X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110201000

Well Details

Well ID: 0786110201000
Loading map...
Location: 00/01-02-078-11W6/0
Location Alias: 00/01-02-78-11 W6M
Location Alias 2: 00/01-02-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 02
County/Municipality: Saddle Hills County
Well Name: BIR 1-10 HZ PCOUPES 1-2-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0492690
License Date: 2018-12-10
License Status: Issued
Spud Date: 2019-03-21
Final Drill Date: 2019-04-02
Well Total Depth: 4509.00 m
Surface Hole Latitude: 55.740872
Surface Hole Longitude: -119.606901

For data sources see[1][2]

Well History

Date Event
2018-12-10 Obtained License
2019-03-22 Surface Casing Operation Performed
2019-03-23 Direction Drilling Operation Performed - Deviate
2019-03-26 Direction Drilling Operation Performed - Horizontal
2019-04-02 Finished Drilling
2019-04-02 Production Casing Operation Performed
2019-04-02 Well Log Performed
2019-04-02 Well Mode changed to Drilled and Cased
2019-04-03 Rig Released
2019-05-10 Perforation Treatment Performed - Jet Perforation
2019-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-11 Perforation Treatment Performed - Jet Perforation
2019-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-12 Perforation Treatment Performed - Jet Perforation
2019-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-13 Perforation Treatment Performed - Jet Perforation
2019-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-14 Perforation Treatment Performed - Jet Perforation
2019-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-15 Perforation Treatment Performed - Jet Perforation
2019-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-16 Perforation Treatment Performed - Jet Perforation
2019-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-17 Perforation Treatment Performed - Jet Perforation
2019-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-18 Perforation Treatment Performed - Jet Perforation
2019-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-30 Well Log Performed
2019-06-06 Well Fluid changed to Crude Oil
2019-06-06 Well Mode changed to Drilling and Completing
2019-07-10 Well Began Production
2019-07-10 Well Fluid changed to Crude Oil
2019-07-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-03-21 Trinidad Drilling Ltd. 60 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-23 1066.80 Deviate (5 - 79 degrees)
2019-03-26 2276.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-10 Perforation 4449.90 4450.20 3
2019-05-10 Multi-Stage Fracture 4274.90 4350.20 0
2019-05-17 Multi-Stage Fracture 2474.90 2550.20 0
2019-05-17 Perforation 2449.90 2450.20 3
2019-05-17 Perforation 2424.90 2425.20 3
2019-05-17 Perforation 2399.90 2400.20 3
2019-05-17 Perforation 2374.90 2375.20 3
2019-05-17 Multi-Stage Fracture 2374.90 2450.20 0
2019-05-18 Perforation 2349.90 2350.20 3
2019-05-18 Perforation 2324.90 2325.20 3
2019-05-18 Perforation 2299.90 2300.20 3
2019-05-18 Perforation 2274.90 2275.20 3
2019-05-11 Perforation 4249.90 4250.20 3
2019-05-18 Multi-Stage Fracture 2274.90 2350.20 0
2019-05-11 Perforation 4224.90 4225.20 3
2019-05-11 Perforation 4199.90 4200.20 3
2019-05-11 Perforation 4174.90 4175.20 3
2019-05-11 Multi-Stage Fracture 4174.90 4250.20 0
2019-05-11 Perforation 4149.90 4150.20 3
2019-05-11 Perforation 4124.90 4125.20 3
2019-05-11 Perforation 4099.90 4100.20 3
2019-05-11 Perforation 4074.90 4075.20 3
2019-05-10 Perforation 4424.90 4425.20 3
2019-05-11 Multi-Stage Fracture 4074.90 4150.20 0
2019-05-11 Perforation 4049.90 4050.20 3
2019-05-11 Perforation 4024.90 4025.20 3
2019-05-11 Perforation 3999.90 4000.20 3
2019-05-11 Perforation 3974.90 3975.20 3
2019-05-12 Multi-Stage Fracture 3974.90 4050.20 0
2019-05-12 Perforation 3949.90 3950.20 3
2019-05-12 Perforation 3924.90 3925.20 3
2019-05-12 Perforation 3899.90 3900.20 3
2019-05-12 Perforation 3874.90 3875.20 3
2019-05-10 Perforation 4399.90 4400.20 3
2019-05-12 Multi-Stage Fracture 3874.90 3950.20 0
2019-05-12 Perforation 3849.90 3850.20 3
2019-05-12 Perforation 3824.90 3825.20 3
