If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0776133303000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.696073,"lon":-119.912303,"icon":""}]} |
| Location: 00/03-33-077-13W6/0 | |
| Location Alias: 00/03-33-77-13 W6M | |
| Location Alias 2: 00/03-33-077-13 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 077 | |
| Meridian: 6 | |
| Range: 13 | |
| Section: 33 | |
| County/Municipality: Saddle Hills County | |
| Well Name: BIR 4-26 HZ PCOUPES 3-33-77-13 | |
| Operator Name: Birchcliff Energy Ltd. | |
| License Number: 0481611 | |
| License Date: 2016-11-24 | |
| License Status: Issued | |
| Spud Date: 2017-01-27 | |
| Final Drill Date: 2017-02-10 | |
| Well Total Depth: 5543.00 m | |
| Surface Hole Latitude: 55.696073 | |
| Surface Hole Longitude: -119.912303 |
| Date | Event |
|---|---|
| 2016-11-24 | Obtained License |
| 2017-01-28 | Surface Casing Operation Performed |
| 2017-01-30 | Direction Drilling Operation Performed - Deviate |
| 2017-02-03 | Direction Drilling Operation Performed - Horizontal |
| 2017-02-09 | Well Log Performed |
| 2017-02-10 | Finished Drilling |
| 2017-02-10 | Well Mode changed to Drilled and Cased |
| 2017-02-11 | Production Casing Operation Performed |
| 2017-02-13 | Rig Released |
| 2017-06-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-06-16 | Perforation Treatment Performed - Open-Hole Completion |
| 2017-06-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-06-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-02 | Well Fluid changed to Gas |
| 2017-08-02 | Well Mode changed to Testing |
| 2017-08-23 | Well Began Production |
| 2017-08-23 | Well Fluid changed to Gas |
| 2017-08-23 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-01-27 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-01-30 | 1375.70 | Deviate (5 - 79 degrees) |
| 2017-02-03 | 2422.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-06-16 | Open Hole/Barefoot Completion | 5535.00 | 5543.00 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4971.10 | 4972.00 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4893.20 | 4894.10 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4828.00 | 4828.90 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4750.20 | 4751.10 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4684.90 | 4685.80 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4606.90 | 4607.80 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4541.60 | 4542.50 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4463.70 | 4464.60 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4385.80 | 4386.70 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4320.70 | 4321.60 | 0 |
| 2017-06-16 | Multi-Stage Fracture | 5523.60 | 5524.90 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4242.80 | 4243.70 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4177.50 | 4178.40 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4099.60 | 4100.50 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 4034.30 | 4035.20 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 3956.40 | 3957.30 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 3891.10 | 3892.00 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 3813.40 | 3814.30 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 3748.10 | 3749.00 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 3670.20 | 3671.10 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 3592.20 | 3593.10 | 0 |
| 2017-06-16 | Multi-Stage Fracture | 5478.00 | 5478.90 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 3527.00 | 3527.90 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 3449.20 | 3450.10 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 3383.90 | 3384.80 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 3306.00 | 3306.90 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 3240.80 | 3241.70 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 3162.80 | 3163.70 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 3097.50 | 3098.40 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 3019.90 | 3020.80 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 2954.80 | 2955.70 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 2876.90 | 2877.80 | 0 |
| 2017-06-16 | Multi-Stage Fracture | 5400.10 | 5401.00 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 2799.20 | 2800.10 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 2733.90 | 2734.80 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 2656.00 | 2656.90 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 2591.50 | 2592.40 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 2513.60 | 2514.50 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 2448.40 | 2449.30 | 0 |
| 2017-06-18 | Multi-Stage Fracture | 2395.80 | 2396.70 | 0 |
| 2017-06-16 | Multi-Stage Fracture | 5334.80 | 5335.70 | 0 |
| 2017-06-16 | Multi-Stage Fracture | 5256.90 | 5257.80 | 0 |
| 2017-06-16 | Multi-Stage Fracture | 5179.10 | 5180.00 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 5114.20 | 5115.10 | 0 |
| 2017-06-17 | Multi-Stage Fracture | 5036.30 | 5037.20 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-06-16 | 2017-06-18 | 2,216 | 14,867 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 86.2935 | N/A | |||
| FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.4787 | N/A | ||
| FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.0632 | N/A | ||
| 2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0298 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0298 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0298 | N/A | ||||
| Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0042 | N/A | |
| FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.1087 | N/A | |
| Non-hazardous | Not Available | 100 | 0.1087 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-06-16 | 2017-06-27 | Recycled Fracturing Water (treated at well site) | 818 |
| 2017-06-22 | 2017-06-23 | Recycled Fracturing Water (treated at well site) | 81 |
| 2017-06-16 | 2017-06-27 | Groundwater - Saline | 183 |
| 2017-06-07 | 2017-06-21 | Recycled Fracturing Water (treated at well site) | 965 |
| 2017-06-07 | 2017-06-27 | Recycled Fracturing Water (treated at independent stand-alone facility) | 284 |
| 2017-06-23 | 2017-06-25 | Recycled Fracturing Water (treated at well site) | 132 |
| 2017-06-16 | 2017-06-17 | Recycled Fracturing Water (treated at well site) | 54 |
| 2017-08-14 | 2017-08-14 | Recycled Fracturing Water (treated at well site) | 13 |
| 2017-08-09 | 2017-08-19 | Recycled Fracturing Water (treated at well site) | 218 |
| 2017-06-16 | 2017-06-28 | Surface Water - Runoff | 12227 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 1562 | 0.0 | 0.0 | 0.0 |
| 2018 | 8616 | 0.0 | 0.0 | 0.0 |
| 2019 | 8652 | 0.0 | 0.0 | 0.0 |
| 2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-02-13 | No Incident Encountered | 0.00 | 0.00 |
| 2017-06-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]