X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776121012020

Well Details

Well ID: 0776121012020
Loading map...
Location: 02/12-10-077-12W6/0
Location Alias: 02/12-10-77-12 W6M
Location Alias 2: 02/12-10-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 10
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ 02 PCOUPES 12-10-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0430922
License Date: 2011-01-28
License Status: Issued
Spud Date: 2011-02-22
Final Drill Date: 2011-03-07
Well Total Depth: 3680.00 m
Surface Hole Latitude: 55.648538
Surface Hole Longitude: -119.759899

For data sources see[1][2]

Well History

Date Event
2011-01-28 Obtained License
2011-02-22 Well Log Performed
2011-02-24 Surface Casing Operation Performed
2011-03-01 Direction Drilling Operation Performed - Horizontal
2011-03-01 Well Log Performed
2011-03-03 Well Log Performed
2011-03-07 Finished Drilling
2011-03-07 Well Log Performed
2011-03-07 Well Mode changed to Drilled and Cased
2011-03-09 Liner Casing Operation Performed
2011-03-09 Production Casing Operation Performed
2011-03-09 Rig Released
2011-03-22 Well Log Performed
2011-04-06 Perforation Treatment Performed - Jet Perforation
2011-04-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-07 Perforation Treatment Performed - Jet Perforation
2011-04-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-08 Perforation Treatment Performed - Jet Perforation
2011-04-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-09 Perforation Treatment Performed - Jet Perforation
2011-04-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-15 Well Fluid changed to Gas
2011-04-15 Well Mode changed to Testing
2011-05-01 Well Began Production
2011-05-01 Well Fluid changed to Gas
2011-05-01 Well Mode changed to Flowing
2017-07-01 Well Fluid changed to Gas
2017-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-01 1905.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-04-06 Perforation 3666.70 3667.50 6
2011-04-07 Multi-Stage Fracture 3187.00 3187.80 0
2011-04-08 Perforation 3056.10 3056.90 6
2011-04-08 Multi-Stage Fracture 3056.10 3056.90 0
2011-04-08 Perforation 2937.30 2938.10 6
2011-04-08 Multi-Stage Fracture 2937.30 2938.10 0
2011-04-08 Perforation 2819.30 2820.10 6
2011-04-08 Multi-Stage Fracture 2819.30 2820.10 0
2011-04-08 Perforation 2688.60 2689.40 6
2011-04-08 Multi-Stage Fracture 2688.60 2689.40 0
2011-04-09 Perforation 2570.40 2571.20 6
2011-04-06 Multi-Stage Fracture 3666.70 3667.50 0
2011-04-09 Multi-Stage Fracture 2570.40 2571.20 0
2011-04-09 Perforation 2452.30 2453.10 6
2011-04-09 Multi-Stage Fracture 2452.30 2453.10 0
2011-04-09 Perforation 2334.30 2335.10 6
2011-04-09 Multi-Stage Fracture 2334.30 2335.10 0
2011-04-06 Perforation 3554.20 3555.00 6
2011-04-06 Multi-Stage Fracture 3554.20 3555.00 0
2011-04-07 Perforation 3423.80 3424.60 6
2011-04-07 Multi-Stage Fracture 3423.80 3424.60 0
2011-04-07 Perforation 3305.30 3306.10 6
2011-04-07 Multi-Stage Fracture 3305.30 3306.10 0
2011-04-07 Perforation 3187.00 3187.80 6

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5795 0.0 0.0 0.0
2012 8606 0.0 0.0 0.0
2013 8676 0.0 0.0 0.0
2014 8484 0.0 0.0 0.0
2015 7195 0.0 0.0 0.0
2016 6617 0.0 0.0 0.0
2017 7791 0.0 0.0 0.0
2018 8648 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[6]

References