X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776122213030

Well Details

Well ID: 0776122213030
Loading map...
Location: 03/13-22-077-12W6/0
Location Alias: 03/13-22-77-12 W6M
Location Alias 2: 03/13-22-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 22
County/Municipality: Saddle Hills County
Well Name: BIR 16-15 HZ 103 PCOUPES 13-22-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0485313
License Date: 2017-09-08
License Status: Issued
Spud Date: 2017-09-25
Final Drill Date: 2017-10-03
Well Total Depth: 4296.00 m
Surface Hole Latitude: 55.679312
Surface Hole Longitude: -119.763406

For data sources see[1][2]

Well History

Date Event
2017-09-08 Obtained License
2017-09-26 Direction Drilling Operation Performed - Deviate
2017-09-26 Surface Casing Operation Performed
2017-09-30 Direction Drilling Operation Performed - Horizontal
2017-09-30 Well Log Performed
2017-10-03 Finished Drilling
2017-10-03 Well Log Performed
2017-10-03 Well Mode changed to Drilled and Cased
2017-10-04 Production Casing Operation Performed
2017-10-04 Well Log Performed
2017-10-05 Rig Released
2017-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-11 Perforation Treatment Performed - Open-Hole Completion
2017-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-29 Well Began Production
2017-11-29 Well Fluid changed to Gas
2017-11-29 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-25 Ensign Drilling Inc. 555 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-09-26 686.80 Deviate (5 - 79 degrees)
2017-09-30 2572.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-11-11 Open Hole/Barefoot Completion 4286.00 4296.00 0
2017-11-11 Multi-Stage Fracture 3885.60 3886.50 0
2017-11-11 Multi-Stage Fracture 3831.30 3832.20 0
2017-11-11 Multi-Stage Fracture 3789.30 3890.20 0
2017-11-11 Multi-Stage Fracture 3736.00 3736.90 0
2017-11-12 Multi-Stage Fracture 3681.30 3682.20 0
2017-11-12 Multi-Stage Fracture 3640.10 3641.00 0
2017-11-12 Multi-Stage Fracture 3586.30 3587.20 0
2017-11-12 Multi-Stage Fracture 3531.70 3532.60 0
2017-11-12 Multi-Stage Fracture 3477.60 3478.50 0
2017-11-12 Multi-Stage Fracture 3436.10 3437.00 0
2017-11-11 Multi-Stage Fracture 4274.70 4275.90 0
2017-11-12 Multi-Stage Fracture 3381.40 3382.30 0
2017-11-12 Multi-Stage Fracture 3328.00 3328.90 0
2017-11-12 Multi-Stage Fracture 3285.30 3286.20 0
2017-11-12 Multi-Stage Fracture 3229.50 3230.40 0
2017-11-12 Multi-Stage Fracture 3175.30 3176.20 0
2017-11-12 Multi-Stage Fracture 3134.20 3135.10 0
2017-11-12 Multi-Stage Fracture 3080.40 3081.30 0
2017-11-12 Multi-Stage Fracture 3028.60 3029.50 0
2017-11-12 Multi-Stage Fracture 2973.40 2974.30 0
2017-11-12 Multi-Stage Fracture 2932.70 2933.60 0
2017-11-11 Multi-Stage Fracture 4240.30 4241.20 0
2017-11-12 Multi-Stage Fracture 2877.20 2878.10 0
2017-11-12 Multi-Stage Fracture 2822.90 2823.80 0
2017-11-18 Multi-Stage Fracture 2781.00 2781.90 0
2017-11-18 Multi-Stage Fracture 2725.70 2726.60 0
2017-11-18 Multi-Stage Fracture 2677.90 2678.80 0
2017-11-18 Multi-Stage Fracture 2630.50 2631.40 0
2017-11-18 Multi-Stage Fracture 2594.30 2595.20 0
2017-11-11 Multi-Stage Fracture 4186.80 4187.70 0
2017-11-11 Multi-Stage Fracture 4144.70 4145.60 0
2017-11-11 Multi-Stage Fracture 4090.50 4091.40 0
2017-11-11 Multi-Stage Fracture 4036.60 4037.50 0
2017-11-11 Multi-Stage Fracture 3995.70 3996.60 0
2017-11-11 Multi-Stage Fracture 3940.80 3941.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-11-11 2017-11-18 2,273 11,087 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.5209 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.5652 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 4.1636 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0264 N/A
Methanol 67-56-1 100 0.0264 N/A
Water 7732-18-5 100 0.0264 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0038 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.0934 N/A
Non-hazardous Not Available 100 0.0934 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-13 2017-11-14 Surface Water - Runoff 10001
2017-09-29 2017-09-30 Surface Water - Runoff 35
2017-09-29 2017-11-13 Recycled Fracturing Water (treated at well site) 1060
2017-10-04 2017-10-24 Recycled Fracturing Water (treated at well site) 151

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 716 0.0 0.0 0.0
2018 8314 0.0 0.0 0.0
2019 8717 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-05 No Incident Encountered 0.00 0.00
2017-12-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References