If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786102314002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.778095,"lon":-119.437167,"icon":""}]} |
Location: 00/14-23-078-10W6/2 | |
Location Alias: 00/14-23-78-10 W6M | |
Location Alias 2: 00/14-23-078-10 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 10 | |
Section: 23 | |
County/Municipality: Saddle Hills County | |
Well Name: SEC PROGRESS 14-23-78-10 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0129678 | |
License Date: 1987-10-27 | |
License Status: Amended | |
Spud Date: 1987-10-31 | |
Final Drill Date: 1987-11-23 | |
Well Total Depth: 2415.00 m | |
Surface Hole Latitude: 55.778095 | |
Surface Hole Longitude: -119.437167 |
Date | Event |
---|---|
1987-10-27 | Obtained License |
1987-11-01 | Surface Casing Operation Performed |
1987-11-03 | Lost Circulation Occurred |
1987-11-11 | Drill Stem Test Performed |
1987-11-23 | Finished Drilling |
1987-11-23 | Well Mode changed to Drilled and Cased |
1987-11-24 | Well Log Performed |
1987-11-25 | Well Log Performed |
1987-11-27 | Drill Stem Test Performed |
1987-11-29 | Production Casing Operation Performed |
1987-11-30 | Rig Released |
1987-12-09 | Well Log Performed |
1987-12-15 | Perforation Treatment Performed - Jet Perforation |
1987-12-15 | Well Log Performed |
1987-12-16 | Perforation Treatment Performed - Remedial Casing |
1988-02-02 | Well Log Performed |
1988-02-03 | Well Log Performed |
1988-02-04 | Perforation Treatment Performed - Jet Perforation |
1988-02-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-02-06 | Well Log Performed |
1988-02-08 | Perforation Treatment Performed - Jet Perforation |
1988-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-02-11 | Perforation Treatment Performed - Cement Squeeze |
1988-02-13 | Well Log Performed |
1988-02-16 | Perforation Treatment Performed - Fractured |
1988-02-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-02-19 | Plug Back Performed |
1988-02-19 | Well Log Performed |
1988-02-20 | Perforation Treatment Performed - Jet Perforation |
1988-02-21 | Well Log Performed |
1988-02-22 | Perforation Treatment Performed - Jet Perforation |
1996-11-24 | Perforation Treatment Performed - Jet Perforation |
1996-11-24 | Well Log Performed |
1996-11-26 | Well Log Performed |
1996-11-27 | Perforation Treatment Performed - Fractured |
1996-12-07 | Well Began Production |
1996-12-07 | Well Fluid changed to Gas |
1996-12-07 | Well Mode changed to Flowing |
2005-09-16 | Well Fluid changed to Gas |
2005-09-16 | Well Mode changed to Flowing |
2012-06-14 | Well Fluid changed to Gas |
2012-06-14 | Well Mode changed to Suspended |
2013-06-13 | Well Fluid changed to Gas |
2013-06-13 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-12-15 | Perforation | 1210.00 | 1211.00 | 13 |
1988-02-20 | Perforation | 1760.30 | 1761.50 | 14 |
1988-02-22 | Perforation | 1758.00 | 1760.30 | 13 |
1996-11-24 | Perforation | 1823.50 | 1827.00 | 14 |
1996-11-27 | Fracture | 1823.50 | 1827.00 | 0 |
1987-12-16 | Remedial Casing Cementing | 1210.00 | 1211.00 | 0 |
1988-02-04 | Perforation | 2320.40 | 2326.20 | 13 |
1988-02-05 | Acid Treatment | 2320.40 | 2326.20 | 0 |
1988-02-08 | Perforation | 2282.50 | 2286.70 | 14 |
1988-02-09 | Acid Treatment | 2282.50 | 2286.70 | 0 |
1988-02-11 | Cement Squeeze | 2282.50 | 2286.70 | 0 |
1988-02-16 | Fracture | 2320.40 | 2326.20 | 0 |
1988-02-19 | Packing Device Capped w/Cement | 2275.00 | 2300.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 434 | 0.0 | 0.0 | 0.0 |
1997 | 8216 | 0.0 | 0.0 | 0.0 |
1998 | 8527 | 0.0 | 0.0 | 0.0 |
1999 | 8670 | 0.0 | 0.0 | 0.0 |
2000 | 8592 | 0.0 | 0.0 | 0.0 |
2001 | 8442 | 0.0 | 0.0 | 0.0 |
2002 | 8755 | 0.0 | 0.0 | 0.0 |
2003 | 8723 | 0.0 | 0.0 | 0.0 |
2004 | 8562 | 0.0 | 0.0 | 0.0 |
2005 | 7873 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 7487 | 0.0 | 0.0 | 0.0 |
2011 | 1362 | 0.0 | 0.0 | 0.0 |
2013 | 5136 | 0.0 | 0.0 | 0.0 |
2014 | 8429 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8591 | 0.0 | 0.0 | 0.0 |
2019 | 8447 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1987-11-03 | Lost Circulation | 1008.00 | 1092.00 |
For data sources see[6]