05-17 | Perforation | 2330.50 | 2330.80 | 2 |
2019-05-18 | Multi-Stage Fracture | 2330.50 | 2390.80 | 0 |
2019-05-12 | Perforation | 4070.50 | 4070.80 | 3 |
2019-05-18 | Perforation | 2315.50 | 2315.80 | 2 |
2019-05-18 | Perforation | 2300.50 | 2300.80 | 2 |
2019-05-18 | Perforation | 2285.50 | 2285.80 | 2 |
2019-05-18 | Perforation | 2270.50 | 2270.80 | 2 |
2019-05-18 | Perforation | 2255.50 | 2255.80 | 2 |
2019-05-18 | Multi-Stage Fracture | 2255.50 | 2315.80 | 0 |
2019-05-18 | Perforation | 2240.50 | 2240.80 | 1 |
2019-05-18 | Perforation | 2225.50 | 2225.80 | 1 |
2019-05-12 | Perforation | 4055.50 | 4055.80 | 3 |
2019-05-12 | Perforation | 4040.50 | 4040.80 | 3 |
2019-05-12 | Perforation | 4025.50 | 4025.80 | 3 |
2019-05-11 | Perforation | 4235.50 | 4235.80 | 3 |
2019-05-12 | Multi-Stage Fracture | 4025.50 | 4070.80 | 0 |
2019-05-13 | Perforation | 4010.50 | 4010.80 | 3 |
2019-05-13 | Perforation | 3995.50 | 3995.80 | 3 |
2019-05-13 | Perforation | 3980.50 | 3980.80 | 3 |
2019-05-13 | Perforation | 3965.50 | 3965.80 | 3 |
2019-05-13 | Multi-Stage Fracture | 3965.50 | 4010.80 | 0 |
2019-05-13 | Perforation | 3950.50 | 3950.80 | 3 |
2019-05-13 | Perforation | 3935.50 | 3935.80 | 3 |
2019-05-13 | Perforation | 3920.50 | 3920.80 | 3 |
2019-05-13 | Perforation | 3905.50 | 3905.80 | 3 |
2019-05-11 | Perforation | 4220.50 | 4220.80 | 3 |
2019-05-13 | Multi-Stage Fracture | 3905.50 | 3950.80 | 0 |
2019-05-13 | Perforation | 3890.50 | 3890.80 | 3 |
2019-05-13 | Perforation | 3875.50 | 3875.80 | 3 |
2019-05-13 | Perforation | 3860.50 | 3860.80 | 3 |
2019-05-13 | Perforation | 3845.50 | 3845.80 | 3 |
2019-05-13 | Multi-Stage Fracture | 3845.50 | 3890.80 | 0 |
2019-05-13 | Perforation | 3830.50 | 3830.80 | 3 |
2019-05-13 | Perforation | 3815.50 | 3815.80 | 3 |
2019-05-13 | Perforation | 3800.50 | 3800.80 | 3 |
2019-05-13 | Perforation | 3785.50 | 3785.80 | 3 |
2019-05-11 | Perforation | 4205.50 | 4205.80 | 3 |
2019-05-13 | Multi-Stage Fracture | 3785.50 | 3830.80 | 0 |
2019-05-13 | Perforation | 3770.50 | 3770.80 | 3 |
2019-05-13 | Perforation | 3755.50 | 3755.80 | 3 |
2019-05-13 | Perforation | 3740.50 | 3740.80 | 3 |
2019-05-13 | Perforation | 3725.50 | 3725.80 | 3 |
2019-05-14 | Multi-Stage Fracture | 3725.50 | 3770.80 | 0 |
2019-05-14 | Perforation | 3710.50 | 3710.80 | 3 |
2019-05-14 | Perforation | 3695.50 | 3695.80 | 3 |
2019-05-14 | Perforation | 3680.50 | 3680.80 | 3 |
2019-05-14 | Perforation | 3665.50 | 3665.80 | 3 |
2019-05-11 | Multi-Stage Fracture | 4205.50 | 4250.80 | 0 |
2019-05-14 | Multi-Stage Fracture | 3665.50 | 3710.80 | 0 |
2019-05-14 | Perforation | 3650.50 | 3650.80 | 3 |
2019-05-14 | Perforation | 3635.50 | 3635.80 | 3 |
2019-05-14 | Perforation | 3620.50 | 3620.80 | 3 |
2019-05-14 | Perforation | 3605.50 | 3605.80 | 3 |
2019-05-14 | Multi-Stage Fracture | 3605.50 | 3650.80 | 0 |
2019-05-14 | Perforation | 3590.50 | 3590.80 | 3 |
2019-05-14 | Perforation | 3575.50 | 3575.80 | 3 |
2019-05-14 | Perforation | 3560.50 | 3560.80 | 3 |
2019-05-14 | Perforation | 3545.50 | 3545.80 | 3 |
2019-05-12 | Perforation | 4190.50 | 4190.80 | 3 |
2019-05-14 | Multi-Stage Fracture | 3545.50 | 3590.80 | 0 |
2019-05-14 | Perforation | 3530.50 | 3530.80 | 3 |
