If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786090313000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.73363,"lon":-119.282154,"icon":""}]} |
Location: 00/13-03-078-09W6/0 | |
Location Alias: 00/13-03-78-09 W6M | |
Location Alias 2: 00/13-03-078-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 09 | |
Section: 03 | |
County/Municipality: Saddle Hills County | |
Well Name: KELT EXP HZ PROGRESS 13-3-78-9 | |
Operator Name: Kelt Exploration Ltd. | |
License Number: 0482436 | |
License Date: 2017-01-17 | |
License Status: Issued | |
Spud Date: 2017-01-26 | |
Final Drill Date: 2017-02-11 | |
Well Total Depth: 4464.00 m | |
Surface Hole Latitude: 55.733630 | |
Surface Hole Longitude: -119.282154 |
Date | Event |
---|---|
2017-01-17 | Obtained License |
2017-01-28 | Surface Casing Operation Performed |
2017-01-29 | Direction Drilling Operation Performed - Deviate |
2017-02-03 | Direction Drilling Operation Performed - Horizontal |
2017-02-11 | Finished Drilling |
2017-02-11 | Well Log Performed |
2017-02-11 | Well Mode changed to Drilled and Cased |
2017-02-13 | Perforation Treatment Performed - Open-Hole Completion |
2017-02-14 | Intermediate Casing Operation Performed |
2017-02-14 | Production Casing Operation Performed |
2017-02-14 | Rig Released |
2017-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-10 | Well Began Production |
2017-11-10 | Well Fluid changed to Crude Oil |
2017-11-10 | Well Mode changed to Flowing |
2017-11-14 | Well Fluid changed to Crude Oil |
2017-11-14 | Well Mode changed to Gas Lift |
2019-03-08 | Well Fluid changed to Crude Oil |
2019-03-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-01-26 | Precision Drilling Corporation | 225 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-01-29 | 694.80 | Deviate (5 - 79 degrees) |
2017-02-03 | 2209.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-02-13 | Open Hole/Barefoot Completion | 4460.00 | 4464.00 | 0 |
2017-03-07 | Multi-Stage Fracture | 4040.70 | 4040.80 | 0 |
2017-03-07 | Multi-Stage Fracture | 3997.90 | 3998.00 | 0 |
2017-03-07 | Multi-Stage Fracture | 3941.40 | 3941.50 | 0 |
2017-03-07 | Multi-Stage Fracture | 3898.50 | 3898.60 | 0 |
2017-03-08 | Multi-Stage Fracture | 3842.50 | 3842.90 | 0 |
2017-03-08 | Multi-Stage Fracture | 3802.10 | 3802.20 | 0 |
2017-03-08 | Multi-Stage Fracture | 3746.80 | 3746.90 | 0 |
2017-03-08 | Multi-Stage Fracture | 3704.00 | 3704.10 | 0 |
2017-03-08 | Multi-Stage Fracture | 3647.60 | 3647.70 | 0 |
2017-03-08 | Multi-Stage Fracture | 3604.50 | 3604.60 | 0 |
2017-03-06 | Multi-Stage Fracture | 4429.50 | 4429.60 | 0 |
2017-03-08 | Multi-Stage Fracture | 3548.80 | 3548.90 | 0 |
2017-03-08 | Multi-Stage Fracture | 3506.20 | 3506.30 | 0 |
2017-03-08 | Multi-Stage Fracture | 3449.80 | 3449.90 | 0 |
2017-03-08 | Multi-Stage Fracture | 3407.70 | 3407.80 | 0 |
2017-03-08 | Multi-Stage Fracture | 3351.40 | 3351.50 | 0 |
2017-03-08 | Multi-Stage Fracture | 3308.60 | 3308.70 | 0 |
2017-03-08 | Multi-Stage Fracture | 3252.10 | 3252.20 | 0 |
2017-03-08 | Multi-Stage Fracture | 3196.20 | 3196.30 | 0 |
2017-03-08 | Multi-Stage Fracture | 3141.50 | 3141.60 | 0 |
2017-03-08 | Multi-Stage Fracture | 3085.00 | 3085.10 | 0 |
2017-03-07 | Multi-Stage Fracture | 4394.80 | 4394.90 | 0 |
