X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785212406000

Well Details

Well ID: 0785212406000
Loading map...
Location: 00/06-24-078-21W5/0
Location Alias: 00/06-24-78-21 W5M
Location Alias 2: 00/06-24-078-21 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 21
Section: 24
County/Municipality: Municipal District of Smoky River No. 130
Well Name: LONG RUN HZ NVILLE 6-24-78-21
Operator Name: Long Run Exploration Ltd.
License Number: 0433026
License Date: 2011-04-14
License Status: Issued
Spud Date: 2011-06-30
Final Drill Date: 2011-07-06
Well Total Depth: 2037.00 m
Surface Hole Latitude: 55.766118
Surface Hole Longitude: -117.107856

For data sources see[1][2]

Well History

Date Event
2011-04-14 Obtained License
2011-06-30 Well Log Performed
2011-07-01 Surface Casing Operation Performed
2011-07-02 Direction Drilling Operation Performed - Deviate
2011-07-03 Direction Drilling Operation Performed - Horizontal
2011-07-03 Intermediate Casing Operation Performed
2011-07-03 Well Log Performed
2011-07-04 Well Log Performed
2011-07-06 Finished Drilling
2011-07-06 Well Log Performed
2011-07-06 Well Mode changed to Drilled and Cased
2011-07-08 Liner Casing Operation Performed
2011-07-08 Perforation Treatment Performed - Open-Hole Completion
2011-07-08 Rig Released
2011-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-01 Well Fluid changed to Gas
2011-08-01 Well Mode changed to Testing
2011-08-02 Well Began Production
2011-08-02 Well Fluid changed to Crude Oil
2011-08-02 Well Mode changed to Flowing
2012-05-30 Well Fluid changed to Crude Oil
2012-05-30 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-02 671.00 Deviate (5 - 79 degrees)
2011-07-03 1032.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-07-08 Open Hole/Barefoot Completion 1988.30 2037.00 0
2011-08-01 Multi-Stage Fracture 1261.10 1261.20 0
2011-08-01 Multi-Stage Fracture 1163.00 1163.10 0
2011-08-01 Multi-Stage Fracture 1065.40 1065.50 0
2011-08-01 Multi-Stage Fracture 1988.20 1988.30 0
2011-08-01 Multi-Stage Fracture 1901.20 1901.30 0
2011-08-01 Multi-Stage Fracture 1802.90 1803.00 0
2011-08-01 Multi-Stage Fracture 1716.40 1716.50 0
2011-08-01 Multi-Stage Fracture 1629.90 1630.00 0
2011-08-01 Multi-Stage Fracture 1531.40 1531.50 0
2011-08-01 Multi-Stage Fracture 1444.90 1445.00 0
2011-08-01 Multi-Stage Fracture 1347.70 1347.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2323 0.0 0.0 0.0
2012 8312 0.0 0.0 0.0
2013 8445 0.0 0.0 0.0
2014 7864 0.0 0.0 0.0
2015 8720 0.0 0.0 0.0
2016 6293 0.0 0.0 0.0
2017 8181 0.0 0.0 0.0
2018 7963 0.0 0.0 0.0
2019 8493 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References