X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776131907000

Well Details

Well ID: 0776131907000
Loading map...
Location: 00/07-19-077-13W6/0
Location Alias: 00/07-19-77-13 W6M
Location Alias 2: 00/07-19-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 19
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ PCOUPES 7-19-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0466716
License Date: 2014-05-21
License Status: Issued
Spud Date: 2014-07-17
Final Drill Date: 2014-08-04
Well Total Depth: 4410.00 m
Surface Hole Latitude: 55.676553
Surface Hole Longitude: -119.971119

For data sources see[1][2]

Well History

Date Event
2014-05-21 Obtained License
2014-07-19 Surface Casing Operation Performed
2014-07-23 Direction Drilling Operation Performed - Deviate
2014-07-29 Direction Drilling Operation Performed - Horizontal
2014-08-04 Finished Drilling
2014-08-04 Well Log Performed
2014-08-04 Well Mode changed to Drilled and Cased
2014-08-05 Liner Casing Operation Performed
2014-08-05 Production Casing Operation Performed
2014-08-07 Rig Released
2014-09-01 Well Fluid changed to Gas
2014-09-01 Well Mode changed to Testing
2014-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2014-09-24 Perforation Treatment Performed - Open-Hole Completion
2014-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2014-09-30 Well Began Production
2014-09-30 Well Fluid changed to Gas
2014-09-30 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-07-17 Canelson Drilling Inc. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-07-23 2000.00 Deviate (5 - 79 degrees)
2014-07-29 2564.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-09-24 Open Hole/Barefoot Completion 4405.00 4410.00 0
2014-09-25 Multi-Stage Fracture 3407.80 3408.60 0
2014-09-25 Multi-Stage Fracture 3282.00 3282.80 0
2014-09-25 Multi-Stage Fracture 3141.60 3142.40 0
2014-09-25 Multi-Stage Fracture 3014.80 3015.60 0
2014-09-25 Multi-Stage Fracture 2888.10 2888.90 0
2014-09-25 Multi-Stage Fracture 2747.80 2748.60 0
2014-09-25 Multi-Stage Fracture 2621.00 2621.80 0
2014-09-24 Multi-Stage Fracture 4393.70 4394.50 0
2014-09-24 Multi-Stage Fracture 4327.80 4328.60 0
2014-09-24 Multi-Stage Fracture 4187.60 4188.40 0
2014-09-24 Multi-Stage Fracture 4066.60 4067.40 0
2014-09-24 Multi-Stage Fracture 3926.40 3927.20 0
2014-09-24 Multi-Stage Fracture 3799.80 3800.60 0
2014-09-24 Multi-Stage Fracture 3674.00 3674.80 0
2014-09-25 Multi-Stage Fracture 3533.90 3534.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-09-24 2014-09-24 2,448 0 N/A
2 2014-09-24 2014-09-25 2,448 6,413 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 1.0799 N/A
AI-7NR Trican Corrosion Inhibitor modified propargyl alcohol Trade Secret 100 0.004 N/A
propargyl alcohol 107-19-7 100 0.004 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0001 N/A
IC-2 Trican Iron Control sodium erythorbate 6381-77-7 100 0.006 N/A
ASA-60 Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.0109 N/A
dipropylene glycol 25265-71-8 100 0.0109 N/A
sodium hexyldiphenyl ether sulfonate 147732-60-3 100 0.0109 N/A
2 N2 7727-37-9 100 2.8038 N/A
potassium chloride 7447-40-7 100 82.0488 N/A
water Not Available 100 77.5798 N/A
Pearl RCS 30/50 Trican polyurethane resin Trade Secret 100 1.8901 N/A
silica crystalline 14808-60-7 100 1.8901 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 8.5067 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 4.2001 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0251 N/A
dibromoacetonitrile 3252-43-5 100 0.0251 N/A
non-hazardous ingredients Not Available 100 0.0251 N/A
polyethylene glycol 25322-68-3 100 0.0251 N/A
sodium bromide 7647-15-6 100 0.0251 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0066 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0038 N/A
DRA-2 Trican Buffer non-hazardous ingredients Not Available 100 0.0897 N/A
pH-6 Trican Buffer formic acid 64-18-6 100 0.0444 N/A
water Not Available 100 0.0444 N/A
FE-2 Trican Conductivity Enhancer methanol 67-56-1 100 0.0708 N/A
non-hazardous ingredients Not Available 100 0.0708 N/A
polyethylene glycol monobutyl ether 9004-77-7 100 0.0708 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.0959 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0959 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1611 N/A
WG-111L Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.2969 N/A
polysaccharide blend Not Available 100 0.2969 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.1189 N/A
aminofunctional polymer 8985 100 0.1189 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.1189 N/A
isopropanol 67-63-0 100 0.1189 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-09-11 2014-09-12 Recycled Fracturing Water (treated at well site) 74
2014-09-03 2014-09-26 Recycled Fracturing Water (treated at independent stand-alone facility) 236
2014-09-21 2014-09-24 Groundwater - Saline 121
2014-08-22 2014-09-27 Surface Water - Runoff 1921
2014-08-31 2014-09-30 Surface Water - Runoff 3735
2014-08-31 2014-09-30 Surface Water - Runoff 1110
2014-09-01 2014-09-15 Recycled Fracturing Water (treated at well site) 2971

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1700 0.0 0.0 0.0
2015 8348 0.0 0.0 0.0
2016 8468 0.0 0.0 0.0
2017 6395 0.0 0.0 0.0
2018 7758 0.0 0.0 0.0
2019 8560 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-08-07 No Incident Encountered 0.00 0.00
2014-10-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References