X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786093314000

Well Details

Well ID: 0786093314000
Loading map...
Location: 00/14-33-078-09W6/0
Location Alias: 00/14-33-78-09 W6M
Location Alias 2: 00/14-33-078-09 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 09
Section: 33
County/Municipality: Saddle Hills County
Well Name: Canlin PROGRESS 14-33-78-9
Operator Name: Canlin Energy Corporation
License Number: 0136044
License Date: 1988-08-31
License Status: Suspension
Spud Date: 1988-09-07
Final Drill Date: 1988-09-18
Well Total Depth: 1775.00 m
Surface Hole Latitude: 55.807458
Surface Hole Longitude: -119.337622

For data sources see[1][2]

Well History

Date Event
1988-08-31 Obtained License
1988-09-07 Surface Casing Operation Performed
1988-09-18 Finished Drilling
1988-09-18 Well Mode changed to Drilled and Cased
1988-09-19 Well Log Performed
1988-09-20 Production Casing Operation Performed
1988-09-20 Rig Released
1988-09-27 Perforation Treatment Performed - Jet Perforation
1988-09-27 Well Log Performed
1988-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-04 Perforation Treatment Performed - Fractured
1988-10-13 Well Began Production
1988-10-13 Well Fluid changed to Crude Oil
1988-10-13 Well Mode changed to Flowing
1989-04-30 Well Fluid changed to Crude Oil
1989-04-30 Well Mode changed to Suspended
1991-12-13 Well Fluid changed to Crude Oil
1991-12-13 Well Mode changed to Pumping
2004-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-08 Plug Back Performed
2004-01-08 Well Fluid changed to Crude Oil
2004-01-08 Well Log Performed
2004-01-08 Well Mode changed to Abandoned Zone
2004-01-09 Perforation Treatment Performed - Jet Perforation
2004-01-09 Well Log Performed
2004-01-10 Perforation Treatment Performed - Fractured
2004-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-15 Plug Back Performed
2004-01-15 Well Log Performed
2006-09-10 Perforation Treatment Performed - Jet Perforation
2006-09-11 Well Log Performed
2006-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-09-12 Perforation Treatment Performed - Cement Squeeze
2006-09-18 Perforation Treatment Performed - Jet Perforation
2006-09-20 Perforation Treatment Performed - Cement Squeeze
2006-10-17 Perforation Treatment Performed - Jet Perforation
2006-10-17 Well Log Performed
2006-10-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-27 Perforation 1683.50 1685.70 13
2006-09-12 Cement Squeeze 1683.50 1685.70 0
2006-09-18 Perforation 1318.50 1319.50 20
2006-09-20 Cement Squeeze 1318.50 1319.50 0
2006-10-17 Perforation 1757.00 1760.00 20
2006-10-23 Fracture 1757.00 1760.00 0
1988-09-29 Acid Treatment 1683.50 1685.70 0
1988-10-04 Fracture 1683.50 1685.70 0
2004-01-08 Packing Device Capped w/Cement 1667.00 1675.00 0
2004-01-09 Perforation 1318.50 1319.50 20
2004-01-10 Fracture 1318.50 1319.50 0
2004-01-15 Packing Device Capped w/Cement 1302.00 1310.00 0
2006-09-10 Perforation 1683.50 1685.70 16
2006-09-12 Acid Treatment 1683.50 1685.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1352 0.0 0.0 0.0
1989 115 0.0 0.0 0.0
1991 96 0.0 0.0 0.0
1992 2221 0.0 0.0 0.0
1993 5831 0.0 0.0 0.0
1994 8214 0.0 0.0 0.0
1995 8708 0.0 0.0 0.0
1996 8330 0.0 0.0 0.0
1997 6632 0.0 0.0 0.0
1998 8461 0.0 0.0 0.0
1999 8598 0.0 0.0 0.0
2000 8406 0.0 0.0 0.0
2001 8088 0.0 0.0 0.0
2002 8415 0.0 0.0 0.0
2003 5659 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References