X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786060304002

Well Details

Well ID: 0786060304002
Loading map...
Location: 00/04-03-078-06W6/2
Location Alias: 00/04-03-78-06 W6M
Location Alias 2: 00/04-03-078-06 W6/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 06
Section: 03
County/Municipality: Municipal District of Spirit River No. 133
Well Name: BONAVISTA ET AL SPIRITR 4-3-78-6
Operator Name: Bonavista Energy Corporation
License Number: 0144499
License Date: 1990-06-19
License Status: RecCertified
Spud Date: 1990-07-05
Final Drill Date: 1990-07-10
Well Total Depth: 1470.00 m
Surface Hole Latitude: 55.725813
Surface Hole Longitude: -118.849274

For data sources see[1][2]

Well History

Date Event
1990-06-19 Obtained License
1990-07-05 Lost Circulation Occurred
1990-07-06 Surface Casing Operation Performed
1990-07-07 Lost Circulation Occurred
1990-07-10 Finished Drilling
1990-07-11 Well Log Performed
1990-07-12 Production Casing Operation Performed
1990-07-12 Rig Released
1990-08-03 Perforation Treatment Performed - Jet Perforation
1990-12-04 Perforation Treatment Performed - Cement Squeeze
1990-12-08 Perforation Treatment Performed - Jet Perforation
1992-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-27 Perforation Treatment Performed - Jet Perforation
1992-08-27 Plug Back Performed
1992-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-13 Plug Back Performed
1996-01-13 Well Abandoned
1996-01-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-03 Perforation 1434.50 1438.50 13
1992-08-27 Perforation 794.00 796.00 13
1992-08-27 Perforation 797.00 805.00 13
1992-08-27 Perforation 806.00 808.00 13
1992-08-29 Acid Treatment 769.50 808.00 0
1996-01-13 Packing Device Capped w/Cement 750.00 758.00 0
1990-08-03 Perforation 1439.50 1441.50 13
1990-08-03 Perforation 1442.50 1444.50 13
1990-12-04 Cement Squeeze 1434.40 1444.50 0
1990-12-08 Perforation 1434.00 1435.00 13
1992-08-27 Packing Device Capped w/Cement 1419.00 1427.00 0
1992-08-27 Perforation 769.50 771.50 13
1992-08-27 Perforation 774.50 775.50 13
1992-08-27 Perforation 786.00 793.00 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-07-05 Lost Circulation 48.00 275.00
1990-07-07 Lost Circulation 850.00 1260.00

For data sources see[5]

References