If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776123013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.698902,"lon":-119.833505,"icon":""}]} |
Location: 00/13-30-077-12W6/0 | |
Location Alias: 00/13-30-77-12 W6M | |
Location Alias 2: 00/13-30-077-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 12 | |
Section: 30 | |
County/Municipality: Saddle Hills County | |
Well Name: BIRCHCLIFF PCOUPES 13-30-77-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0430774 | |
License Date: 2011-01-27 | |
License Status: Issued | |
Spud Date: 2011-02-11 | |
Final Drill Date: 2011-02-27 | |
Well Total Depth: 4033.00 m | |
Surface Hole Latitude: 55.698902 | |
Surface Hole Longitude: -119.833505 |
Date | Event |
---|---|
2011-01-27 | Obtained License |
2011-02-13 | Surface Casing Operation Performed |
2011-02-18 | Direction Drilling Operation Performed - Horizontal |
2011-02-27 | Finished Drilling |
2011-02-27 | Well Log Performed |
2011-02-27 | Well Mode changed to Drilled and Cased |
2011-03-02 | Liner Casing Operation Performed |
2011-03-02 | Production Casing Operation Performed |
2011-03-03 | Rig Released |
2011-03-15 | Perforation Treatment Performed - Jet Perforation |
2011-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-16 | Perforation Treatment Performed - Jet Perforation |
2011-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-17 | Perforation Treatment Performed - Jet Perforation |
2011-03-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-18 | Perforation Treatment Performed - Jet Perforation |
2011-03-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-19 | Perforation Treatment Performed - Jet Perforation |
2011-03-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-23 | Well Fluid changed to Gas |
2011-03-23 | Well Mode changed to Testing |
2011-04-09 | Well Began Production |
2011-04-09 | Well Fluid changed to Gas |
2011-04-09 | Well Mode changed to Flowing |
2018-02-01 | Well Fluid changed to Gas |
2018-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-18 | 2129.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-15 | Perforation | 4019.70 | 4020.50 | 6 |
2011-03-17 | Multi-Stage Fracture | 3528.10 | 3528.90 | 0 |
2011-03-17 | Perforation | 3402.40 | 3403.20 | 6 |
2011-03-17 | Multi-Stage Fracture | 3402.40 | 3403.20 | 0 |
2011-03-17 | Perforation | 3278.60 | 3279.40 | 6 |
2011-03-17 | Multi-Stage Fracture | 3278.60 | 3279.40 | 0 |
2011-03-17 | Perforation | 3153.30 | 3154.10 | 6 |
2011-03-17 | Multi-Stage Fracture | 3153.30 | 3154.10 | 0 |
2011-03-18 | Perforation | 3028.50 | 3029.30 | 6 |
2011-03-18 | Multi-Stage Fracture | 3028.50 | 3029.30 | 0 |
2011-03-18 | Perforation | 2903.30 | 2904.10 | 6 |
2011-03-15 | Multi-Stage Fracture | 4019.70 | 4020.50 | 0 |
2011-03-18 | Multi-Stage Fracture | 2903.30 | 2904.10 | 0 |
2011-03-18 | Perforation | 2778.80 | 2779.60 | 6 |
2011-03-18 | Multi-Stage Fracture | 2778.80 | 2779.60 | 0 |
2011-03-18 | Perforation | 2653.00 | 2653.80 | 6 |
2011-03-18 | Multi-Stage Fracture | 2653.00 | 2653.80 | 0 |
2011-03-19 | Perforation | 2554.20 | 2555.00 | 6 |
2011-03-19 | Multi-Stage Fracture | 2554.20 | 2555.00 | 0 |
2011-03-15 | Perforation | 3903.20 | 3904.00 | 6 |
2011-03-15 | Multi-Stage Fracture | 3903.20 | 3904.00 | 0 |
2011-03-16 | Perforation | 3777.80 | 3778.60 | 6 |
2011-03-16 | Multi-Stage Fracture | 3777.80 | 3778.60 | 0 |
2011-03-16 | Perforation | 3653.00 | 3653.80 | 6 |
2011-03-16 | Multi-Stage Fracture | 3653.00 | 3653.80 | 0 |
2011-03-17 | Perforation | 3528.10 | 3528.90 | 6 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6296 | 0.0 | 0.0 | 0.0 |
2012 | 8672 | 0.0 | 0.0 | 0.0 |
2013 | 8275 | 0.0 | 0.0 | 0.0 |
2014 | 8617 | 0.0 | 0.0 | 0.0 |
2015 | 7567 | 0.0 | 0.0 | 0.0 |
2016 | 8467 | 0.0 | 0.0 | 0.0 |
2017 | 4887 | 0.0 | 0.0 | 0.0 |
2018 | 7046 | 0.0 | 0.0 | 0.0 |
2019 | 8184 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]