X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786093006002

Well Details

Well ID: 0786093006002
Loading map...
Location: 00/06-30-078-09W6/2
Location Alias: 00/06-30-78-09 W6M
Location Alias 2: 00/06-30-078-09 W6/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 09
Section: 30
County/Municipality: Saddle Hills County
Well Name: BIR PROGRESS 6-30-78-9
Operator Name: Birchcliff Energy Ltd.
License Number: 0106086
License Date: 1984-02-21
License Status: Suspension
Spud Date: 1984-02-28
Final Drill Date: 1984-03-13
Well Total Depth: 1820.00 m
Surface Hole Latitude: 55.785457
Surface Hole Longitude: -119.389328

For data sources see[1][2]

Well History

Date Event
1984-02-21 Obtained License
1984-03-13 Finished Drilling
1984-03-13 Well Log Performed
1984-03-13 Well Mode changed to Drilled and Cased
1984-03-14 Drill Stem Test Performed
1984-03-14 Well Log Performed
1984-03-15 Drill Stem Test Performed
1984-03-16 Drill Stem Test Performed
1984-03-17 Drill Stem Test Performed
1984-03-18 Production Casing Operation Performed
1984-03-24 Well Log Performed
1984-03-26 Well Log Performed
1984-03-27 Perforation Treatment Performed - Jet Perforation
1984-03-28 Perforation Treatment Performed - Fractured
1984-10-01 Well Began Production
1984-10-01 Well Fluid changed to Crude Oil
1984-10-01 Well Log Performed
1984-10-01 Well Mode changed to Flowing
1984-10-03 Perforation Treatment Performed - Jet Perforation
1985-10-09 Well Log Performed
1986-07-12 Well Log Performed
1986-07-13 Perforation Treatment Performed - Jet Perforation
1986-07-13 Well Fluid changed to Crude Oil
1986-07-13 Well Mode changed to Flowing
1986-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-03 Well Structure changed to Commingled
2019-12-19 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2019-12-19 Plug Back Performed
2019-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-20 Plug Back Performed
2019-12-20 Well Log Performed
2019-12-20 Well Mode changed to Abandoned Zone
2019-12-20 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-03-27 Perforation 1741.50 1746.00 13
2019-12-20 Packing Device Capped w/Cement 1652.00 1660.00 0
1984-03-28 Fracture 1741.50 1746.00 0
1984-10-03 Perforation 1729.00 1733.00 13
1986-07-13 Perforation 1734.40 1735.20 13
1986-07-13 Perforation 1666.00 1669.00 13
1986-07-14 Acid Treatment 1729.00 1735.20 0
1986-07-16 Acid Treatment 1666.00 1669.00 0
2019-12-19 Packing Dev Cpd w/Res-Gyp Cem 1735.50 1738.50 0
2019-12-20 Packing Device Capped w/Cement 1715.00 1723.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2039 0.0 0.0 0.0
1985 8432 0.0 0.0 0.0
1986 4544 0.0 0.0 0.0
1987 5104 0.0 0.0 0.0
1988 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References