If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776123213020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.710166,"lon":-119.808463,"icon":""}]} |
Location: 02/13-32-077-12W6/0 | |
Location Alias: 02/13-32-77-12 W6M | |
Location Alias 2: 02/13-32-077-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 12 | |
Section: 32 | |
County/Municipality: Saddle Hills County | |
Well Name: BIRCHCLIFF 02 HZ PCOUPES 13-32-77-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0439439 | |
License Date: 2011-11-23 | |
License Status: Issued | |
Spud Date: 2012-02-05 | |
Final Drill Date: 2012-02-22 | |
Well Total Depth: 4420.00 m | |
Surface Hole Latitude: 55.710166 | |
Surface Hole Longitude: -119.808463 |
Date | Event |
---|---|
2011-11-23 | Obtained License |
2012-02-06 | Surface Casing Operation Performed |
2012-02-09 | Well Log Performed |
2012-02-10 | Direction Drilling Operation Performed - Horizontal |
2012-02-21 | Well Log Performed |
2012-02-22 | Finished Drilling |
2012-02-22 | Well Mode changed to Drilled and Cased |
2012-02-23 | Liner Casing Operation Performed |
2012-02-23 | Production Casing Operation Performed |
2012-02-24 | Rig Released |
2012-03-03 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-06 | Well Log Performed |
2012-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-21 | Well Fluid changed to Gas |
2012-03-21 | Well Mode changed to Testing |
2012-03-22 | Well Log Performed |
2012-06-17 | Well Began Production |
2012-06-17 | Well Fluid changed to Gas |
2012-06-17 | Well Mode changed to Flowing |
2018-01-08 | Well Fluid changed to Gas |
2018-01-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-05 | Calmena Energy Services Operating Corp. | 211 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-10 | 2027.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-03 | Open Hole/Barefoot Completion | 4417.30 | 4420.00 | 0 |
2012-03-16 | Multi-Stage Fracture | 3369.90 | 3370.70 | 0 |
2012-03-17 | Multi-Stage Fracture | 3241.60 | 3242.40 | 0 |
2012-03-17 | Multi-Stage Fracture | 3112.60 | 3113.40 | 0 |
2012-03-17 | Multi-Stage Fracture | 2983.60 | 2984.40 | 0 |
2012-03-17 | Multi-Stage Fracture | 2854.60 | 2855.40 | 0 |
2012-03-18 | Multi-Stage Fracture | 2754.00 | 2754.80 | 0 |
2012-03-15 | Multi-Stage Fracture | 4408.00 | 4408.80 | 0 |
2012-03-15 | Multi-Stage Fracture | 4272.10 | 4272.90 | 0 |
2012-03-15 | Multi-Stage Fracture | 4143.10 | 4143.90 | 0 |
2012-03-16 | Multi-Stage Fracture | 4014.10 | 4014.90 | 0 |
2012-03-16 | Multi-Stage Fracture | 3885.90 | 3886.70 | 0 |
2012-03-16 | Multi-Stage Fracture | 3757.00 | 3757.80 | 0 |
2012-03-16 | Multi-Stage Fracture | 3627.90 | 3628.70 | 0 |
2012-03-16 | Multi-Stage Fracture | 3498.80 | 3499.60 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4712 | 0.0 | 0.0 | 0.0 |
2013 | 8151 | 0.0 | 0.0 | 0.0 |
2014 | 8596 | 0.0 | 0.0 | 0.0 |
2015 | 6629 | 0.0 | 0.0 | 0.0 |
2016 | 8240 | 0.0 | 0.0 | 0.0 |
2017 | 5274 | 0.0 | 0.0 | 0.0 |
2018 | 4257 | 0.0 | 0.0 | 0.0 |
2019 | 8719 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]