X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776132713030

Well Details

Well ID: 0776132713030
Loading map...
Location: 03/13-27-077-13W6/0
Location Alias: 03/13-27-77-13 W6M
Location Alias 2: 03/13-27-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 27
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF 4-26 PCOUPES 13-27-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0442892
License Date: 2012-01-16
License Status: Issued
Spud Date: 2012-02-13
Final Drill Date: 2012-03-04
Well Total Depth: 4560.00 m
Surface Hole Latitude: 55.695161
Surface Hole Longitude: -119.911084

For data sources see[1][2]

Well History

Date Event
2012-01-16 Obtained License
2012-02-15 Surface Casing Operation Performed
2012-02-20 Direction Drilling Operation Performed - Horizontal
2012-02-20 Well Log Performed
2012-03-04 Finished Drilling
2012-03-04 Well Log Performed
2012-03-04 Well Mode changed to Drilled and Cased
2012-03-07 Liner Casing Operation Performed
2012-03-07 Production Casing Operation Performed
2012-03-07 Rig Released
2012-03-17 Perforation Treatment Performed - Open-Hole Completion
2012-03-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-30 Well Fluid changed to Gas
2012-03-30 Well Mode changed to Testing
2012-04-27 Well Began Production
2012-04-27 Well Fluid changed to Gas
2012-04-27 Well Mode changed to Flowing
2017-07-01 Well Fluid changed to Gas
2017-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-13 Savanna Drilling Corp. 637 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-20 2019.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-17 Open Hole/Barefoot Completion 4556.00 4560.00 0
2012-03-27 Multi-Stage Fracture 3519.00 3519.80 0
2012-03-28 Multi-Stage Fracture 3400.70 3401.50 0
2012-03-28 Multi-Stage Fracture 3269.70 3270.50 0
2012-03-28 Multi-Stage Fracture 3138.90 3139.70 0
2012-03-28 Multi-Stage Fracture 3020.30 3021.10 0
2012-03-29 Multi-Stage Fracture 2888.90 2889.70 0
2012-03-29 Multi-Stage Fracture 2757.50 2758.30 0
2012-03-29 Multi-Stage Fracture 2639.30 2640.10 0
2012-03-20 Multi-Stage Fracture 4534.00 4534.80 0
2012-03-25 Multi-Stage Fracture 4408.90 4409.70 0
2012-03-25 Multi-Stage Fracture 4290.60 4291.40 0
2012-03-26 Multi-Stage Fracture 4160.00 4160.80 0
2012-03-26 Multi-Stage Fracture 4028.50 4029.30 0
2012-03-26 Multi-Stage Fracture 3909.90 3910.70 0
2012-03-26 Multi-Stage Fracture 3780.10 3780.90 0
2012-03-27 Multi-Stage Fracture 3649.70 3650.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5869 0.0 0.0 0.0
2013 8715 0.0 0.0 0.0
2014 8256 0.0 0.0 0.0
2015 6124 0.0 0.0 0.0
2016 7289 0.0 0.0 0.0
2017 6255 0.0 0.0 0.0
2018 7551 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-03 No Incident Encountered 0.00 0.00

For data sources see[8]

References