Well ID: 0776102013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.680917,"lon":-119.508824,"icon":""}]} |
Location: 00/13-20-077-10W6/0 | |
Location Alias: 00/13-20-77-10 W6M | |
Location Alias 2: 00/13-20-077-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 10 | |
Section: 20 | |
County/Municipality: Saddle Hills County | |
Well Name: TQN ET AL HZ PCOUPES 13-20-77-10 | |
Operator Name: TAQA North Ltd. | |
License Number: 0423552 | |
License Date: 2010-09-16 | |
License Status: Issued | |
Spud Date: 2010-09-25 | |
Final Drill Date: 2010-10-12 | |
Well Total Depth: 3289.00 m | |
Surface Hole Latitude: 55.680917 | |
Surface Hole Longitude: -119.508824 |
Date | Event |
---|---|
2010-09-16 | Obtained License |
2010-09-27 | Surface Casing Operation Performed |
2010-10-02 | Direction Drilling Operation Performed - Horizontal |
2010-10-12 | Finished Drilling |
2010-10-12 | Well Mode changed to Drilled and Cased |
2010-10-14 | Production Casing Operation Performed |
2010-10-14 | Well Log Performed |
2010-11-01 | Well Fluid changed to Gas |
2010-11-01 | Well Log Performed |
2010-11-01 | Well Mode changed to Testing |
2010-11-10 | Perforation Treatment Performed - Jet Perforation |
2010-11-11 | Perforation Treatment Performed - Jet Perforation |
2010-11-12 | Perforation Treatment Performed - Jet Perforation |
2010-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-14 | Well Log Performed |
2010-11-16 | Rig Released |
2010-12-18 | Well Began Production |
2010-12-18 | Well Fluid changed to Gas |
2010-12-18 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-02 | 1625.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-10 | Perforation | 3200.30 | 3201.60 | 3 |
2010-11-10 | Perforation | 3067.10 | 3067.90 | 3 |
2010-11-10 | Perforation | 2933.20 | 2934.00 | 3 |
2010-11-10 | Perforation | 2800.40 | 2801.20 | 3 |
2010-11-11 | Perforation | 2667.70 | 2668.50 | 3 |
2010-11-11 | Perforation | 2535.30 | 2536.10 | 3 |
2010-11-12 | Perforation | 2403.70 | 2404.50 | 3 |
2010-11-12 | Perforation | 2282.20 | 2283.00 | 3 |
2010-11-12 | Multi-Stage Fracture | 2282.20 | 3201.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 198 | 0.0 | 0.0 | 0.0 |
2011 | 8192 | 0.0 | 0.0 | 0.0 |
2012 | 7164 | 0.0 | 0.0 | 0.0 |
2013 | 8502 | 0.0 | 0.0 | 0.0 |
2014 | 8420 | 0.0 | 0.0 | 0.0 |
2015 | 7918 | 0.0 | 0.0 | 0.0 |
2016 | 7821 | 0.0 | 0.0 | 0.0 |
2017 | 8137 | 0.0 | 0.0 | 0.0 |
2018 | 7457 | 0.0 | 0.0 | 0.0 |
2019 | 3342 | 0.0 | 0.0 | 0.0 |
2020 | 1658 | 0.0 | 0.0 | 0.0 |
For data sources see[6]