X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110208000

Well Details

Well ID: 0786110208000
Loading map...
Location: 00/08-02-078-11W6/0
Location Alias: 00/08-02-78-11 W6M
Location Alias 2: 00/08-02-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 02
County/Municipality: Saddle Hills County
Well Name: BIR 1-10 HZ PCOUPES 8-2-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0487243
License Date: 2017-12-15
License Status: Issued
Spud Date: 2018-02-10
Final Drill Date: 2018-02-19
Well Total Depth: 4315.00 m
Surface Hole Latitude: 55.741218
Surface Hole Longitude: -119.606532

For data sources see[1][2]

Well History

Date Event
2017-12-15 Obtained License
2018-02-11 Surface Casing Operation Performed
2018-02-12 Direction Drilling Operation Performed - Deviate
2018-02-15 Direction Drilling Operation Performed - Horizontal
2018-02-15 Well Log Performed
2018-02-19 Finished Drilling
2018-02-19 Well Log Performed
2018-02-19 Well Mode changed to Drilled and Cased
2018-02-20 Production Casing Operation Performed
2018-02-21 Rig Released
2018-03-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-28 Perforation Treatment Performed - Open-Hole Completion
2018-03-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-09 Well Log Performed
2018-04-13 Well Began Production
2018-04-13 Well Fluid changed to Crude Oil
2018-04-13 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-10 Trinidad Drilling Ltd. 449 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-12 893.80 Deviate (5 - 79 degrees)
2018-02-15 2348.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-28 Open Hole/Barefoot Completion 4310.00 4315.00 0
2018-03-28 Multi-Stage Fracture 3929.70 3930.60 0
2018-03-28 Multi-Stage Fracture 3887.30 3888.20 0
2018-03-28 Multi-Stage Fracture 3844.90 3845.80 0
2018-03-28 Multi-Stage Fracture 3802.80 3803.70 0
2018-03-28 Multi-Stage Fracture 3760.60 3761.50 0
2018-03-28 Multi-Stage Fracture 3718.20 3719.10 0
2018-03-28 Multi-Stage Fracture 3675.70 3676.60 0
2018-03-28 Multi-Stage Fracture 3633.90 3634.80 0
2018-03-28 Multi-Stage Fracture 3591.60 3592.50 0
2018-03-28 Multi-Stage Fracture 3549.30 3550.20 0
2018-03-28 Multi-Stage Fracture 4271.40 4272.70 0
2018-03-28 Multi-Stage Fracture 3507.70 3508.60 0
2018-03-29 Multi-Stage Fracture 3465.80 3466.70 0
2018-03-29 Multi-Stage Fracture 3423.40 3424.30 0
2018-03-29 Multi-Stage Fracture 3381.00 3381.90 0
2018-03-29 Multi-Stage Fracture 3338.80 3339.70 0
2018-03-29 Multi-Stage Fracture 3296.40 3297.30 0
2018-03-29 Multi-Stage Fracture 3254.20 3255.10 0
2018-03-29 Multi-Stage Fracture 3211.90 3212.80 0
2018-03-29 Multi-Stage Fracture 3171.30 3172.20 0
2018-03-29 Multi-Stage Fracture 3131.20 3132.10 0
2018-03-28 Multi-Stage Fracture 4223.50 4224.40 0
2018-03-29 Multi-Stage Fracture 3088.80 3089.70 0
2018-03-29 Multi-Stage Fracture 3046.40 3047.30 0
2018-03-29 Multi-Stage Fracture 3004.60 3005.50 0
2018-03-29 Multi-Stage Fracture 2962.40 2963.30 0
2018-03-29 Multi-Stage Fracture 2921.00 2921.90 0
2018-03-29 Multi-Stage Fracture 2878.50 2879.40 0
2018-03-29 Multi-Stage Fracture 2836.10 2837.00 0
2018-03-29 Multi-Stage Fracture 2794.00 2794.90 0
2018-03-29 Multi-Stage Fracture 2751.60 2752.50 0
2018-03-29 Multi-Stage Fracture 2709.10 2710.00 0
2018-03-28 Multi-Stage Fracture 4181.10 4182.00 0
2018-03-29 Multi-Stage Fracture 2666.90 2667.80 0
2018-03-29 Multi-Stage Fracture 2626.00 2626.90 0
2018-03-29 Multi-Stage Fracture 2583.50 2584.40 0
2018-03-29 Multi-Stage Fracture 2541.10 2542.00 0
2018-03-29 Multi-Stage Fracture 2498.80 2499.70 0
2018-03-29 Multi-Stage Fracture 2458.50 2459.40 0
2018-03-29 Multi-Stage Fracture 2429.50 2430.40 0
2018-03-28 Multi-Stage Fracture 4139.20 4140.10 0
2018-03-28 Multi-Stage Fracture 4097.40 4098.30 0
2018-03-28 Multi-Stage Fracture 4055.20 4056.10 0
2018-03-28 Multi-Stage Fracture 4012.90 4013.80 0
2018-03-28 Multi-Stage Fracture 3970.90 3971.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-28 2018-03-29 2,200 9,759 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 80.7079 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 19.1953 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0115 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0115 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0115 N/A
Polyethylene glycol 25322-68-3 100 0.0115 N/A
Sodium bromide 7647-15-6 100 0.0115 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0852 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-14 2018-03-24 Surface Water - Runoff 6800
2018-03-14 2018-03-24 Surface Water - Runoff 3086

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5639 0.0 0.0 0.0
2019 6773 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-21 No Incident Encountered 0.00 0.00
2018-04-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References