X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776132115020

Well Details

Well ID: 0776132115020
Loading map...
Location: 02/15-21-077-13W6/0
Location Alias: 02/15-21-77-13 W6M
Location Alias 2: 02/15-21-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 21
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ 02 PCOUPES 15-21-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0419196
License Date: 2010-03-11
License Status: Issued
Spud Date: 2010-03-26
Final Drill Date: 2010-04-13
Well Total Depth: 4065.00 m
Surface Hole Latitude: 55.685167
Surface Hole Longitude: -119.922643

For data sources see[1][2]

Well History

Date Event
2010-03-11 Obtained License
2010-03-28 Surface Casing Operation Performed
2010-04-02 Direction Drilling Operation Performed - Horizontal
2010-04-09 Well Log Performed
2010-04-13 Finished Drilling
2010-04-13 Well Log Performed
2010-04-13 Well Mode changed to Drilled and Cased
2010-04-15 Liner Casing Operation Performed
2010-04-15 Production Casing Operation Performed
2010-04-15 Rig Released
2010-04-19 Well Log Performed
2010-07-12 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-12 Perforation Treatment Performed - Open-Hole Completion
2010-07-13 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-15 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-16 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-17 Well Began Production
2010-08-17 Well Fluid changed to Gas
2010-08-17 Well Mode changed to Flowing
2017-07-01 Well Fluid changed to Gas
2017-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-04-02 1970.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-12 Open Hole/Barefoot Completion 4062.00 4065.00 0
2010-07-14 Multi-Stage Fracture 2834.30 2835.10 0
2010-07-15 Multi-Stage Fracture 2685.50 2686.30 0
2010-07-16 Multi-Stage Fracture 2528.10 2528.90 0
2010-07-16 Multi-Stage Fracture 2421.70 2422.50 0
2010-07-12 Multi-Stage Fracture 4052.70 4053.50 0
2010-07-12 Multi-Stage Fracture 3900.20 3901.00 0
2010-07-13 Multi-Stage Fracture 3743.70 3744.50 0
2010-07-13 Multi-Stage Fracture 3581.60 3582.40 0
2010-07-13 Multi-Stage Fracture 3435.60 3436.40 0
2010-07-13 Multi-Stage Fracture 3278.00 3278.80 0
2010-07-14 Multi-Stage Fracture 3133.40 3134.20 0
2010-07-14 Multi-Stage Fracture 2982.20 2983.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2770 0.0 0.0 0.0
2011 8330 0.0 0.0 0.0
2012 7311 0.0 0.0 0.0
2013 8712 0.0 0.0 0.0
2014 7771 0.0 0.0 0.0
2015 4594 0.0 0.0 0.0
2016 5081 0.0 0.0 0.0
2017 4539 0.0 0.0 0.0
2018 7361 0.0 0.0 0.0
2019 8423 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

References