If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0776132309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.696075,"lon":-119.911667,"icon":""}]} |
| Location: 00/09-23-077-13W6/0 | |
| Location Alias: 00/09-23-77-13 W6M | |
| Location Alias 2: 00/09-23-077-13 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 077 | |
| Meridian: 6 | |
| Range: 13 | |
| Section: 23 | |
| County/Municipality: Saddle Hills County | |
| Well Name: BIR 4-26 HZ PCOUPES 9-23-77-13 | |
| Operator Name: Birchcliff Energy Ltd. | |
| License Number: 0481635 | |
| License Date: 2016-11-25 | |
| License Status: Issued | |
| Spud Date: 2017-04-24 | |
| Final Drill Date: 2017-05-05 | |
| Well Total Depth: 4127.00 m | |
| Surface Hole Latitude: 55.696075 | |
| Surface Hole Longitude: -119.911667 |
| Date | Event |
|---|---|
| 2016-11-25 | Obtained License |
| 2017-04-25 | Surface Casing Operation Performed |
| 2017-04-26 | Direction Drilling Operation Performed - Deviate |
| 2017-05-01 | Direction Drilling Operation Performed - Horizontal |
| 2017-05-05 | Finished Drilling |
| 2017-05-05 | Well Log Performed |
| 2017-05-05 | Well Mode changed to Drilled and Cased |
| 2017-05-07 | Production Casing Operation Performed |
| 2017-05-08 | Rig Released |
| 2017-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-20 | Perforation Treatment Performed - Open-Hole Completion |
| 2017-11-01 | Well Fluid changed to Gas |
| 2017-11-01 | Well Mode changed to Testing |
| 2017-11-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-11-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-11-26 | Well Began Production |
| 2017-11-26 | Well Fluid changed to Gas |
| 2017-11-26 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-04-24 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-04-26 | 688.20 | Deviate (5 - 79 degrees) |
| 2017-05-01 | 2532.50 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-08-20 | Open Hole/Barefoot Completion | 4125.00 | 4127.00 | 0 |
| 2017-11-24 | Multi-Stage Fracture | 3015.80 | 3016.70 | 0 |
| 2017-11-24 | Multi-Stage Fracture | 2900.20 | 2901.10 | 0 |
| 2017-11-24 | Multi-Stage Fracture | 2784.90 | 2785.80 | 0 |
| 2017-11-25 | Multi-Stage Fracture | 2669.00 | 2669.90 | 0 |
| 2017-11-25 | Multi-Stage Fracture | 2603.80 | 2604.70 | 0 |
| 2017-08-20 | Multi-Stage Fracture | 4113.60 | 4114.90 | 0 |
| 2017-08-20 | Multi-Stage Fracture | 4042.70 | 4043.60 | 0 |
| 2017-11-24 | Multi-Stage Fracture | 3696.60 | 3697.50 | 0 |
| 2017-11-24 | Multi-Stage Fracture | 3581.30 | 3582.20 | 0 |
| 2017-11-24 | Multi-Stage Fracture | 3465.70 | 3466.60 | 0 |
| 2017-11-24 | Multi-Stage Fracture | 3350.10 | 3351.00 | 0 |
| 2017-11-24 | Multi-Stage Fracture | 3247.10 | 3248.00 | 0 |
| 2017-11-24 | Multi-Stage Fracture | 3131.50 | 3132.40 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-08-20 | 2017-11-25 | 2,397 | 5,745 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 85.672 | N/A | |||
| FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.8328 | N/A | ||
| FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.3449 | N/A | ||
| 2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.027 | N/A | |
| Methanol | 67-56-1 | 100 | 0.027 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.027 | N/A | ||||
| Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.004 | N/A | |
| FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.0992 | N/A | |
| Non-hazardous | Not Available | 100 | 0.0992 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-06-16 | 2017-06-27 | Recycled Fracturing Water (treated at well site) | 829 |
| 2017-06-22 | 2017-06-23 | Recycled Fracturing Water (treated at well site) | 28 |
| 2017-06-16 | 2017-06-27 | Groundwater - Saline | 65 |
| 2017-06-07 | 2017-06-21 | Recycled Fracturing Water (treated at well site) | 427 |
| 2017-06-07 | 2017-06-27 | Recycled Fracturing Water (treated at independent stand-alone facility) | 187 |
| 2017-06-23 | 2017-06-25 | Recycled Fracturing Water (treated at well site) | 47 |
| 2017-06-16 | 2017-06-17 | Recycled Fracturing Water (treated at well site) | 62 |
| 2017-08-14 | 2017-08-14 | Recycled Fracturing Water (treated at well site) | 5 |
| 2017-08-09 | 2017-08-19 | Recycled Fracturing Water (treated at well site) | 77 |
| 2017-06-16 | 2017-06-28 | Surface Water - Runoff | 4317 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 569 | 0.0 | 0.0 | 0.0 |
| 2018 | 8649 | 0.0 | 0.0 | 0.0 |
| 2019 | 8674 | 0.0 | 0.0 | 0.0 |
| 2020 | 2154 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-05-08 | No Incident Encountered | 0.00 | 0.00 |
| 2017-12-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]