If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776133514030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.73395,"lon":-119.933381,"icon":""}]} |
Location: 03/14-35-077-13W6/0 | |
Location Alias: 03/14-35-77-13 W6M | |
Location Alias 2: 03/14-35-077-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 13 | |
Section: 35 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 12-03 HZ 103 PCOUPES 14-35-77-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0482075 | |
License Date: 2016-12-21 | |
License Status: Issued | |
Spud Date: 2017-05-06 | |
Final Drill Date: 2017-05-16 | |
Well Total Depth: 4493.00 m | |
Surface Hole Latitude: 55.733950 | |
Surface Hole Longitude: -119.933381 |
Date | Event |
---|---|
2016-12-21 | Obtained License |
2017-05-07 | Surface Casing Operation Performed |
2017-05-08 | Direction Drilling Operation Performed - Deviate |
2017-05-12 | Direction Drilling Operation Performed - Horizontal |
2017-05-12 | Well Log Performed |
2017-05-16 | Finished Drilling |
2017-05-16 | Well Log Performed |
2017-05-16 | Well Mode changed to Drilled and Cased |
2017-05-17 | Well Log Performed |
2017-05-18 | Production Casing Operation Performed |
2017-05-19 | Rig Released |
2017-08-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-10 | Perforation Treatment Performed - Open-Hole Completion |
2017-08-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-22 | Well Began Production |
2017-08-22 | Well Fluid changed to Gas |
2017-08-22 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-05-06 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-05-08 | 709.70 | Deviate (5 - 79 degrees) |
2017-05-12 | 2333.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-08-10 | Open Hole/Barefoot Completion | 4486.90 | 4493.00 | 0 |
2017-08-11 | Multi-Stage Fracture | 3686.00 | 3686.90 | 0 |
2017-08-11 | Multi-Stage Fracture | 3582.90 | 3583.80 | 0 |
2017-08-11 | Multi-Stage Fracture | 3479.80 | 3480.70 | 0 |
2017-08-11 | Multi-Stage Fracture | 3376.70 | 3377.60 | 0 |
2017-08-11 | Multi-Stage Fracture | 3273.60 | 3274.50 | 0 |
2017-08-11 | Multi-Stage Fracture | 3170.40 | 3171.30 | 0 |
2017-08-11 | Multi-Stage Fracture | 3067.20 | 3068.10 | 0 |
2017-08-11 | Multi-Stage Fracture | 2964.10 | 2965.00 | 0 |
2017-08-11 | Multi-Stage Fracture | 2861.00 | 2861.90 | 0 |
2017-08-11 | Multi-Stage Fracture | 2757.90 | 2758.80 | 0 |
2017-08-10 | Multi-Stage Fracture | 4477.60 | 4478.90 | 0 |
2017-08-11 | Multi-Stage Fracture | 2654.70 | 2655.60 | 0 |
2017-08-11 | Multi-Stage Fracture | 2551.60 | 2552.50 | 0 |
2017-08-11 | Multi-Stage Fracture | 2448.80 | 2449.70 | 0 |
2017-08-11 | Multi-Stage Fracture | 2383.60 | 2384.50 | 0 |
2017-08-10 | Multi-Stage Fracture | 4406.80 | 4407.70 | 0 |
2017-08-10 | Multi-Stage Fracture | 4303.70 | 4304.60 | 0 |
2017-08-10 | Multi-Stage Fracture | 4200.60 | 4201.50 | 0 |
2017-08-10 | Multi-Stage Fracture | 4097.60 | 4098.50 | 0 |
2017-08-10 | Multi-Stage Fracture | 3994.50 | 3995.40 | 0 |
2017-08-10 | Multi-Stage Fracture | 3891.50 | 3892.40 | 0 |
2017-08-10 | Multi-Stage Fracture | 3788.50 | 3789.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-08-10 | 2017-08-11 | 2,211 | 9,693 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 85.12 | N/A | |||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 8.8338 | N/A | ||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.8892 | N/A | ||
2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.03 | N/A | |
Methanol | 67-56-1 | 100 | 0.03 | N/A | ||||
Water | 7732-18-5 | 100 | 0.03 | N/A | ||||
Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0041 | N/A | |
FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.1022 | N/A | |
Non-hazardous | Not Available | 100 | 0.1022 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-07-16 | 2017-07-21 | Recycled Fracturing Water (treated at independent stand-alone facility) | 1129 |
2017-08-10 | 2017-08-18 | Recycled Fracturing Water (treated at well site) | 388 |
2017-08-10 | 2017-08-10 | Recycled Fracturing Water (treated at well site) | 6 |
2017-08-10 | 2017-08-12 | Recycled Fracturing Water (treated at well site) | 12 |
2017-08-09 | 2017-08-11 | Recycled Fracturing Water (treated at well site) | 18 |
2017-08-10 | 2017-08-18 | Surface Water - Runoff | 8474 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2670 | 0.0 | 0.0 | 0.0 |
2018 | 8545 | 0.0 | 0.0 | 0.0 |
2019 | 8567 | 0.0 | 0.0 | 0.0 |
2020 | 2180 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-05-19 | No Incident Encountered | 0.00 | 0.00 |
2017-08-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]