2017-03-09 | Multi-Stage Fracture | 3031.50 | 3031.60 | 0 |
2017-03-09 | Multi-Stage Fracture | 2991.30 | 2991.40 | 0 |
2017-03-09 | Multi-Stage Fracture | 2935.80 | 2935.90 | 0 |
2017-03-09 | Multi-Stage Fracture | 2879.60 | 2879.70 | 0 |
2017-03-09 | Multi-Stage Fracture | 2837.30 | 2837.40 | 0 |
2017-03-09 | Multi-Stage Fracture | 2780.90 | 2781.00 | 0 |
2017-03-09 | Multi-Stage Fracture | 2721.10 | 2721.20 | 0 |
2017-03-09 | Multi-Stage Fracture | 2673.40 | 2673.50 | 0 |
2017-03-09 | Multi-Stage Fracture | 2625.70 | 2625.80 | 0 |
2017-03-09 | Multi-Stage Fracture | 2578.00 | 2578.10 | 0 |
2017-03-07 | Multi-Stage Fracture | 4338.40 | 4338.50 | 0 |
2017-03-09 | Multi-Stage Fracture | 2517.10 | 2517.20 | 0 |
2017-03-09 | Multi-Stage Fracture | 2469.50 | 2469.60 | 0 |
2017-03-09 | Multi-Stage Fracture | 2410.10 | 2410.20 | 0 |
2017-03-09 | Multi-Stage Fracture | 2362.40 | 2362.50 | 0 |
2017-03-10 | Multi-Stage Fracture | 2301.50 | 2301.60 | 0 |
2017-03-10 | Multi-Stage Fracture | 2267.10 | 2267.20 | 0 |
2017-03-10 | Multi-Stage Fracture | 2219.40 | 2219.50 | 0 |
2017-03-10 | Multi-Stage Fracture | 2185.10 | 2185.20 | 0 |
2017-03-07 | Multi-Stage Fracture | 4295.60 | 4295.70 | 0 |
2017-03-07 | Multi-Stage Fracture | 4239.20 | 4239.30 | 0 |
2017-03-07 | Multi-Stage Fracture | 4196.40 | 4196.50 | 0 |
2017-03-07 | Multi-Stage Fracture | 4140.00 | 4140.10 | 0 |
2017-03-07 | Multi-Stage Fracture | 4097.10 | 4097.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-03-06 | 2017-03-10 | 1,996 | 16,161 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.9975 | N/A | |||
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 13.8896 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 13.8896 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 13.8896 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 13.8896 | N/A | ||||
Sand (40/70) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 2.9541 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 2.9541 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 2.9541 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 2.9541 | N/A | ||||
U-Cide | Canyon Technical Services | Bactericide/Biocide | Phosphate Salt | Not Available | 100 | 0.0122 | N/A | |
Water | 7732-18-5 | 100 | 0.0122 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0554 | N/A | |
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0401 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0401 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0401 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0401 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0401 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0506 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-03-06 | 2017-03-10 | Recycled Fracturing Water (treated at well site) | 5013 |
2017-03-06 | 2017-03-10 | Surface Water - Runoff | 1535 |
2017-03-06 | 2017-03-10 | Surface Water - Runoff | 5902 |
2017-03-06 | 2017-03-10 | Surface Water - Runoff | 3770 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 1085 | 0.0 | 0.0 | 0.0 |
2018 | 4554 | 0.0 | 0.0 | 0.0 |
2019 | 6580 | 0.0 | 0.0 | 0.0 |
2020 | 2084 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-02-14 | No Incident Encountered | 0.00 | 0.00 |
2017-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]