X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786082116000

Well Details

Well ID: 0786082116000
Loading map...
Location: 00/16-21-078-08W6/0
Location Alias: 00/16-21-78-08 W6M
Location Alias 2: 00/16-21-078-08 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 08
Section: 21
County/Municipality: Saddle Hills County
Well Name: NUL SPIRIT RIVER 16-21-78-8
Operator Name: ATCO Gas And Pipelines Ltd.
License Number: 0082667
License Date: 1980-05-08
License Status: RecCertified
Spud Date: 1980-05-09
Final Drill Date: 1980-05-27
Well Total Depth: 1638.00 m
Surface Hole Latitude: 55.778190
Surface Hole Longitude: -119.169456

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-08 Obtained License
1980-05-19 Drill Stem Test Performed
1980-05-27 Finished Drilling
1980-05-27 Well Log Performed
1980-05-29 Drill Stem Test Performed
1980-05-30 Drill Stem Test Performed
1980-05-31 Production Casing Operation Performed
1980-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-05 Perforation Treatment Performed - Jet Perforation
1980-06-06 Perforation Treatment Performed - Jet Perforation
1980-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-11 Well Mode changed to Drilled and Cased
1980-08-22 Perforation Treatment Performed - Jet Perforation
1980-08-23 Perforation Treatment Performed - Fractured
1981-09-01 Well Began Production
1981-09-01 Well Fluid changed to Crude Oil
1981-09-01 Well Mode changed to Flowing
1981-10-01 Well Fluid changed to Crude Oil
1981-10-01 Well Mode changed to Suspended
1998-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-22 Plug Back Performed
1998-11-23 Well Abandoned
1998-11-23 Well Fluid changed to Crude Oil
1998-11-23 Well Mode changed to Abandoned
2000-12-12 Well Log Performed
2002-02-26 Perforation Treatment Performed - Jet Perforation
2002-02-26 Perforation Treatment Performed - Remedial Casing
2002-02-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-05 Perforation 1560.50 1563.00 7
1980-06-05 Acid Treatment 1560.50 1563.00 0
1980-06-06 Perforation 1551.00 1554.00 7
1980-06-07 Acid Treatment 1551.00 1554.00 0
1980-08-22 Perforation 1556.50 1558.00 14
1980-08-23 Fracture 1551.00 1563.00 0
1998-11-22 Packing Device Capped w/Cement 1532.00 1540.00 0
2002-02-26 Perforation 96.50 97.50 13
2002-02-26 Remedial Casing Cementing 96.50 97.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 96 0.0 0.0 0.0

For data sources see[5]

References