If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786080401002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.704761,"lon":-119.166735,"icon":""}]} |
Location: 00/01-04-078-08W6/2 | |
Location Alias: 00/01-04-78-08 W6M | |
Location Alias 2: 00/01-04-078-08 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 08 | |
Section: 04 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE PROGRESS 1-4-78-8 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0481617 | |
License Date: 2016-11-25 | |
License Status: Issued | |
Spud Date: 2016-12-29 | |
Final Drill Date: 2017-01-19 | |
Well Total Depth: 4049.00 m | |
Surface Hole Latitude: 55.704761 | |
Surface Hole Longitude: -119.166735 |
Date | Event |
---|---|
2016-11-25 | Obtained License |
2016-12-30 | Surface Casing Operation Performed |
2017-01-09 | Direction Drilling Operation Performed - Horizontal |
2017-01-13 | Intermediate Casing Operation Performed |
2017-01-19 | Finished Drilling |
2017-01-19 | Well Log Performed |
2017-01-19 | Well Mode changed to Drilled and Cased |
2017-01-21 | Liner Casing Operation Performed |
2017-01-21 | Rig Released |
2017-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-08 | Well Fluid changed to Crude Oil |
2017-03-08 | Well Mode changed to Drilling and Completing |
2017-04-22 | Well Began Production |
2017-04-22 | Well Fluid changed to Crude Oil |
2017-04-22 | Well Mode changed to Pumping |
2017-09-20 | Perforation Treatment Performed - Jet Perforation |
2017-09-20 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2017-01-09 | 1824.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-02-20 | Multi-Stage Fracture | 4035.00 | 4035.10 | 0 |
2017-02-21 | Multi-Stage Fracture | 3608.60 | 3608.70 | 0 |
2017-02-21 | Multi-Stage Fracture | 3561.40 | 3561.50 | 0 |
2017-02-21 | Multi-Stage Fracture | 3514.30 | 3514.40 | 0 |
2017-02-21 | Multi-Stage Fracture | 3467.10 | 3467.20 | 0 |
2017-02-21 | Multi-Stage Fracture | 3420.00 | 3420.10 | 0 |
2017-02-21 | Multi-Stage Fracture | 3372.80 | 3372.90 | 0 |
2017-02-21 | Multi-Stage Fracture | 3325.60 | 3325.70 | 0 |
2017-02-21 | Multi-Stage Fracture | 3278.50 | 3278.60 | 0 |
2017-02-21 | Multi-Stage Fracture | 3231.30 | 3231.40 | 0 |
2017-02-21 | Multi-Stage Fracture | 3184.30 | 3184.40 | 0 |
2017-02-20 | Multi-Stage Fracture | 3986.50 | 3986.60 | 0 |
2017-02-21 | Multi-Stage Fracture | 3137.00 | 3137.10 | 0 |
2017-02-21 | Multi-Stage Fracture | 3090.10 | 3090.20 | 0 |
2017-02-21 | Multi-Stage Fracture | 3043.00 | 3043.10 | 0 |
2017-02-22 | Multi-Stage Fracture | 2995.90 | 2996.00 | 0 |
2017-02-22 | Multi-Stage Fracture | 2948.80 | 2948.90 | 0 |
2017-02-22 | Multi-Stage Fracture | 2901.70 | 2901.80 | 0 |
2017-02-22 | Multi-Stage Fracture | 2843.20 | 2843.30 | 0 |
2017-02-22 | Multi-Stage Fracture | 2784.60 | 2784.70 | 0 |
2017-02-22 | Multi-Stage Fracture | 2725.90 | 2726.00 | 0 |
2017-02-22 | Multi-Stage Fracture | 2667.30 | 2667.40 | 0 |
2017-02-20 | Multi-Stage Fracture | 3938.90 | 3939.00 | 0 |
2017-02-22 | Multi-Stage Fracture | 2608.80 | 2608.90 | 0 |
2017-02-22 | Multi-Stage Fracture | 2550.20 | 2550.30 | 0 |
2017-02-22 | Multi-Stage Fracture | 2491.90 | 2492.00 | 0 |
2017-02-22 | Multi-Stage Fracture | 2433.50 | 2433.60 | 0 |
2017-02-22 | Multi-Stage Fracture | 2374.90 | 2375.00 | 0 |
2017-02-22 | Multi-Stage Fracture | 2316.80 | 2316.90 | 0 |
2017-09-20 | Perforation | 2140.00 | 2141.00 | 13 |
2017-02-20 | Multi-Stage Fracture | 3891.60 | 3891.70 | 0 |
2017-02-20 | Multi-Stage Fracture | 3844.30 | 3844.40 | 0 |
2017-02-20 | Multi-Stage Fracture | 3797.20 | 3797.30 | 0 |
2017-02-20 | Multi-Stage Fracture | 3750.00 | 3750.10 | 0 |
2017-02-20 | Multi-Stage Fracture | 3702.90 | 3703.00 | 0 |
2017-02-21 | Multi-Stage Fracture | 3655.80 | 3655.90 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-02-20 | 2017-02-22 | 2,114 | 10,216 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 85.101 | N/A | |||
Prime Plus (30/50) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 1.464 | N/A | ||
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 8.784 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 8.784 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 8.784 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 8.7841 | N/A | ||||
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 4.392 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.392 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.392 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.392 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0942 | N/A | |
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0824 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0824 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0824 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0824 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0824 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0479 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0341 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.0341 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0341 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-02-14 | 2017-02-20 | Surface Water - Runoff | 9153 |
2017-02-21 | 2017-02-21 | Surface Water - Runoff | 1063 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 3254 | 0.0 | 0.0 | 0.0 |
2018 | 3477 | 0.0 | 0.0 | 0.0 |
2019 | 8297 | 0.0 | 0.0 | 0.0 |
2020 | 2157 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-01-19 | No Incident Encountered | 0.00 | 0.00 |
2017-03-21 | No Incident Encountered | 0.00 | 0.00 |
2017-09-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]