X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786091414000

Well Details

Well ID: 0786091414000
Loading map...
Location: 00/14-14-078-09W6/0
Location Alias: 00/14-14-78-09 W6M
Location Alias 2: 00/14-14-078-09 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 09
Section: 14
County/Municipality: Saddle Hills County
Well Name: KELT EXP HZ PROGRESS 14-14-78-9
Operator Name: Kelt Exploration Ltd.
License Number: 0477426
License Date: 2015-11-02
License Status: Issued
Spud Date: 2016-01-05
Final Drill Date: 2016-01-22
Well Total Depth: 5470.00 m
Surface Hole Latitude: 55.733694
Surface Hole Longitude: -119.281689

For data sources see[1][2]

Well History

Date Event
2015-11-02 Obtained License
2016-01-06 Surface Casing Operation Performed
2016-01-09 Direction Drilling Operation Performed - Deviate
2016-01-13 Direction Drilling Operation Performed - Horizontal
2016-01-22 Finished Drilling
2016-01-22 Well Log Performed
2016-01-22 Well Mode changed to Drilled and Cased
2016-01-24 Liner Casing Operation Performed
2016-01-24 Production Casing Operation Performed
2016-01-24 Rig Released
2016-01-26 Perforation Treatment Performed - Open-Hole Completion
2016-07-01 Well Log Performed
2016-07-03 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-04 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-05 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-17 Well Began Production
2016-08-17 Well Fluid changed to Crude Oil
2016-08-17 Well Mode changed to Flowing
2017-05-29 Well Fluid changed to Crude Oil
2017-05-29 Well Mode changed to Gas Lift

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-05 Horizon Drilling Inc. 45 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-09 1608.50 Deviate (5 - 79 degrees)
2016-01-13 2153.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-01-26 Open Hole/Barefoot Completion 5300.80 5470.00 0
2016-07-04 Multi-Stage Fracture 4895.30 4896.10 0
2016-07-04 Multi-Stage Fracture 4825.40 4826.20 0
2016-07-04 Multi-Stage Fracture 4755.50 4756.30 0
2016-07-04 Multi-Stage Fracture 4685.40 4686.20 0
2016-07-04 Multi-Stage Fracture 4615.30 4616.10 0
2016-07-04 Multi-Stage Fracture 4539.70 4540.50 0
2016-07-04 Multi-Stage Fracture 4472.40 4473.20 0
2016-07-04 Multi-Stage Fracture 4403.10 4403.90 0
2016-07-04 Multi-Stage Fracture 4333.90 4334.70 0
2016-07-04 Multi-Stage Fracture 4264.80 4265.60 0
2016-07-03 Multi-Stage Fracture 5442.30 5443.60 0
2016-07-04 Multi-Stage Fracture 4196.20 4197.00 0
2016-07-04 Multi-Stage Fracture 4126.90 4127.70 0
2016-07-04 Multi-Stage Fracture 4058.10 4058.90 0
2016-07-04 Multi-Stage Fracture 3988.60 3989.40 0
2016-07-04 Multi-Stage Fracture 3919.90 3920.70 0
2016-07-04 Multi-Stage Fracture 3850.80 3851.60 0
2016-07-04 Multi-Stage Fracture 3781.60 3782.40 0
2016-07-04 Multi-Stage Fracture 3712.70 3713.50 0
2016-07-04 Multi-Stage Fracture 3630.50 3631.50 0
2016-07-05 Multi-Stage Fracture 3567.20 3568.00 0
2016-07-03 Multi-Stage Fracture 5387.00 5387.80 0
2016-07-05 Multi-Stage Fracture 3492.50 3493.30 0
2016-07-05 Multi-Stage Fracture 3421.80 3422.60 0
2016-07-05 Multi-Stage Fracture 3362.50 3363.30 0
2016-07-05 Multi-Stage Fracture 3291.80 3292.60 0
2016-07-05 Multi-Stage Fracture 3221.00 3221.80 0
2016-07-05 Multi-Stage Fracture 3150.40 3151.20 0
2016-07-05 Multi-Stage Fracture 3079.70 3080.50 0
2016-07-05 Multi-Stage Fracture 3009.20 3010.00 0
2016-07-05 Multi-Stage Fracture 2938.40 2939.20 0
2016-07-05 Multi-Stage Fracture 2868.00 2868.80 0
2016-07-03 Multi-Stage Fracture 5316.40 5317.20 0
2016-07-05 Multi-Stage Fracture 2795.00 2795.80 0
2016-07-05 Multi-Stage Fracture 2736.80 2737.60 0
2016-07-05 Multi-Stage Fracture 2665.20 2666.00 0
2016-07-05 Multi-Stage Fracture 2606.20 2607.00 0
2016-07-05 Multi-Stage Fracture 2535.20 2536.00 0
2016-07-05 Multi-Stage Fracture 2476.20 2477.00 0
2016-07-05 Multi-Stage Fracture 2404.70 2405.50 0
2016-07-05 Multi-Stage Fracture 2346.20 2347.10 0
2016-07-03 Multi-Stage Fracture 5246.10 5246.90 0
2016-07-03 Multi-Stage Fracture 5175.90 5176.70 0
2016-07-04 Multi-Stage Fracture 5105.90 5106.70 0
2016-07-04 Multi-Stage Fracture 5035.60 5036.40 0
2016-07-04 Multi-Stage Fracture 4965.30 4966.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-03 2016-07-05 1,987 13,990 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.3915 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 2.4539 N/A
silica crystalline 14808-60-7 100 2.4539 N/A
Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 4.2938 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 8.676 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0215 N/A
dibromoacetonitrile 3252-43-5 100 0.0215 N/A
non-hazardous ingredients Not Available 100 0.0215 N/A
polyethylene glycol 25322-68-3 100 0.0215 N/A
sodium bromide 7647-15-6 100 0.0215 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0912 N/A
water Not Available 100 0.0912 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0042 N/A
GFR-3D Trican Friction Reducer non-hazardous ingredients Not Available 100 0.0268 N/A
sodium chloride 7647-14-5 100 0.0268 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0407 N/A
methanol 67-56-1 100 0.0407 N/A
water Not Available 100 0.0407 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-07-03 2016-07-06 Surface Water - Runoff 5986
2016-07-03 2016-07-06 Surface Water - Runoff 7980

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2187 0.0 0.0 0.0
2017 6279 0.0 0.0 0.0
2018 7361 0.0 0.0 0.0
2019 7089 0.0 0.0 0.0
2020 494 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-26 No Incident Encountered 0.00 0.00
2016-07-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References