X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110102020

Well Details

Well ID: 0786110102020
Loading map...
Location: 02/02-01-078-11W6/0
Location Alias: 02/02-01-78-11 W6M
Location Alias 2: 02/02-01-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 01
County/Municipality: Saddle Hills County
Well Name: CNRL 102 PCOUPES 2-1-78-11
Operator Name: Canadian Natural Resources Limited
License Number: 0408286
License Date: 2009-01-21
License Status: Issued
Spud Date: 2009-02-24
Final Drill Date: 2009-03-12
Well Total Depth: 3590.00 m
Surface Hole Latitude: 55.738621
Surface Hole Longitude: -119.573840

For data sources see[1][2]

Well History

Date Event
2009-01-21 Obtained License
2009-02-25 Surface Casing Operation Performed
2009-02-28 Direction Drilling Operation Performed - Horizontal
2009-03-06 Well Log Performed
2009-03-11 Production Casing Operation Performed
2009-03-12 Finished Drilling
2009-03-12 Well Log Performed
2009-03-12 Well Mode changed to Drilled and Cased
2009-03-13 Rig Released
2009-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2009-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2010-01-07 Well Began Production
2010-01-07 Well Fluid changed to Gas
2010-01-07 Well Mode changed to Flowing
2018-01-01 Well Fluid changed to Gas
2018-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-02-28 1758.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-08-14 Multi-Stage Fracture 3338.70 3338.80 0
2009-08-14 Multi-Stage Fracture 3174.90 3175.00 0
2009-08-14 Multi-Stage Fracture 2996.90 2997.00 0
2009-08-14 Multi-Stage Fracture 2837.70 2837.80 0
2009-08-15 Multi-Stage Fracture 2664.30 2664.40 0
2009-08-15 Multi-Stage Fracture 2490.20 2490.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 8362 0.0 0.0 0.0
2011 8641 0.0 0.0 0.0
2012 8235 0.0 0.0 0.0
2013 8688 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8327 0.0 0.0 0.0
2016 7296 0.0 0.0 0.0
2017 6373 0.0 0.0 0.0
2018 8342 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-08-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References