If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0785210410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.736025,"lon":-117.220879,"icon":""}]} |
Location: 00/10-04-078-21W5/0 | |
Location Alias: 00/10-04-78-21 W5M | |
Location Alias 2: 00/10-04-078-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 5 | |
Range: 21 | |
Section: 04 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN HZ ROXANA 10-4-78-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0442599 | |
License Date: 2012-01-10 | |
License Status: Issued | |
Spud Date: 2012-02-23 | |
Final Drill Date: 2012-03-02 | |
Well Total Depth: 2508.00 m | |
Surface Hole Latitude: 55.736025 | |
Surface Hole Longitude: -117.220879 |
Date | Event |
---|---|
2012-01-10 | Obtained License |
2012-02-23 | Well Log Performed |
2012-02-24 | Surface Casing Operation Performed |
2012-02-25 | Direction Drilling Operation Performed - Deviate |
2012-02-27 | Direction Drilling Operation Performed - Horizontal |
2012-02-27 | Intermediate Casing Operation Performed |
2012-02-27 | Well Log Performed |
2012-03-02 | Finished Drilling |
2012-03-02 | Well Log Performed |
2012-03-02 | Well Mode changed to Drilled and Cased |
2012-03-04 | Liner Casing Operation Performed |
2012-03-05 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-05 | Rig Released |
2012-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-16 | Well Began Production |
2012-03-16 | Well Fluid changed to Crude Oil |
2012-03-16 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-23 | Ensign Drilling Inc. | 88 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-25 | 695.10 | Deviate (5 - 79 degrees) |
2012-02-27 | 1047.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-05 | Open Hole/Barefoot Completion | 2475.00 | 2508.00 | 0 |
2012-03-15 | Multi-Stage Fracture | 1904.40 | 1904.50 | 0 |
2012-03-15 | Multi-Stage Fracture | 1828.10 | 1828.20 | 0 |
2012-03-15 | Multi-Stage Fracture | 1763.90 | 1764.00 | 0 |
2012-03-15 | Multi-Stage Fracture | 1687.70 | 1687.80 | 0 |
2012-03-15 | Multi-Stage Fracture | 1623.30 | 1623.40 | 0 |
2012-03-15 | Multi-Stage Fracture | 1547.60 | 1547.70 | 0 |
2012-03-15 | Multi-Stage Fracture | 1471.80 | 1471.90 | 0 |
2012-03-15 | Multi-Stage Fracture | 1395.90 | 1396.00 | 0 |
2012-03-15 | Multi-Stage Fracture | 1319.70 | 1319.80 | 0 |
2012-03-15 | Multi-Stage Fracture | 1243.70 | 1243.80 | 0 |
2012-03-14 | Multi-Stage Fracture | 2474.90 | 2475.00 | 0 |
2012-03-15 | Multi-Stage Fracture | 1167.60 | 1167.70 | 0 |
2012-03-15 | Multi-Stage Fracture | 1091.60 | 1091.70 | 0 |
2012-03-14 | Multi-Stage Fracture | 2410.40 | 2410.50 | 0 |
2012-03-14 | Multi-Stage Fracture | 2334.30 | 2334.40 | 0 |
2012-03-14 | Multi-Stage Fracture | 2258.40 | 2258.50 | 0 |
2012-03-15 | Multi-Stage Fracture | 2182.40 | 2182.50 | 0 |
2012-03-15 | Multi-Stage Fracture | 2106.50 | 2106.60 | 0 |
2012-03-15 | Multi-Stage Fracture | 2043.30 | 2043.40 | 0 |
2012-03-15 | Multi-Stage Fracture | 1967.70 | 1967.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6472 | 0.0 | 0.0 | 0.0 |
2013 | 8650 | 0.0 | 0.0 | 0.0 |
2014 | 8512 | 0.0 | 0.0 | 0.0 |
2015 | 8404 | 0.0 | 0.0 | 0.0 |
2016 | 8700 | 0.0 | 0.0 | 0.0 |
2017 | 8405 | 0.0 | 0.0 | 0.0 |
2018 | 8583 | 0.0 | 0.0 | 0.0 |
2019 | 8531 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]