If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786110208000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.741218,"lon":-119.606532,"icon":""}]} |
Location: 00/08-02-078-11W6/0 | |
Location Alias: 00/08-02-78-11 W6M | |
Location Alias 2: 00/08-02-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 02 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 1-10 HZ PCOUPES 8-2-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0487243 | |
License Date: 2017-12-15 | |
License Status: Issued | |
Spud Date: 2018-02-10 | |
Final Drill Date: 2018-02-19 | |
Well Total Depth: 4315.00 m | |
Surface Hole Latitude: 55.741218 | |
Surface Hole Longitude: -119.606532 |
Date | Event |
---|---|
2017-12-15 | Obtained License |
2018-02-11 | Surface Casing Operation Performed |
2018-02-12 | Direction Drilling Operation Performed - Deviate |
2018-02-15 | Direction Drilling Operation Performed - Horizontal |
2018-02-15 | Well Log Performed |
2018-02-19 | Finished Drilling |
2018-02-19 | Well Log Performed |
2018-02-19 | Well Mode changed to Drilled and Cased |
2018-02-20 | Production Casing Operation Performed |
2018-02-21 | Rig Released |
2018-03-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-28 | Perforation Treatment Performed - Open-Hole Completion |
2018-03-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-09 | Well Log Performed |
2018-04-13 | Well Began Production |
2018-04-13 | Well Fluid changed to Crude Oil |
2018-04-13 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-02-10 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-12 | 893.80 | Deviate (5 - 79 degrees) |
2018-02-15 | 2348.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-28 | Open Hole/Barefoot Completion | 4310.00 | 4315.00 | 0 |
2018-03-28 | Multi-Stage Fracture | 3929.70 | 3930.60 | 0 |
2018-03-28 | Multi-Stage Fracture | 3887.30 | 3888.20 | 0 |
2018-03-28 | Multi-Stage Fracture | 3844.90 | 3845.80 | 0 |
2018-03-28 | Multi-Stage Fracture | 3802.80 | 3803.70 | 0 |
2018-03-28 | Multi-Stage Fracture | 3760.60 | 3761.50 | 0 |
2018-03-28 | Multi-Stage Fracture | 3718.20 | 3719.10 | 0 |
2018-03-28 | Multi-Stage Fracture | 3675.70 | 3676.60 | 0 |
2018-03-28 | Multi-Stage Fracture | 3633.90 | 3634.80 | 0 |
2018-03-28 | Multi-Stage Fracture | 3591.60 | 3592.50 | 0 |
2018-03-28 | Multi-Stage Fracture | 3549.30 | 3550.20 | 0 |
2018-03-28 | Multi-Stage Fracture | 4271.40 | 4272.70 | 0 |
2018-03-28 | Multi-Stage Fracture | 3507.70 | 3508.60 | 0 |
2018-03-29 | Multi-Stage Fracture | 3465.80 | 3466.70 | 0 |
2018-03-29 | Multi-Stage Fracture | 3423.40 | 3424.30 | 0 |
2018-03-29 | Multi-Stage Fracture | 3381.00 | 3381.90 | 0 |
2018-03-29 | Multi-Stage Fracture | 3338.80 | 3339.70 | 0 |
2018-03-29 | Multi-Stage Fracture | 3296.40 | 3297.30 | 0 |
2018-03-29 | Multi-Stage Fracture | 3254.20 | 3255.10 | 0 |
2018-03-29 | Multi-Stage Fracture | 3211.90 | 3212.80 | 0 |
2018-03-29 | Multi-Stage Fracture | 3171.30 | 3172.20 | 0 |
2018-03-29 | Multi-Stage Fracture | 3131.20 | 3132.10 | 0 |
2018-03-28 | Multi-Stage Fracture | 4223.50 | 4224.40 | 0 |
2018-03-29 | Multi-Stage Fracture | 3088.80 | 3089.70 | 0 |
2018-03-29 | Multi-Stage Fracture | 3046.40 | 3047.30 | 0 |
2018-03-29 | Multi-Stage Fracture | 3004.60 | 3005.50 | 0 |
2018-03-29 | Multi-Stage Fracture | 2962.40 | 2963.30 | 0 |
2018-03-29 | Multi-Stage Fracture | 2921.00 | 2921.90 | 0 |
2018-03-29 | Multi-Stage Fracture | 2878.50 | 2879.40 | 0 |
2018-03-29 | Multi-Stage Fracture | 2836.10 | 2837.00 | 0 |
2018-03-29 | Multi-Stage Fracture | 2794.00 | 2794.90 | 0 |
2018-03-29 | Multi-Stage Fracture | 2751.60 | 2752.50 | 0 |
2018-03-29 | Multi-Stage Fracture | 2709.10 | 2710.00 | 0 |
2018-03-28 | Multi-Stage Fracture | 4181.10 | 4182.00 | 0 |
2018-03-29 | Multi-Stage Fracture | 2666.90 | 2667.80 | 0 |
2018-03-29 | Multi-Stage Fracture | 2626.00 | 2626.90 | 0 |
2018-03-29 | Multi-Stage Fracture | 2583.50 | 2584.40 | 0 |
2018-03-29 | Multi-Stage Fracture | 2541.10 | 2542.00 | 0 |
2018-03-29 | Multi-Stage Fracture | 2498.80 | 2499.70 | 0 |
2018-03-29 | Multi-Stage Fracture | 2458.50 | 2459.40 | 0 |
2018-03-29 | Multi-Stage Fracture | 2429.50 | 2430.40 | 0 |
2018-03-28 | Multi-Stage Fracture | 4139.20 | 4140.10 | 0 |
2018-03-28 | Multi-Stage Fracture | 4097.40 | 4098.30 | 0 |
2018-03-28 | Multi-Stage Fracture | 4055.20 | 4056.10 | 0 |
2018-03-28 | Multi-Stage Fracture | 4012.90 | 4013.80 | 0 |
2018-03-28 | Multi-Stage Fracture | 3970.90 | 3971.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-28 | 2018-03-29 | 2,200 | 9,759 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 80.7079 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 19.1953 | N/A | ||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0115 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0115 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0115 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0115 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0115 | N/A | ||||
CalVisc | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0852 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-03-14 | 2018-03-24 | Surface Water - Runoff | 6800 |
2018-03-14 | 2018-03-24 | Surface Water - Runoff | 3086 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5639 | 0.0 | 0.0 | 0.0 |
2019 | 6773 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-21 | No Incident Encountered | 0.00 | 0.00 |
2018-04-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]