X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786090916000

Well Details

Well ID: 0786090916000
Loading map...
Location: 00/16-09-078-09W6/0
Location Alias: 00/16-09-78-09 W6M
Location Alias 2: 00/16-09-078-09 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 09
Section: 09
County/Municipality: Saddle Hills County
Well Name: KELT EXP HZ PROGRESS 16-9-78-9
Operator Name: Kelt Exploration Ltd.
License Number: 0486538
License Date: 2017-11-27
License Status: Issued
Spud Date: 2017-12-10
Final Drill Date: 2017-12-19
Well Total Depth: 5003.00 m
Surface Hole Latitude: 55.723553
Surface Hole Longitude: -119.319953

For data sources see[1][2]

Well History

Date Event
2017-11-27 Obtained License
2017-12-10 Lost Circulation Occurred
2017-12-10 Surface Casing Operation Performed
2017-12-13 Direction Drilling Operation Performed - Deviate
2017-12-15 Direction Drilling Operation Performed - Horizontal
2017-12-17 Production Casing Operation Performed
2017-12-19 Finished Drilling
2017-12-19 Well Log Performed
2017-12-19 Well Mode changed to Drilled and Cased
2017-12-22 Perforation Treatment Performed - Open-Hole Completion
2017-12-22 Production Casing Operation Performed
2017-12-22 Rig Released
2018-01-17 Well Log Performed
2018-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-14 Well Began Production
2018-02-14 Well Fluid changed to Crude Oil
2018-02-14 Well Mode changed to Flowing
2018-11-01 Well Fluid changed to Crude Oil
2018-11-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-10 Horizon Drilling Inc. 45 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-13 1790.40 Deviate (5 - 79 degrees)
2017-12-15 2222.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-22 Open Hole/Barefoot Completion 4991.50 5003.00 0
2018-01-27 Multi-Stage Fracture 4540.10 4540.20 0
2018-01-27 Multi-Stage Fracture 4484.20 4484.30 0
2018-01-27 Multi-Stage Fracture 4428.40 4428.50 0
2018-01-27 Multi-Stage Fracture 4372.80 4372.90 0
2018-01-27 Multi-Stage Fracture 4316.70 4316.80 0
2018-01-27 Multi-Stage Fracture 4260.60 4260.70 0
2018-01-27 Multi-Stage Fracture 4204.50 4204.60 0
2018-01-27 Multi-Stage Fracture 4148.40 4148.50 0
2018-01-27 Multi-Stage Fracture 4092.50 4092.60 0
2018-01-27 Multi-Stage Fracture 4022.60 4022.70 0
2018-01-26 Multi-Stage Fracture 4966.70 4966.80 0
2018-01-27 Multi-Stage Fracture 3966.40 3966.50 0
2018-01-27 Multi-Stage Fracture 3910.70 3910.80 0
2018-01-28 Multi-Stage Fracture 3856.10 3856.20 0
2018-01-28 Multi-Stage Fracture 3800.50 3800.60 0
2018-01-28 Multi-Stage Fracture 3744.80 3744.90 0
2018-01-29 Multi-Stage Fracture 3688.20 3688.30 0
2018-01-29 Multi-Stage Fracture 3621.20 3621.30 0
2018-01-29 Multi-Stage Fracture 3567.10 3567.20 0
2018-01-29 Multi-Stage Fracture 3512.20 3512.30 0
2018-01-29 Multi-Stage Fracture 3455.90 3456.00 0
2018-01-26 Multi-Stage Fracture 4932.20 4932.30 0
2018-01-29 Multi-Stage Fracture 3399.50 3399.60 0
2018-01-29 Multi-Stage Fracture 3343.00 3343.10 0
2018-01-29 Multi-Stage Fracture 3286.60 3286.70 0
2018-01-29 Multi-Stage Fracture 3231.90 3232.00 0
2018-01-29 Multi-Stage Fracture 3175.50 3175.60 0
2018-01-29 Multi-Stage Fracture 3119.10 3119.20 0
2018-01-29 Multi-Stage Fracture 3062.70 3062.80 0
2018-01-29 Multi-Stage Fracture 3006.20 3006.30 0
2018-01-29 Multi-Stage Fracture 2949.80 2949.90 0
2018-01-30 Multi-Stage Fracture 2893.50 2893.60 0
2018-01-26 Multi-Stage Fracture 4876.60 4876.70 0
2018-01-30 Multi-Stage Fracture 2835.80 2835.90 0
2018-01-30 Multi-Stage Fracture 2777.70 2777.80 0
2018-01-30 Multi-Stage Fracture 2719.70 2719.80 0
2018-01-30 Multi-Stage Fracture 2661.80 2661.90 0
2018-01-30 Multi-Stage Fracture 2603.80 2603.90 0
2018-01-30 Multi-Stage Fracture 2545.50 2545.60 0
2018-01-30 Multi-Stage Fracture 2487.50 2487.60 0
2018-01-30 Multi-Stage Fracture 2429.30 2429.40 0
2018-01-30 Multi-Stage Fracture 2371.20 2371.30 0
2018-01-30 Multi-Stage Fracture 2313.00 2313.10 0
2018-01-26 Multi-Stage Fracture 4820.90 4821.00 0
2018-01-30 Multi-Stage Fracture 2255.10 2255.20 0
2018-01-30 Multi-Stage Fracture 2222.20 2222.30 0
2018-01-26 Multi-Stage Fracture 4764.70 4764.80 0
2018-01-26 Multi-Stage Fracture 4708.40 4708.50 0
2018-01-26 Multi-Stage Fracture 4652.10 4652.20 0
2018-01-26 Multi-Stage Fracture 4596.10 4596.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-26 2018-01-30 2,081 20,353 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.7244 N/A
Prime Plus (30/50) Trican Well Service Quartz (SiO2) 14808-60-7 100 1.0621 N/A
Sand - Tier 1 (30/50) Trican Well Service Aluminum Oxide 1344-28-1 100 9.438 N/A
Crystalline silica. quartz 14808-60-7 100 9.438 N/A
Iron Oxide 1309-37-1 100 9.438 N/A
Titanium Oxide 13463-67-7 100 9.4379 N/A
Sand - Tier 2 (40/70) Trican Well Service Aluminum Oxide 1344-28-1 100 3.5806 N/A
Crystalline silica. quartz 14808-60-7 100 3.5806 N/A
Iron Oxide 1309-37-1 100 3.5806 N/A
Titanium Oxide 13463-67-7 100 3.5805 N/A
AQUCAR DB20 Biocide Trican Well Service Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0105 N/A
2-mercaptoethanol 60-24-2 100 0.0105 N/A
dibromoacetonitrile 3252-43-5 100 0.0105 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
sodium bromide 7647-15-6 100 0.0105 N/A
CC-7 (Clay Stabilizer) Trican Well Service Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0554 N/A
water Not Available 100 0.0554 N/A
FR-23 Friction Reducer Trican Well Service Gelling Agent No hazardous ingredients Not Available 100 0.061 N/A
SI-18 (Scale Inhibitor) Trican Well Service Scale Inhibitor non-hazardous ingredients Not Available 100 0.0255 N/A
S-17X (Surfactant) Trican Well Service Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0422 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0422 N/A
methanol 67-56-1 100 0.0422 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0422 N/A
non-hazardous ingredients Not Available 100 0.0422 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-23 2018-01-30 Surface Water - Runoff 2078
2018-01-23 2018-01-30 Surface Water - Runoff 18749

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 915 0.0 0.0 0.0
2019 7496 0.0 0.0 0.0
2020 2061 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-10 Lost Circulation 50.00 50.00
2018-02-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References