X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776102006004

Well Details

Well ID: 0776102006004
Loading map...
Location: 00/06-20-077-10W6/4
Location Alias: 00/06-20-77-10 W6M
Location Alias 2: 00/06-20-077-10 W6/04
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 10
Section: 20
County/Municipality: Saddle Hills County
Well Name: NORCEN PCOUPES 6-20-77-10
Operator Name: Canadian Natural Resources Limited
License Number: 0212749
License Date: 1998-01-29
License Status: Issued
Spud Date: 1998-03-05
Final Drill Date: 1998-03-19
Well Total Depth: 2315.00 m
Surface Hole Latitude: 55.683087
Surface Hole Longitude: -119.515027

For data sources see[1][2]

Well History

Date Event
1998-01-29 Obtained License
1998-03-07 Surface Casing Operation Performed
1998-03-10 Direction Drilling Operation Performed - Deviate
1998-03-19 Finished Drilling
1998-03-19 Well Log Performed
1998-03-21 Production Casing Operation Performed
1998-03-21 Rig Released
1998-03-30 Well Log Performed
1998-05-26 Well Log Performed
1998-05-27 Perforation Treatment Performed - Jet Perforation
1998-05-27 Well Log Performed
1998-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-28 Plug Back Performed
1998-05-28 Well Log Performed
1998-05-29 Perforation Treatment Performed - Jet Perforation
1998-05-29 Well Log Performed
1998-05-31 Perforation Treatment Performed - Fractured
1998-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-05 Plug Back Performed
1998-06-05 Well Log Performed
1998-06-06 Perforation Treatment Performed - Jet Perforation
1998-06-06 Well Log Performed
1998-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-20 Perforation Treatment Performed - Jet Perforation
1998-06-20 Well Log Performed
1998-06-20 Well Mode changed to Drilled and Cased
1998-06-21 Well Log Performed
1998-06-24 Perforation Treatment Performed - Jet Perforation
1998-06-24 Well Log Performed
1998-06-25 Perforation Treatment Performed - Fractured
1998-07-02 Well Log Performed
1998-07-03 Perforation Treatment Performed - Cement Squeeze
1998-07-03 Plug Back Performed
2000-02-09 Perforation Treatment Performed - Acid Wash - No Pressure
2000-03-10 Well Began Production
2000-03-10 Well Fluid changed to Gas
2000-03-10 Well Mode changed to Flowing
2018-01-01 Well Fluid changed to Gas
2018-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-03-10 1197.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-05-27 Perforation 2247.50 2249.00 18
1998-06-25 Fracture 1600.00 1606.00 0
1998-07-03 Cement Squeeze 1600.00 1606.00 0
2000-02-09 Acid Wash 1733.00 1737.00 0
1998-05-28 Packing Device Capped w/Cement 2233.00 2241.00 0
1998-05-29 Perforation 1913.50 1916.00 18
1998-05-31 Fracture 1913.50 1916.00 0
1998-06-05 Packing Device Capped w/Cement 1900.00 1908.00 0
1998-06-06 Perforation 1834.00 1838.00 18
1998-06-12 Acid Treatment 1834.00 1838.00 0
1998-06-20 Perforation 1733.00 1737.00 18
1998-06-24 Perforation 1600.00 1606.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6845 0.0 0.0 0.0
2002 8313 0.0 0.0 0.0
2003 8297 0.0 0.0 0.0
2004 8121 0.0 0.0 0.0
2005 8719 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8758 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8375 0.0 0.0 0.0
2010 8749 0.0 0.0 0.0
2011 8744 0.0 0.0 0.0
2012 8275 0.0 0.0 0.0
2013 8687 0.0 0.0 0.0
2014 5784 0.0 0.0 0.0
2015 8132 0.0 0.0 0.0
2016 8329 0.0 0.0 0.0
2017 8572 0.0 0.0 0.0
2018 8451 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References