X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776120208020

Well Details

Well ID: 0776120208020
Loading map...
Location: 02/08-02-077-12W6/0
Location Alias: 02/08-02-77-12 W6M
Location Alias 2: 02/08-02-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 02
County/Municipality: Saddle Hills County
Well Name: BIR 4-11 HZ PCOUPES 8-2-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0481702
License Date: 2016-12-02
License Status: Issued
Spud Date: 2017-01-08
Final Drill Date: 2017-01-20
Well Total Depth: 4278.00 m
Surface Hole Latitude: 55.651695
Surface Hole Longitude: -119.756304

For data sources see[1][2]

Well History

Date Event
2016-12-02 Obtained License
2017-01-08 Lost Circulation Occurred
2017-01-09 Surface Casing Operation Performed
2017-01-11 Direction Drilling Operation Performed - Deviate
2017-01-16 Direction Drilling Operation Performed - Horizontal
2017-01-20 Finished Drilling
2017-01-20 Well Log Performed
2017-01-20 Well Mode changed to Drilled and Cased
2017-01-21 Production Casing Operation Performed
2017-01-22 Rig Released
2017-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-25 Perforation Treatment Performed - Open-Hole Completion
2017-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-01 Well Fluid changed to Gas
2017-04-01 Well Mode changed to Testing
2017-04-02 Well Began Production
2017-04-02 Well Fluid changed to Gas
2017-04-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-08 Trinidad Drilling Ltd. 438 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-11 724.80 Deviate (5 - 79 degrees)
2017-01-16 2513.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-25 Open Hole/Barefoot Completion 4274.00 4278.00 0
2017-03-26 Multi-Stage Fracture 3824.70 3825.50 0
2017-03-26 Multi-Stage Fracture 3759.50 3760.30 0
2017-03-26 Multi-Stage Fracture 3707.00 3707.80 0
2017-03-26 Multi-Stage Fracture 3641.90 3642.70 0
2017-03-26 Multi-Stage Fracture 3589.40 3590.20 0
2017-03-26 Multi-Stage Fracture 3536.80 3537.60 0
2017-03-26 Multi-Stage Fracture 3471.70 3472.50 0
2017-03-26 Multi-Stage Fracture 3419.20 3420.00 0
2017-03-26 Multi-Stage Fracture 3366.70 3367.50 0
2017-03-26 Multi-Stage Fracture 3301.70 3302.50 0
2017-03-25 Multi-Stage Fracture 4262.50 4263.80 0
2017-03-27 Multi-Stage Fracture 3249.40 3250.20 0
2017-03-27 Multi-Stage Fracture 3196.90 3197.70 0
2017-03-27 Multi-Stage Fracture 3131.80 3132.60 0
2017-03-27 Multi-Stage Fracture 3079.40 3080.20 0
2017-03-27 Multi-Stage Fracture 3014.30 3015.10 0
2017-03-27 Multi-Stage Fracture 2961.70 2962.50 0
2017-03-27 Multi-Stage Fracture 2909.60 2910.40 0
2017-03-27 Multi-Stage Fracture 2844.50 2845.30 0
2017-03-27 Multi-Stage Fracture 2792.10 2792.90 0
2017-03-27 Multi-Stage Fracture 2739.60 2740.40 0
2017-03-25 Multi-Stage Fracture 4217.00 4217.80 0
2017-03-27 Multi-Stage Fracture 2674.50 2675.30 0
2017-03-27 Multi-Stage Fracture 2622.00 2622.80 0
2017-03-27 Multi-Stage Fracture 2569.50 2570.30 0
2017-03-27 Multi-Stage Fracture 2529.60 2530.40 0
2017-03-26 Multi-Stage Fracture 4164.60 4165.40 0
2017-03-26 Multi-Stage Fracture 4099.60 4100.40 0
2017-03-26 Multi-Stage Fracture 4047.20 4048.00 0
2017-03-26 Multi-Stage Fracture 3994.70 3995.50 0
2017-03-26 Multi-Stage Fracture 3929.60 3930.40 0
2017-03-26 Multi-Stage Fracture 3877.20 3878.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-03-25 2017-03-27 2,380 11,420 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 83.5776 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 10.2263 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 6.0573 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0081 N/A
Dibromoacetonitrile 3252-43-5 100 0.0081 N/A
Polyethylene Glycol 25322-68-3 100 0.0081 N/A
Sodium Bromide 7647-15-6 100 0.0081 N/A
Water 7732-18-5 100 0.0081 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0041 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.1036 N/A
Non-hazardous Not Available 100 0.1036 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-25 2017-01-28 Surface Water - Runoff 1076
2017-01-28 2017-01-29 Surface Water - Runoff 661
2017-01-30 2017-02-03 Surface Water - Runoff 1752
2017-02-03 2017-02-04 Surface Water - Runoff 293
2017-02-08 2017-03-16 Surface Water - Runoff 2907
2017-02-05 2017-02-08 Surface Water - Runoff 918
2017-03-08 2017-03-15 Surface Water - Runoff 2829
2017-03-05 2017-03-05 Surface Water - Runoff 86
2017-03-08 2017-03-24 Recycled Fracturing Water (treated at independent stand-alone facility) 649

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5303 0.0 0.0 0.0
2018 8626 0.0 0.0 0.0
2019 8613 0.0 0.0 0.0
2020 2170 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-08 Lost Circulation 1.00 97.00
2017-03-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References