X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0784082311000

Well Details

Well ID: 0784082311000
Loading map...
Location: 00/11-23-078-08W4/0
Location Alias: 00/11-23-78-08 W4M
Location Alias 2: 00/11-23-078-08 W4/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 4
Range: 08
Section: 23
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: PARA ET AL LEISMER 11-23-78-8
Operator Name: Sequoia Resources Corp.
License Number: 0184959
License Date: 1996-01-24
License Status: Suspension
Spud Date: 1996-02-06
Final Drill Date: 1996-02-07
Well Total Depth: 346.50 m
Surface Hole Latitude: 55.775583
Surface Hole Longitude: -111.136912

For data sources see[1][2]

Well History

Date Event
1996-01-24 Obtained License
1996-02-07 Finished Drilling
1996-02-07 Lost Circulation Occurred
1996-02-07 Surface Casing Operation Performed
1996-02-07 Well Log Performed
1996-02-08 Production Casing Operation Performed
1996-02-08 Rig Released
1996-02-08 Well Mode changed to Drilled and Cased
1996-02-15 Perforation Treatment Performed - Jet Perforation
1996-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-16 Perforation Treatment Performed - Jet Perforation
1996-02-16 Plug Back Performed
1996-02-18 Perforation Treatment Performed - Cement Squeeze
1996-02-18 Plug Back Performed
1996-02-20 Perforation Treatment Performed - Jet Perforation
1999-02-10 Well Mode changed to Drilled and Cased
2000-03-01 Well Began Production
2000-03-01 Well Fluid changed to Gas
2000-03-01 Well Mode changed to Flowing
2004-07-01 Well Fluid changed to Gas
2004-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-15 Perforation 330.00 333.00 13
1996-02-16 Perforation 296.80 297.40 13
1996-02-16 Packing Device Capped w/Cement 317.00 325.00 0
1996-02-16 Perforation 305.50 306.30 13
1996-02-18 Cement Squeeze 296.80 306.30 0
1996-02-20 Perforation 305.50 306.30 13
1996-02-20 Perforation 293.80 295.00 13
1996-02-20 Perforation 266.50 267.20 13
1996-02-20 Perforation 252.40 255.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6849 0.0 0.0 0.0
2001 7945 0.0 0.0 0.0
2002 4195 0.0 0.0 0.0
2003 398 0.0 0.0 0.0
2004 2579 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-02-07 Lost Circulation 346.50 346.50

For data sources see[6]

References