If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786072805000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.76606,"lon":-119.032622,"icon":""}]} |
Location: 00/05-28-078-07W6/0 | |
Location Alias: 00/05-28-78-07 W6M | |
Location Alias 2: 00/05-28-078-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 07 | |
Section: 28 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ VALHALLA 5-28-78-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0481230 | |
License Date: 2016-11-04 | |
License Status: Issued | |
Spud Date: 2016-11-21 | |
Final Drill Date: 2016-12-01 | |
Well Total Depth: 3503.00 m | |
Surface Hole Latitude: 55.766060 | |
Surface Hole Longitude: -119.032622 |
Date | Event |
---|---|
2016-11-04 | Obtained License |
2016-11-22 | Surface Casing Operation Performed |
2016-11-23 | Direction Drilling Operation Performed - Deviate |
2016-11-24 | Direction Drilling Operation Performed - Horizontal |
2016-11-25 | Well Log Performed |
2016-11-26 | Intermediate Casing Operation Performed |
2016-12-01 | Finished Drilling |
2016-12-01 | Liner Casing Operation Performed |
2016-12-01 | Well Log Performed |
2016-12-01 | Well Mode changed to Drilled and Cased |
2016-12-02 | Rig Released |
2017-01-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-09 | Well Began Production |
2017-02-09 | Well Fluid changed to Crude Oil |
2017-02-09 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-11-21 | Beaver Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-11-23 | 1065.50 | Deviate (5 - 79 degrees) |
2016-11-24 | 1688.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-01-08 | Multi-Stage Fracture | 3474.70 | 3474.80 | 0 |
2017-01-09 | Multi-Stage Fracture | 2949.10 | 2949.20 | 0 |
2017-01-09 | Multi-Stage Fracture | 2890.40 | 2890.50 | 0 |
2017-01-09 | Multi-Stage Fracture | 2831.70 | 2831.80 | 0 |
2017-01-09 | Multi-Stage Fracture | 2773.20 | 2773.30 | 0 |
2017-01-09 | Multi-Stage Fracture | 2715.30 | 2715.40 | 0 |
2017-01-09 | Multi-Stage Fracture | 2657.00 | 2657.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 2598.50 | 2598.60 | 0 |
2017-01-09 | Multi-Stage Fracture | 2539.80 | 2539.90 | 0 |
2017-01-09 | Multi-Stage Fracture | 2481.30 | 2481.40 | 0 |
2017-01-09 | Multi-Stage Fracture | 2422.70 | 2422.80 | 0 |
2017-01-08 | Multi-Stage Fracture | 3416.20 | 3416.30 | 0 |
2017-01-09 | Multi-Stage Fracture | 2364.20 | 2364.30 | 0 |
2017-01-09 | Multi-Stage Fracture | 2306.00 | 2306.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 2247.40 | 2247.50 | 0 |
2017-01-09 | Multi-Stage Fracture | 2188.90 | 2189.00 | 0 |
2017-01-09 | Multi-Stage Fracture | 2130.70 | 2130.80 | 0 |
2017-01-09 | Multi-Stage Fracture | 2072.20 | 2072.30 | 0 |
2017-01-09 | Multi-Stage Fracture | 2014.00 | 2014.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 1955.80 | 1955.90 | 0 |
2017-01-09 | Multi-Stage Fracture | 1897.30 | 1897.40 | 0 |
2017-01-09 | Multi-Stage Fracture | 1838.80 | 1838.90 | 0 |
2017-01-08 | Multi-Stage Fracture | 3357.50 | 3357.60 | 0 |
2017-01-09 | Multi-Stage Fracture | 1780.20 | 1780.30 | 0 |
2017-01-08 | Multi-Stage Fracture | 3298.90 | 3299.00 | 0 |
2017-01-08 | Multi-Stage Fracture | 3240.80 | 3240.90 | 0 |
2017-01-08 | Multi-Stage Fracture | 3182.40 | 3182.50 | 0 |
2017-01-08 | Multi-Stage Fracture | 3124.00 | 3124.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 3065.80 | 3065.90 | 0 |
2017-01-09 | Multi-Stage Fracture | 3007.50 | 3007.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-01-08 | 2017-01-09 | 1,474 | 4,570 | N/A |
2 | 2017-01-09 | 2017-01-09 | 1,474 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 87.7663 | N/A | |||
Sand (20/40) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.701 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 5.701 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 5.7009 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 5.7009 | N/A | ||||
Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.1517 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.1517 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.1517 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.1516 | N/A | ||||
SiberProp (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 4.9522 | N/A | ||
Phenol formaldehyde resin | 9003-35-4 | 100 | 4.9522 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0971 | N/A | |
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.085 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.085 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.085 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.085 | N/A | ||||
Water | 7732-18-5 | 100 | 0.085 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0488 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0351 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.0351 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0351 | N/A | ||||
2 | Atlas CRC-LT (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 4.9118 | N/A | |
Phenolic Resin | 9003-35-4 | 100 | 4.9118 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-01-08 | 2017-01-09 | Surface Water - Runoff | 1860 |
2017-01-08 | 2017-01-09 | Surface Water - Runoff | 2686 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7117 | 0.0 | 0.0 | 0.0 |
2018 | 8344 | 0.0 | 0.0 | 0.0 |
2019 | 8615 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-01 | No Incident Encountered | 0.00 | 0.00 |
2017-01-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]