If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776112310000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.689691,"lon":-119.59032,"icon":""}]} |
Location: 00/10-23-077-11W6/0 | |
Location Alias: 00/10-23-77-11 W6M | |
Location Alias 2: 00/10-23-077-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 11 | |
Section: 23 | |
County/Municipality: Saddle Hills County | |
Well Name: NCO PCOUPES 10-23-77-11 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0170853 | |
License Date: 1994-09-28 | |
License Status: Issued | |
Spud Date: 1994-11-26 | |
Final Drill Date: 1994-12-08 | |
Well Total Depth: 1969.00 m | |
Surface Hole Latitude: 55.689691 | |
Surface Hole Longitude: -119.590320 |
Date | Event |
---|---|
1994-09-28 | Obtained License |
1994-11-27 | Surface Casing Operation Performed |
1994-12-08 | Finished Drilling |
1994-12-08 | Well Mode changed to Drilled and Cased |
1994-12-10 | Well Log Performed |
1994-12-12 | Production Casing Operation Performed |
1994-12-12 | Rig Released |
1995-01-29 | Well Log Performed |
1995-01-30 | Well Log Performed |
1995-02-01 | Perforation Treatment Performed - Jet Perforation |
1995-02-04 | Perforation Treatment Performed - Fractured |
1995-02-11 | Well Log Performed |
1995-03-09 | Perforation Treatment Performed - Jet Perforation |
1995-03-13 | Perforation Treatment Performed - Fractured |
1995-03-20 | Perforation Treatment Performed - Cement Squeeze |
1995-11-19 | Well Began Production |
1995-11-19 | Well Fluid changed to Gas |
1995-11-19 | Well Mode changed to Flowing |
2000-06-01 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2000-06-01 | Well Fluid changed to Gas |
2000-06-01 | Well Log Performed |
2000-06-01 | Well Mode changed to Suspended |
2000-06-02 | Perforation Treatment Performed - Jet Perforation |
2000-06-02 | Well Log Performed |
2000-06-04 | Perforation Treatment Performed - Fractured |
2000-06-23 | Well Fluid changed to Gas |
2000-06-23 | Well Mode changed to Suspended |
2003-01-17 | Well Fluid changed to Gas |
2003-01-17 | Well Mode changed to Flowing |
2008-06-30 | Well Fluid changed to Gas |
2008-06-30 | Well Mode changed to Suspended |
2010-12-01 | Well Fluid changed to Gas |
2010-12-01 | Well Mode changed to Flowing |
2018-01-01 | Well Fluid changed to Gas |
2018-01-01 | Well Mode changed to Pumping |
2019-12-31 | Well Fluid changed to Gas |
2019-12-31 | Well Mode changed to Suspended |
2020-02-01 | Well Fluid changed to Gas |
2020-02-01 | Well Mode changed to Pumping |
2020-02-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-02-01 | Perforation | 1850.00 | 1853.00 | 20 |
2000-06-04 | Fracture | 1402.00 | 1405.00 | 0 |
2020-02-02 | Acid Treatment | 1402.00 | 1405.00 | 0 |
1995-02-01 | Perforation | 1858.00 | 1859.00 | 20 |
1995-02-01 | Perforation | 1860.00 | 1861.00 | 20 |
1995-02-04 | Fracture | 1850.00 | 1861.00 | 0 |
1995-03-09 | Perforation | 1545.00 | 1548.00 | 18 |
1995-03-13 | Fracture | 1545.00 | 1548.00 | 0 |
1995-03-20 | Cement Squeeze | 1545.00 | 1548.00 | 0 |
2000-06-01 | Bridge Plug, No Cement | 1433.00 | 1434.20 | 0 |
2000-06-02 | Perforation | 1402.00 | 1405.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 737 | 0.0 | 0.0 | 0.0 |
1996 | 6468 | 0.0 | 0.0 | 0.0 |
1997 | 5173 | 0.0 | 0.0 | 0.0 |
1998 | 7481 | 0.0 | 0.0 | 0.0 |
1999 | 4344 | 0.0 | 0.0 | 0.0 |
2000 | 2633 | 0.0 | 0.0 | 0.0 |
2003 | 7977 | 0.0 | 0.0 | 0.0 |
2004 | 6340 | 0.0 | 0.0 | 0.0 |
2005 | 8748 | 0.0 | 0.0 | 0.0 |
2006 | 5087 | 0.0 | 0.0 | 0.0 |
2007 | 1464 | 0.0 | 0.0 | 0.0 |
2010 | 600 | 0.0 | 0.0 | 0.0 |
2011 | 8543 | 0.0 | 0.0 | 0.0 |
2012 | 7904 | 0.0 | 0.0 | 0.0 |
2013 | 8471 | 0.0 | 0.0 | 0.0 |
2014 | 8231 | 0.0 | 0.0 | 0.0 |
2015 | 6776 | 0.0 | 0.0 | 0.0 |
2016 | 669 | 0.0 | 0.0 | 0.0 |
2017 | 6162 | 0.0 | 0.0 | 0.0 |
2018 | 8325 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
2020 | 1367 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-02-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]