X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786090815000

Well Details

Well ID: 0786090815000
Loading map...
Location: 00/15-08-078-09W6/0
Location Alias: 00/15-08-78-09 W6M
Location Alias 2: 00/15-08-078-09 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 09
Section: 08
County/Municipality: Saddle Hills County
Well Name: ZARGON PROGRESS 15-8-78-9
Operator Name: Canadian Natural Resources Limited
License Number: 0080381
License Date: 1980-01-11
License Status: Suspension
Spud Date: 1980-01-17
Final Drill Date: 1980-02-14
Well Total Depth: 2400.00 m
Surface Hole Latitude: 55.750250
Surface Hole Longitude: -119.357268

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-11 Obtained License
1980-02-14 Finished Drilling
1980-02-15 Drill Stem Test Performed
1980-02-16 Well Log Performed
1980-02-17 Drill Stem Test Performed
1980-02-19 Drill Stem Test Performed
1980-02-20 Drill Stem Test Performed
1980-02-21 Drill Stem Test Performed
1980-02-22 Drill Stem Test Performed
1980-02-24 Production Casing Operation Performed
1980-02-24 Well Mode changed to Drilled and Cased
1981-02-11 Perforation Treatment Performed - Jet Perforation
1981-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-26 Plug Back Performed
2011-11-28 Perforation Treatment Performed - Jet Perforation
2011-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-03 Perforation Treatment Performed - Jet Perforation
2011-12-03 Plug Back Performed
2011-12-03 Well Mode changed to Abandoned Zone
2011-12-10 Perforation Treatment Performed - Cement Plug
2011-12-10 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-11 Perforation 2044.00 2050.50 13
1981-02-13 Acid Treatment 2044.00 2050.50 0
2011-11-26 Packing Device Capped w/Cement 2015.00 2023.00 0
2011-11-28 Perforation 1515.00 1516.00 17
2011-12-03 Packing Device Capped w/Cement 1500.00 1508.00 0
2011-12-03 Perforation 881.00 882.00 17
2011-12-10 Remedial Casing Cementing 881.00 882.00 0
2011-12-10 Cement Plug 857.10 900.00 0

For data sources see[4]



References