X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776132301030

Well Details

Well ID: 0776132301030
Loading map...
Location: 03/01-23-077-13W6/0
Location Alias: 03/01-23-77-13 W6M
Location Alias 2: 03/01-23-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 23
County/Municipality: Saddle Hills County
Well Name: BIR 4-26 HZ PCOUPES 1-23-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0481633
License Date: 2016-11-25
License Status: Issued
Spud Date: 2017-04-07
Final Drill Date: 2017-04-19
Well Total Depth: 4759.00 m
Surface Hole Latitude: 55.696074
Surface Hole Longitude: -119.911922

For data sources see[1][2]

Well History

Date Event
2016-11-25 Obtained License
2017-04-08 Surface Casing Operation Performed
2017-04-09 Direction Drilling Operation Performed - Deviate
2017-04-15 Direction Drilling Operation Performed - Horizontal
2017-04-18 Kick Occurred
2017-04-19 Finished Drilling
2017-04-19 Well Log Performed
2017-04-19 Well Mode changed to Drilled and Cased
2017-04-20 Well Log Performed
2017-04-22 Production Casing Operation Performed
2017-04-23 Rig Released
2017-06-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-26 Perforation Treatment Performed - Open-Hole Completion
2017-06-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-26 Well Began Production
2017-08-26 Well Fluid changed to Gas
2017-08-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-04-07 Trinidad Drilling Ltd. 449 N/A Drill To LD
2017-04-07 Trinidad Drilling Ltd. 449 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-04-09 741.50 Deviate (5 - 79 degrees)
2017-04-15 2547.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-26 Open Hole/Barefoot Completion 4754.00 4759.00 0
2017-06-27 Multi-Stage Fracture 4105.50 4106.30 0
2017-06-27 Multi-Stage Fracture 4054.00 4054.80 0
2017-06-27 Multi-Stage Fracture 4001.50 4002.30 0
2017-06-27 Multi-Stage Fracture 3948.80 3949.60 0
2017-06-27 Multi-Stage Fracture 3883.60 3884.40 0
2017-06-27 Multi-Stage Fracture 3831.00 3831.80 0
2017-06-27 Multi-Stage Fracture 3778.40 3779.20 0
2017-06-27 Multi-Stage Fracture 3725.70 3726.50 0
2017-06-27 Multi-Stage Fracture 3673.10 3673.90 0
2017-06-27 Multi-Stage Fracture 3620.70 3621.50 0
2017-06-26 Multi-Stage Fracture 4742.60 4743.90 0
2017-06-27 Multi-Stage Fracture 3568.00 3568.80 0
2017-06-27 Multi-Stage Fracture 3502.80 3503.60 0
2017-06-27 Multi-Stage Fracture 3450.10 3450.90 0
2017-06-27 Multi-Stage Fracture 3397.50 3398.30 0
2017-06-27 Multi-Stage Fracture 3344.80 3345.60 0
2017-06-27 Multi-Stage Fracture 3292.20 3293.00 0
2017-06-27 Multi-Stage Fracture 3239.60 3240.40 0
2017-06-27 Multi-Stage Fracture 3186.90 3187.70 0
2017-06-27 Multi-Stage Fracture 3134.30 3135.10 0
2017-06-27 Multi-Stage Fracture 3069.00 3069.80 0
2017-06-26 Multi-Stage Fracture 4486.70 4487.50 0
2017-06-27 Multi-Stage Fracture 3016.40 3017.20 0
2017-06-28 Multi-Stage Fracture 2965.50 2966.30 0
2017-06-28 Multi-Stage Fracture 2912.90 2913.70 0
2017-06-28 Multi-Stage Fracture 2860.20 2861.00 0
2017-06-28 Multi-Stage Fracture 2820.20 2821.00 0
2017-06-27 Multi-Stage Fracture 4434.00 4434.80 0
2017-06-27 Multi-Stage Fracture 4381.30 4382.10 0
2017-06-27 Multi-Stage Fracture 4328.80 4329.60 0
2017-06-27 Multi-Stage Fracture 4263.50 4264.30 0
2017-06-27 Multi-Stage Fracture 4210.80 4211.60 0
2017-06-27 Multi-Stage Fracture 4158.20 4159.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-26 2017-06-28 2,409 11,131 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.468 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.3723 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.9997 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0288 N/A
Methanol 67-56-1 100 0.0288 N/A
Water 7732-18-5 100 0.0288 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.004 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.1058 N/A
Non-hazardous Not Available 100 0.1058 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-16 2017-06-27 Recycled Fracturing Water (treated at well site) 613
2017-06-22 2017-06-23 Recycled Fracturing Water (treated at well site) 60
2017-06-16 2017-06-27 Groundwater - Saline 137
2017-06-07 2017-06-21 Recycled Fracturing Water (treated at well site) 723
2017-06-07 2017-06-27 Recycled Fracturing Water (treated at independent stand-alone facility) 212
2017-06-23 2017-06-25 Recycled Fracturing Water (treated at well site) 99
2017-06-16 2017-06-17 Recycled Fracturing Water (treated at well site) 40
2017-08-14 2017-08-14 Recycled Fracturing Water (treated at well site) 10
2017-08-09 2017-08-19 Recycled Fracturing Water (treated at well site) 163
2017-06-16 2017-06-28 Surface Water - Runoff 9154

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2903 0.0 0.0 0.0
2018 8667 0.0 0.0 0.0
2019 8651 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-04-18 Kick 4001.00 4020.00
2017-06-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References