If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786071304020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.769189,"lon":-118.94778,"icon":""}]} |
Location: 02/04-13-078-07W6/0 | |
Location Alias: 02/04-13-78-07 W6M | |
Location Alias 2: 02/04-13-078-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 07 | |
Section: 13 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE 102 HZ VALHALLA 4-13-78-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0482493 | |
License Date: 2017-01-19 | |
License Status: Issued | |
Spud Date: 2017-02-14 | |
Final Drill Date: 2017-02-22 | |
Well Total Depth: 3310.00 m | |
Surface Hole Latitude: 55.769189 | |
Surface Hole Longitude: -118.947780 |
Date | Event |
---|---|
2017-01-19 | Obtained License |
2017-02-15 | Surface Casing Operation Performed |
2017-02-16 | Direction Drilling Operation Performed - Deviate |
2017-02-17 | Direction Drilling Operation Performed - Horizontal |
2017-02-19 | Intermediate Casing Operation Performed |
2017-02-22 | Finished Drilling |
2017-02-22 | Well Log Performed |
2017-02-22 | Well Mode changed to Drilled and Cased |
2017-02-24 | Liner Casing Operation Performed |
2017-02-24 | Rig Released |
2017-03-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-05-14 | Well Began Production |
2017-05-14 | Well Fluid changed to Crude Oil |
2017-05-14 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-02-14 | Beaver Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-02-16 | 1062.50 | Deviate (5 - 79 degrees) |
2017-02-17 | 1570.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-03-29 | Multi-Stage Fracture | 3276.30 | 3276.40 | 0 |
2017-03-30 | Multi-Stage Fracture | 2854.00 | 2854.10 | 0 |
2017-03-30 | Multi-Stage Fracture | 2807.10 | 2807.20 | 0 |
2017-03-30 | Multi-Stage Fracture | 2760.10 | 2760.20 | 0 |
2017-03-30 | Multi-Stage Fracture | 2713.10 | 2713.20 | 0 |
2017-03-30 | Multi-Stage Fracture | 2666.30 | 2666.40 | 0 |
2017-03-30 | Multi-Stage Fracture | 2618.90 | 2619.00 | 0 |
2017-03-30 | Multi-Stage Fracture | 2571.80 | 2571.90 | 0 |
2017-03-30 | Multi-Stage Fracture | 2524.80 | 2524.90 | 0 |
2017-03-30 | Multi-Stage Fracture | 2478.00 | 2478.10 | 0 |
2017-03-30 | Multi-Stage Fracture | 2431.00 | 2431.10 | 0 |
2017-03-30 | Multi-Stage Fracture | 3229.70 | 3229.80 | 0 |
2017-03-30 | Multi-Stage Fracture | 2384.30 | 2384.40 | 0 |
2017-03-30 | Multi-Stage Fracture | 2336.90 | 2337.00 | 0 |
2017-03-30 | Multi-Stage Fracture | 2289.70 | 2289.80 | 0 |
2017-03-31 | Multi-Stage Fracture | 2242.80 | 2242.90 | 0 |
2017-03-31 | Multi-Stage Fracture | 2195.70 | 2195.80 | 0 |
2017-03-31 | Multi-Stage Fracture | 2148.50 | 2148.60 | 0 |
2017-03-31 | Multi-Stage Fracture | 2113.00 | 2113.10 | 0 |
2017-03-31 | Multi-Stage Fracture | 2077.40 | 2077.50 | 0 |
2017-03-31 | Multi-Stage Fracture | 2042.00 | 2042.10 | 0 |
2017-03-31 | Multi-Stage Fracture | 2006.60 | 2006.70 | 0 |
2017-03-30 | Multi-Stage Fracture | 3183.00 | 3183.10 | 0 |
2017-03-31 | Multi-Stage Fracture | 1971.00 | 1971.10 | 0 |
2017-03-31 | Multi-Stage Fracture | 1935.60 | 1935.70 | 0 |
2017-03-31 | Multi-Stage Fracture | 1888.30 | 1888.40 | 0 |
2017-03-30 | Multi-Stage Fracture | 3136.50 | 3136.60 | 0 |
2017-03-30 | Multi-Stage Fracture | 3089.50 | 3089.60 | 0 |
2017-03-30 | Multi-Stage Fracture | 3042.30 | 3042.40 | 0 |
2017-03-30 | Multi-Stage Fracture | 2995.30 | 2995.40 | 0 |
2017-03-30 | Multi-Stage Fracture | 2948.30 | 2948.40 | 0 |
2017-03-30 | Multi-Stage Fracture | 2901.30 | 2901.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-03-29 | 2017-03-31 | 1,427 | 6,100 | N/A |
2 | 2017-03-30 | 2017-03-30 | 1,427 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 86.0675 | N/A | |||
Sand (20/40) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 8.6583 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 8.6583 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 8.6583 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 8.6582 | N/A | ||||
Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 0.9114 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 0.9114 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 0.9114 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 0.9113 | N/A | ||||
SiberProp (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 4.0647 | N/A | ||
Phenol formaldehyde resin | 9003-35-4 | 100 | 4.0647 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0956 | N/A | |
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0836 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0836 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0836 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0836 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0836 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.047 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.035 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.035 | N/A | ||||
Water | 7732-18-5 | 100 | 0.035 | N/A | ||||
2 | Atlas CRC-C (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 3.7753 | N/A | |
Hexamethylenetetramine | 100-97-0 | 100 | 3.7753 | N/A | ||||
Phenol formaldehyde resin | 9003-35-4 | 100 | 3.7753 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-03-31 | 2017-03-31 | Surface Water - Runoff | 6100 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 4562 | 0.0 | 0.0 | 0.0 |
2018 | 6216 | 0.0 | 0.0 | 0.0 |
2019 | 8145 | 0.0 | 0.0 | 0.0 |
2020 | 2176 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-02-22 | No Incident Encountered | 0.00 | 0.00 |
2017-04-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]