X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776121308030

Well Details

Well ID: 0776121308030
Loading map...
Location: 03/08-13-077-12W6/0
Location Alias: 03/08-13-77-12 W6M
Location Alias 2: 03/08-13-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 13
County/Municipality: Saddle Hills County
Well Name: BIR 9-23 HZ 103 PCOUPES 8-13-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0490869
License Date: 2018-09-10
License Status: Issued
Spud Date: 2018-10-29
Final Drill Date: 2018-11-08
Well Total Depth: 4260.00 m
Surface Hole Latitude: 55.686896
Surface Hole Longitude: -119.735559

For data sources see[1][2]

Well History

Date Event
2018-09-10 Obtained License
2018-10-29 Surface Casing Operation Performed
2018-10-31 Direction Drilling Operation Performed - Deviate
2018-11-05 Well Log Performed
2018-11-06 Direction Drilling Operation Performed - Horizontal
2018-11-08 Finished Drilling
2018-11-08 Well Log Performed
2018-11-08 Well Mode changed to Drilled and Cased
2018-11-09 Production Casing Operation Performed
2018-11-09 Well Log Performed
2018-11-10 Rig Released
2019-01-01 Well Fluid changed to Gas
2019-01-01 Well Mode changed to Testing
2019-01-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-03 Perforation Treatment Performed - Open-Hole Completion
2019-01-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-12 Well Began Production
2019-01-12 Well Fluid changed to Gas
2019-01-12 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-10-29 Ensign Drilling Inc. 555 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-10-31 911.70 Deviate (5 - 79 degrees)
2018-11-06 2640.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-03 Open Hole/Barefoot Completion 4255.00 4260.00 0
2019-01-03 Multi-Stage Fracture 3818.00 3818.90 0
2019-01-03 Multi-Stage Fracture 3770.30 3771.20 0
2019-01-03 Multi-Stage Fracture 3711.00 3711.90 0
2019-01-04 Multi-Stage Fracture 3663.20 3664.10 0
2019-01-04 Multi-Stage Fracture 3615.60 3616.50 0
2019-01-04 Multi-Stage Fracture 3567.80 3568.70 0
2019-01-04 Multi-Stage Fracture 3508.40 3509.30 0
2019-01-04 Multi-Stage Fracture 3460.70 3461.60 0
2019-01-04 Multi-Stage Fracture 3413.00 3413.90 0
2019-01-04 Multi-Stage Fracture 3365.30 3366.20 0
2019-01-03 Multi-Stage Fracture 4213.70 4215.00 0
2019-01-04 Multi-Stage Fracture 3317.60 3318.50 0
2019-01-05 Multi-Stage Fracture 3258.40 3259.30 0
2019-01-05 Multi-Stage Fracture 3210.50 3211.40 0
2019-01-05 Multi-Stage Fracture 3163.10 3164.00 0
2019-01-05 Multi-Stage Fracture 3115.20 3116.10 0
2019-01-05 Multi-Stage Fracture 3056.00 3056.90 0
2019-01-05 Multi-Stage Fracture 3008.30 3009.20 0
2019-01-05 Multi-Stage Fracture 2960.50 2961.40 0
2019-01-05 Multi-Stage Fracture 2912.90 2913.80 0
2019-01-05 Multi-Stage Fracture 2865.20 2866.10 0
2019-01-03 Multi-Stage Fracture 4164.00 4164.90 0
2019-01-06 Multi-Stage Fracture 2806.10 2807.00 0
2019-01-06 Multi-Stage Fracture 2758.10 2759.00 0
2019-01-06 Multi-Stage Fracture 2710.10 2711.00 0
2019-01-06 Multi-Stage Fracture 2662.50 2663.40 0
2019-01-06 Multi-Stage Fracture 2603.10 2604.00 0
2019-01-06 Multi-Stage Fracture 2566.90 2567.80 0
2019-01-03 Multi-Stage Fracture 4116.20 4117.10 0
2019-01-03 Multi-Stage Fracture 4068.40 4069.30 0
2019-01-03 Multi-Stage Fracture 4020.60 4021.50 0
2019-01-03 Multi-Stage Fracture 3961.30 3962.20 0
2019-01-03 Multi-Stage Fracture 3913.40 3914.30 0
2019-01-03 Multi-Stage Fracture 3865.70 3866.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-03 2019-01-06 2,271 9,162 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.8846 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.1418 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.775 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.011 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.011 N/A
Non-Hazardous Ingredients Trade Secret 100 0.011 N/A
Polyethylene glycol 25322-68-3 100 0.011 N/A
Sodium bromide 7647-15-6 100 0.011 N/A
DWP-641. Friction Reducer Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0715 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0715 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0715 N/A
NanoClear TenEx Technologies Surfactant Surfactants and other additives Trade Secret 100 0.1159 N/A
Water 7732-18-5 100 0.1159 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 8414 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-10 No Incident Encountered 0.00 0.00
2019-01-12 No Incident Encountered 0.00 0.00

For data sources see[9]

References