X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776133303000

Well Details

Well ID: 0776133303000
Loading map...
Location: 00/03-33-077-13W6/0
Location Alias: 00/03-33-77-13 W6M
Location Alias 2: 00/03-33-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 33
County/Municipality: Saddle Hills County
Well Name: BIR 4-26 HZ PCOUPES 3-33-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0481611
License Date: 2016-11-24
License Status: Issued
Spud Date: 2017-01-27
Final Drill Date: 2017-02-10
Well Total Depth: 5543.00 m
Surface Hole Latitude: 55.696073
Surface Hole Longitude: -119.912303

For data sources see[1][2]

Well History

Date Event
2016-11-24 Obtained License
2017-01-28 Surface Casing Operation Performed
2017-01-30 Direction Drilling Operation Performed - Deviate
2017-02-03 Direction Drilling Operation Performed - Horizontal
2017-02-09 Well Log Performed
2017-02-10 Finished Drilling
2017-02-10 Well Mode changed to Drilled and Cased
2017-02-11 Production Casing Operation Performed
2017-02-13 Rig Released
2017-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-16 Perforation Treatment Performed - Open-Hole Completion
2017-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-02 Well Fluid changed to Gas
2017-08-02 Well Mode changed to Testing
2017-08-23 Well Began Production
2017-08-23 Well Fluid changed to Gas
2017-08-23 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-27 Trinidad Drilling Ltd. 449 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-30 1375.70 Deviate (5 - 79 degrees)
2017-02-03 2422.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-16 Open Hole/Barefoot Completion 5535.00 5543.00 0
2017-06-17 Multi-Stage Fracture 4971.10 4972.00 0
2017-06-17 Multi-Stage Fracture 4893.20 4894.10 0
2017-06-17 Multi-Stage Fracture 4828.00 4828.90 0
2017-06-17 Multi-Stage Fracture 4750.20 4751.10 0
2017-06-17 Multi-Stage Fracture 4684.90 4685.80 0
2017-06-17 Multi-Stage Fracture 4606.90 4607.80 0
2017-06-17 Multi-Stage Fracture 4541.60 4542.50 0
2017-06-17 Multi-Stage Fracture 4463.70 4464.60 0
2017-06-17 Multi-Stage Fracture 4385.80 4386.70 0
2017-06-17 Multi-Stage Fracture 4320.70 4321.60 0
2017-06-16 Multi-Stage Fracture 5523.60 5524.90 0
2017-06-17 Multi-Stage Fracture 4242.80 4243.70 0
2017-06-17 Multi-Stage Fracture 4177.50 4178.40 0
2017-06-17 Multi-Stage Fracture 4099.60 4100.50 0
2017-06-17 Multi-Stage Fracture 4034.30 4035.20 0
2017-06-17 Multi-Stage Fracture 3956.40 3957.30 0
2017-06-17 Multi-Stage Fracture 3891.10 3892.00 0
2017-06-17 Multi-Stage Fracture 3813.40 3814.30 0
2017-06-17 Multi-Stage Fracture 3748.10 3749.00 0
2017-06-17 Multi-Stage Fracture 3670.20 3671.10 0
2017-06-17 Multi-Stage Fracture 3592.20 3593.10 0
2017-06-16 Multi-Stage Fracture 5478.00 5478.90 0
2017-06-18 Multi-Stage Fracture 3527.00 3527.90 0
2017-06-18 Multi-Stage Fracture 3449.20 3450.10 0
2017-06-18 Multi-Stage Fracture 3383.90 3384.80 0
2017-06-18 Multi-Stage Fracture 3306.00 3306.90 0
2017-06-18 Multi-Stage Fracture 3240.80 3241.70 0
2017-06-18 Multi-Stage Fracture 3162.80 3163.70 0
2017-06-18 Multi-Stage Fracture 3097.50 3098.40 0
2017-06-18 Multi-Stage Fracture 3019.90 3020.80 0
2017-06-18 Multi-Stage Fracture 2954.80 2955.70 0
2017-06-18 Multi-Stage Fracture 2876.90 2877.80 0
2017-06-16 Multi-Stage Fracture 5400.10 5401.00 0
2017-06-18 Multi-Stage Fracture 2799.20 2800.10 0
2017-06-18 Multi-Stage Fracture 2733.90 2734.80 0
2017-06-18 Multi-Stage Fracture 2656.00 2656.90 0
2017-06-18 Multi-Stage Fracture 2591.50 2592.40 0
2017-06-18 Multi-Stage Fracture 2513.60 2514.50 0
2017-06-18 Multi-Stage Fracture 2448.40 2449.30 0
2017-06-18 Multi-Stage Fracture 2395.80 2396.70 0
2017-06-16 Multi-Stage Fracture 5334.80 5335.70 0
2017-06-16 Multi-Stage Fracture 5256.90 5257.80 0
2017-06-16 Multi-Stage Fracture 5179.10 5180.00 0
2017-06-17 Multi-Stage Fracture 5114.20 5115.10 0
2017-06-17 Multi-Stage Fracture 5036.30 5037.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-16 2017-06-18 2,216 14,867 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.2935 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.4787 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 4.0632 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0298 N/A
Methanol 67-56-1 100 0.0298 N/A
Water 7732-18-5 100 0.0298 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0042 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.1087 N/A
Non-hazardous Not Available 100 0.1087 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-16 2017-06-27 Recycled Fracturing Water (treated at well site) 818
2017-06-22 2017-06-23 Recycled Fracturing Water (treated at well site) 81
2017-06-16 2017-06-27 Groundwater - Saline 183
2017-06-07 2017-06-21 Recycled Fracturing Water (treated at well site) 965
2017-06-07 2017-06-27 Recycled Fracturing Water (treated at independent stand-alone facility) 284
2017-06-23 2017-06-25 Recycled Fracturing Water (treated at well site) 132
2017-06-16 2017-06-17 Recycled Fracturing Water (treated at well site) 54
2017-08-14 2017-08-14 Recycled Fracturing Water (treated at well site) 13
2017-08-09 2017-08-19 Recycled Fracturing Water (treated at well site) 218
2017-06-16 2017-06-28 Surface Water - Runoff 12227

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1562 0.0 0.0 0.0
2018 8616 0.0 0.0 0.0
2019 8652 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-13 No Incident Encountered 0.00 0.00
2017-06-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References