X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776123213020

Well Details

Well ID: 0776123213020
Loading map...
Location: 02/13-32-077-12W6/0
Location Alias: 02/13-32-77-12 W6M
Location Alias 2: 02/13-32-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 32
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF 02 HZ PCOUPES 13-32-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0439439
License Date: 2011-11-23
License Status: Issued
Spud Date: 2012-02-05
Final Drill Date: 2012-02-22
Well Total Depth: 4420.00 m
Surface Hole Latitude: 55.710166
Surface Hole Longitude: -119.808463

For data sources see[1][2]

Well History

Date Event
2011-11-23 Obtained License
2012-02-06 Surface Casing Operation Performed
2012-02-09 Well Log Performed
2012-02-10 Direction Drilling Operation Performed - Horizontal
2012-02-21 Well Log Performed
2012-02-22 Finished Drilling
2012-02-22 Well Mode changed to Drilled and Cased
2012-02-23 Liner Casing Operation Performed
2012-02-23 Production Casing Operation Performed
2012-02-24 Rig Released
2012-03-03 Perforation Treatment Performed - Open-Hole Completion
2012-03-06 Well Log Performed
2012-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-21 Well Fluid changed to Gas
2012-03-21 Well Mode changed to Testing
2012-03-22 Well Log Performed
2012-06-17 Well Began Production
2012-06-17 Well Fluid changed to Gas
2012-06-17 Well Mode changed to Flowing
2018-01-08 Well Fluid changed to Gas
2018-01-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-05 Calmena Energy Services Operating Corp. 211 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-10 2027.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-03 Open Hole/Barefoot Completion 4417.30 4420.00 0
2012-03-16 Multi-Stage Fracture 3369.90 3370.70 0
2012-03-17 Multi-Stage Fracture 3241.60 3242.40 0
2012-03-17 Multi-Stage Fracture 3112.60 3113.40 0
2012-03-17 Multi-Stage Fracture 2983.60 2984.40 0
2012-03-17 Multi-Stage Fracture 2854.60 2855.40 0
2012-03-18 Multi-Stage Fracture 2754.00 2754.80 0
2012-03-15 Multi-Stage Fracture 4408.00 4408.80 0
2012-03-15 Multi-Stage Fracture 4272.10 4272.90 0
2012-03-15 Multi-Stage Fracture 4143.10 4143.90 0
2012-03-16 Multi-Stage Fracture 4014.10 4014.90 0
2012-03-16 Multi-Stage Fracture 3885.90 3886.70 0
2012-03-16 Multi-Stage Fracture 3757.00 3757.80 0
2012-03-16 Multi-Stage Fracture 3627.90 3628.70 0
2012-03-16 Multi-Stage Fracture 3498.80 3499.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4712 0.0 0.0 0.0
2013 8151 0.0 0.0 0.0
2014 8596 0.0 0.0 0.0
2015 6629 0.0 0.0 0.0
2016 8240 0.0 0.0 0.0
2017 5274 0.0 0.0 0.0
2018 4257 0.0 0.0 0.0
2019 8719 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-25 No Incident Encountered 0.00 0.00

For data sources see[8]

References