If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776122213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.709712,"lon":-119.808444,"icon":""}]} |
Location: 00/13-22-077-12W6/0 | |
Location Alias: 00/13-22-77-12 W6M | |
Location Alias 2: 00/13-22-077-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 12 | |
Section: 22 | |
County/Municipality: Saddle Hills County | |
Well Name: BIRCHCLIFF HZ PCOUPES 13-22-77-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0473263 | |
License Date: 2014-12-16 | |
License Status: Amended | |
Spud Date: 2015-07-05 | |
Final Drill Date: 2015-07-19 | |
Well Total Depth: 4688.00 m | |
Surface Hole Latitude: 55.709712 | |
Surface Hole Longitude: -119.808444 |
Date | Event |
---|---|
2014-12-16 | Obtained License |
2015-07-06 | Surface Casing Operation Performed |
2015-07-07 | Direction Drilling Operation Performed - Deviate |
2015-07-15 | Direction Drilling Operation Performed - Horizontal |
2015-07-19 | Finished Drilling |
2015-07-19 | Well Mode changed to Drilled and Cased |
2015-07-20 | Well Log Performed |
2015-07-22 | Liner Casing Operation Performed |
2015-07-22 | Production Casing Operation Performed |
2015-07-23 | Rig Released |
2015-08-15 | Well Fluid changed to Gas |
2015-08-15 | Well Mode changed to Testing |
2015-08-16 | Well Log Performed |
2015-08-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-08-24 | Perforation Treatment Performed - Open-Hole Completion |
2015-08-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-08-28 | Well Began Production |
2015-08-28 | Well Fluid changed to Gas |
2015-08-28 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-07-04 | Canelson Drilling Inc. | 39 | N/A | Set Surface |
2015-07-08 | Canelson Drilling Inc. | 39 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-07-07 | 680.80 | Deviate (5 - 79 degrees) |
2015-07-15 | 2501.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-08-24 | Open Hole/Barefoot Completion | 4670.30 | 4688.00 | 0 |
2015-08-24 | Multi-Stage Fracture | 3684.00 | 3684.80 | 0 |
2015-08-24 | Multi-Stage Fracture | 3557.30 | 3558.10 | 0 |
2015-08-24 | Multi-Stage Fracture | 3417.20 | 3418.00 | 0 |
2015-08-24 | Multi-Stage Fracture | 3292.20 | 3293.00 | 0 |
2015-08-24 | Multi-Stage Fracture | 3165.50 | 3166.30 | 0 |
2015-08-24 | Multi-Stage Fracture | 3026.60 | 3027.40 | 0 |
2015-08-26 | Multi-Stage Fracture | 2901.20 | 2902.00 | 0 |
2015-08-26 | Multi-Stage Fracture | 2762.40 | 2763.20 | 0 |
2015-08-26 | Multi-Stage Fracture | 2637.00 | 2637.80 | 0 |
2015-08-24 | Multi-Stage Fracture | 4665.30 | 4666.10 | 0 |
2015-08-24 | Multi-Stage Fracture | 4593.00 | 4593.80 | 0 |
2015-08-24 | Multi-Stage Fracture | 4469.20 | 4470.00 | 0 |
2015-08-24 | Multi-Stage Fracture | 4342.50 | 4343.30 | 0 |
2015-08-24 | Multi-Stage Fracture | 4202.20 | 4203.00 | 0 |
2015-08-24 | Multi-Stage Fracture | 4075.70 | 4076.50 | 0 |
2015-08-24 | Multi-Stage Fracture | 3949.20 | 3950.00 | 0 |
2015-08-24 | Multi-Stage Fracture | 3808.80 | 3809.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-08-24 | 2015-08-24 | 2,341 | 0 | N/A |
2 | 2015-08-24 | 2015-08-26 | 2,341 | 6,665 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 7.4657 | N/A | |||
2 | potassium chloride | 7447-40-7 | 100 | 83.6876 | N/A | |||
water | Not Available | 100 | 83.6876 | N/A | ||||
Pearl RCS 30/50 | Trican | polyurethane resin | Trade Secret | 100 | 2.3387 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 2.3387 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 8.6969 | N/A | ||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 4.792 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0206 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0206 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0206 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0206 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0206 | N/A | ||||
GFR-3D | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.0248 | N/A | |
sodium chloride | 7647-14-5 | 100 | 0.0248 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-08-23 | 2015-08-24 | Recycled Fracturing Water (treated at well site) | 1730 |
2015-08-20 | 2015-08-23 | Groundwater - Saline | 350 |
2015-08-13 | 2015-08-23 | Recycled Fracturing Water (treated at well site) | 586 |
2015-08-02 | 2015-08-07 | Surface Water - Runoff | 2340 |
2015-08-12 | 2015-08-24 | Surface Water - Runoff | 1659 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 2383 | 0.0 | 0.0 | 0.0 |
2016 | 8386 | 0.0 | 0.0 | 0.0 |
2017 | 7949 | 0.0 | 0.0 | 0.0 |
2018 | 8228 | 0.0 | 0.0 | 0.0 |
2019 | 8677 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-07-23 | No Incident Encountered | 0.00 | 0.00 |
2015-09-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]