X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786101011002

Well Details

Well ID: 0786101011002
Loading map...
Location: 00/11-10-078-10W6/2
Location Alias: 00/11-10-78-10 W6M
Location Alias 2: 00/11-10-078-10 W6/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 10
Section: 10
County/Municipality: Saddle Hills County
Well Name: CNRL PROGRESS 11-10-78-10
Operator Name: Canadian Natural Resources Limited
License Number: 0090910
License Date: 1981-06-24
License Status: Suspension
Spud Date: 1981-07-02
Final Drill Date: 1981-07-20
Well Total Depth: 1919.70 m
Surface Hole Latitude: 55.747715
Surface Hole Longitude: -119.465155

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-24 Obtained License
1981-07-20 Finished Drilling
1981-07-20 Well Log Performed
1981-07-20 Well Mode changed to Drilled and Cased
1981-07-22 Drill Stem Test Performed
1981-07-23 Drill Stem Test Performed
1981-07-25 Production Casing Operation Performed
1981-08-27 Perforation Treatment Performed - Jet Perforation
1981-08-30 Perforation Treatment Performed - Fractured
1981-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-16 Perforation Treatment Performed - Jet Perforation
2002-03-12 Perforation Treatment Performed - Cement Squeeze
2002-03-12 Plug Back Performed
2002-03-14 Perforation Treatment Performed - Jet Perforation
2002-04-16 Well Began Production
2002-04-16 Well Fluid changed to Gas
2002-04-16 Well Mode changed to Flowing
2005-01-01 Well Fluid changed to Gas
2005-01-01 Well Mode changed to Pumping
2011-09-30 Well Fluid changed to Gas
2011-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-08-27 Perforation 1877.00 1881.00 13
1981-08-30 Fracture 1877.00 1881.00 0
1981-09-16 Packing Device Capped w/Cement 1849.00 1862.00 0
1981-09-16 Perforation 1813.50 1814.50 13
2002-03-12 Cement Squeeze 1813.50 1814.50 0
2002-03-14 Perforation 1877.00 1881.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 3232 0.0 0.0 0.0
2005 7381 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8663 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 2208 0.0 0.0 0.0
2010 4200 0.0 0.0 0.0

For data sources see[5]

References