2019-05-12 Perforation 3799.90 3800.20 3
2019-05-12 Perforation 3774.90 3775.20 3
2019-05-12 Multi-Stage Fracture 3774.90 3850.20 0
2019-05-12 Perforation 3749.90 3750.20 3
2019-05-12 Perforation 3724.90 3725.20 3
2019-05-12 Perforation 3699.90 3700.20 3
2019-05-12 Perforation 3674.90 3675.20 3
2019-05-10 Perforation 4374.90 4375.20 3
2019-05-13 Multi-Stage Fracture 3674.90 3750.20 0
2019-05-13 Perforation 3649.90 3650.20 3
2019-05-13 Perforation 3624.90 3625.20 3
2019-05-13 Perforation 3599.90 3600.20 3
2019-05-13 Perforation 3574.90 3575.20 3
2019-05-13 Multi-Stage Fracture 3574.90 3650.20 0
2019-05-13 Perforation 3549.90 3550.20 3
2019-05-13 Perforation 3524.90 3525.20 3
2019-05-13 Perforation 3499.90 3500.20 3
2019-05-13 Perforation 3474.90 3475.20 3
2019-05-10 Multi-Stage Fracture 4374.90 4450.20 0
2019-05-13 Multi-Stage Fracture 3474.90 3550.20 0
2019-05-13 Perforation 3449.90 3450.20 3
2019-05-13 Perforation 3424.90 3425.20 3
2019-05-13 Perforation 3399.90 3400.20 3
2019-05-13 Perforation 3374.90 3375.20 3
2019-05-14 Multi-Stage Fracture 3374.90 3450.20 0
2019-05-14 Perforation 3349.90 3350.20 3
2019-05-14 Perforation 3324.90 3325.20 3
2019-05-14 Perforation 3299.90 3300.20 3
2019-05-14 Perforation 3274.90 3275.20 3
2019-05-10 Perforation 4349.90 4350.20 3
2019-05-14 Multi-Stage Fracture 3274.90 3350.20 0
2019-05-14 Perforation 3249.90 3250.20 3
2019-05-14 Perforation 3224.90 3225.20 3
2019-05-14 Perforation 3199.90 3200.20 3
2019-05-14 Perforation 3174.90 3175.20 3
2019-05-14 Multi-Stage Fracture 3174.90 3250.20 0
2019-05-15 Perforation 3149.90 3150.20 3
2019-05-15 Perforation 3124.90 3125.20 3
2019-05-15 Perforation 3099.90 3100.20 3
2019-05-15 Perforation 3074.90 3075.20 3
2019-05-10 Perforation 4323.90 4324.20 3
2019-05-15 Multi-Stage Fracture 3074.90 3150.20 0
2019-05-15 Perforation 3049.90 3050.20 3
2019-05-15 Perforation 3024.90 3025.20 3
2019-05-15 Perforation 2999.90 3000.20 3
2019-05-15 Perforation 2974.90 2975.20 3
2019-05-15 Multi-Stage Fracture 2974.90 3050.20 0
2019-05-15 Perforation 2949.90 2950.20 3
2019-05-15 Perforation 2924.90 2950.20 3
2019-05-15 Perforation 2899.90 2900.20 3
2019-05-15 Perforation 2874.90 2875.20 3
2019-05-10 Perforation 4299.90 4300.20 3
2019-05-16 Multi-Stage Fracture 2874.90 2950.20 0
2019-05-16 Perforation 2849.90 2850.20 3
2019-05-16 Perforation 2824.90 2825.20 3
2019-05-16 Perforation 2799.90 2800.20 3
2019-05-16 Perforation 2774.90 2775.20 3
2019-05-16 Multi-Stage Fracture 2774.90 2850.20 0
2019-05-16 Perforation 2749.90 2750.20 3
2019-05-16 Perforation 2724.90 2725.20 3
2019-05-16 Perforation 2699.90 2700.20 3
2019-05-16 Perforation 2674.90 2675.20 3
2019-05-10 Perforation 4274.90 4275.20 3
2019-05-16 Multi-Stage Fracture 2674.90 2750.20 0
2019-05-16 Perforation 2649.90 2650.20 3
2019-05-16 Perforation 2624.90 2625.20 3
2019-05-16 Perforation 2599.90 2600.20 3
2019-05-16 Perforation 2574.90 2575.20 3
2019-05-17 Multi-Stage Fracture 2574.90 2650.20 0
2019-05-17 Perforation 2549.90 2550.20 3
2019-05-17 Perforation 2524.90 2525.20 3
2019-05-17 Perforation 2499.90 2500.20 3
2019-05-17 Perforation 2474.90 2475.20 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-10 2019-05-18 2,157 14,988 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.1523 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 18.265 N/A
Enviro-Syn HCR Fluid Energy Group Ltd. Acid Non-Hazardous Ingredients Trade Secret 100 0.5436 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0103 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0103 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0103 N/A
Polyethylene glycol 25322-68-3 100 0.0103 N/A
Sodium bromide 7647-15-6 100 0.0103 N/A
CalVisc?. High Viscosity Friction Reducer Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0041 N/A
DynaRate 6202D. Friction Reducer Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0243 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4176 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-03 No Incident Encountered 0.00 0.00
2019-06-03 No Incident Encountered 0.00 0.00

For data sources see[9]

References