2019-05-14 | Perforation | 3515.50 | 3515.80 | 3 |
2019-05-14 | Perforation | 3500.50 | 3500.80 | 3 |
2019-05-14 | Perforation | 3485.50 | 3485.80 | 3 |
2019-05-14 | Multi-Stage Fracture | 3485.50 | 3530.80 | 0 |
2019-05-15 | Perforation | 3470.50 | 3470.80 | 3 |
2019-05-15 | Perforation | 3455.50 | 3455.80 | 3 |
2019-05-15 | Perforation | 3440.50 | 3440.80 | 3 |
2019-05-15 | Perforation | 3425.50 | 3425.80 | 3 |
2019-05-12 | Perforation | 4175.50 | 4175.80 | 3 |
2019-05-15 | Multi-Stage Fracture | 3425.50 | 3470.80 | 0 |
2019-05-15 | Perforation | 3410.50 | 3410.80 | 3 |
2019-05-15 | Perforation | 3395.50 | 3395.80 | 3 |
2019-05-15 | Perforation | 3380.50 | 3380.80 | 3 |
2019-05-15 | Perforation | 3365.50 | 3365.80 | 3 |
2019-05-15 | Multi-Stage Fracture | 3365.50 | 3410.80 | 0 |
2019-05-15 | Perforation | 3350.50 | 3350.80 | 3 |
2019-05-15 | Perforation | 3335.50 | 3335.80 | 3 |
2019-05-15 | Perforation | 3320.50 | 3320.80 | 3 |
2019-05-15 | Perforation | 3305.50 | 3305.80 | 3 |
2019-05-12 | Perforation | 4160.50 | 4160.80 | 3 |
2019-05-15 | Multi-Stage Fracture | 3305.50 | 3350.80 | 0 |
2019-05-15 | Perforation | 3290.50 | 3290.80 | 3 |
2019-05-15 | Perforation | 3275.50 | 3275.80 | 3 |
2019-05-15 | Perforation | 3260.50 | 3260.80 | 3 |
2019-05-15 | Perforation | 3245.50 | 3245.80 | 3 |
2019-05-15 | Multi-Stage Fracture | 3245.50 | 3290.80 | 0 |
2019-05-15 | Perforation | 3230.50 | 3230.80 | 3 |
2019-05-15 | Perforation | 3215.50 | 3215.80 | 3 |
2019-05-15 | Perforation | 3200.50 | 3200.80 | 3 |
2019-05-15 | Perforation | 3185.50 | 3185.80 | 3 |
2019-05-12 | Perforation | 4145.50 | 4145.80 | 3 |
2019-05-15 | Multi-Stage Fracture | 3185.50 | 3230.80 | 0 |
2019-05-16 | Perforation | 3170.50 | 3170.80 | 3 |
2019-05-16 | Perforation | 3155.50 | 3155.80 | 3 |
2019-05-16 | Perforation | 3140.50 | 3140.80 | 3 |
2019-05-16 | Perforation | 3125.50 | 3125.80 | 3 |
2019-05-16 | Multi-Stage Fracture | 3125.50 | 3170.80 | 0 |
2019-05-16 | Perforation | 3110.50 | 3110.80 | 3 |
2019-05-16 | Perforation | 3095.50 | 3095.80 | 3 |
2019-05-16 | Perforation | 3080.50 | 3080.80 | 3 |
2019-05-16 | Perforation | 3065.50 | 3065.80 | 3 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-05-11 | 2019-05-18 | 2,154 | 15,482 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.7271 | N/A | |||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 16.4827 | N/A | ||
Enviro-Syn HCR | Fluid Energy Group Ltd. | Acid | Non-Hazardous Ingredients | Trade Secret | 100 | 0.7493 | N/A | |
SaniFrac 8844. Biocide | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0112 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0112 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0112 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0112 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0112 | N/A | ||||
CalVisc?. High Viscosity Friction Reducer | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0051 | N/A | |
DynaRate 6202D. Friction Reducer | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0242 | N/A |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 4178 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-03-06 | No Incident Encountered | 0.00 | 0.00 |
2019-06-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]