X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786081502000

Well Details

Well ID: 0786081502000
Loading map...
Location: 00/02-15-078-08W6/0
Location Alias: 00/02-15-78-08 W6M
Location Alias 2: 00/02-15-078-08 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 08
Section: 15
County/Municipality: Saddle Hills County
Well Name: WESTM ET AL SPIRIT RIVER 2-15-78-8
Operator Name: Nyrstar Myra Falls Ltd.
License Number: 0086486
License Date: 1980-10-21
License Status: Re-Entered
Spud Date: 1980-10-26
Final Drill Date: 1980-12-07
Well Total Depth: 3011.00 m
Surface Hole Latitude: 55.755607
Surface Hole Longitude: -119.144576

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-21 Obtained License
1980-11-05 Drill Stem Test Performed
1980-12-07 Finished Drilling
1980-12-07 Well Mode changed to Drilled and Cased
1980-12-08 Well Log Performed
1980-12-11 Drill Stem Test Performed
1980-12-18 Production Casing Operation Performed
1981-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-08 Perforation Treatment Performed - Cement Squeeze
1981-01-08 Perforation Treatment Performed - Jet Perforation
1981-01-09 Perforation Treatment Performed - Cement Squeeze
1981-01-09 Perforation Treatment Performed - Jet Perforation
1981-01-11 Perforation Treatment Performed - Jet Perforation
1981-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-16 Perforation Treatment Performed - Jet Perforation
1981-01-21 Perforation Treatment Performed - Cement Squeeze
1981-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-23 Perforation Treatment Performed - Jet Perforation
1981-03-01 Well Began Production
1981-03-01 Well Fluid changed to Crude Oil
1981-03-01 Well Mode changed to Flowing
1981-10-23 Well Fluid changed to Crude Oil
1981-10-23 Well Mode changed to Suspended
1988-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-07-07 Plug Back Performed
1988-07-07 Well Abandoned
1988-07-07 Well Fluid changed to Crude Oil
1988-07-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-08 Perforation 1547.90 1548.40 5
1981-01-16 Perforation 1363.00 1366.00 14
1981-01-21 Cement Squeeze 1363.00 1366.00 0
1981-01-23 Perforation 1363.00 1366.00 14
1981-01-23 Acid Treatment 1363.00 1366.00 0
1988-07-07 Packing Device Capped w/Cement 1350.00 1358.00 0
1981-01-08 Acid Treatment 1547.90 1548.40 0
1981-01-08 Cement Squeeze 1547.90 1548.40 0
1981-01-09 Perforation 1369.60 1370.00 5
1981-01-09 Cement Squeeze 1369.60 1370.00 0
1981-01-11 Perforation 1552.50 1555.00 13
1981-01-11 Perforation 1558.00 1559.50 13
1981-01-12 Acid Treatment 1552.50 1559.50 0
1981-01-16 Packing Device Capped w/Cement 1537.00 1545.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1882 0.0 0.0 0.0

For data sources see[5]

References