Well Details

Well ID: 0776101916030
Loading map...
Location: 03/16-19-077-10W6/0
Location Alias: 03/16-19-77-10 W6M
Location Alias 2: 03/16-19-077-10 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 10
Section: 19
County/Municipality: Saddle Hills County
Well Name: TQN 103 HZ PCOUPES 16-19-77-10
Operator Name: TAQA North Ltd.
License Number: 0434586
License Date: 2011-06-23
License Status: Amended
Spud Date: 2012-02-15
Final Drill Date: 2012-02-28
Well Total Depth: 3278.00 m
Surface Hole Latitude: 55.681469
Surface Hole Longitude: -119.532231

For data sources see[1][2]

Well History

Date Event
2011-06-23 Obtained License
2012-02-17 Surface Casing Operation Performed
2012-02-20 Direction Drilling Operation Performed - Deviate
2012-02-25 Direction Drilling Operation Performed - Horizontal
2012-02-28 Finished Drilling
2012-02-28 Well Mode changed to Drilled and Cased
2012-03-02 Perforation Treatment Performed - Open-Hole Completion
2012-03-02 Production Casing Operation Performed
2012-03-07 Rig Released
2012-07-07 Well Log Performed
2012-07-26 Well Fluid changed to Gas
2012-07-26 Well Mode changed to Testing
2012-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-12 Well Began Production
2012-10-12 Well Fluid changed to Gas
2012-10-12 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-15 Horizon Drilling Inc. 20 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-20 1683.00 Deviate (5 - 79 degrees)
2012-02-25 2383.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-02 Open Hole/Barefoot Completion 3276.00 3278.00 0
2012-07-28 Multi-Stage Fracture 3221.50 3222.20 0
2012-07-28 Multi-Stage Fracture 3121.20 3122.00 0
2012-07-28 Multi-Stage Fracture 3007.60 3008.40 0
2012-07-28 Multi-Stage Fracture 2894.30 2895.10 0
2012-07-29 Multi-Stage Fracture 2779.70 2780.50 0
2012-07-29 Multi-Stage Fracture 2665.40 2666.10 0
2012-07-29 Multi-Stage Fracture 2551.50 2552.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2011 0.0 0.0 0.0
2013 8312 0.0 0.0 0.0
2014 8262 0.0 0.0 0.0
2015 8499 0.0 0.0 0.0
2016 8304 0.0 0.0 0.0
2017 8603 0.0 0.0 0.0
2018 8596 0.0 0.0 0.0
2019 7680 0.0 0.0 0.0
2020 2148 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-13 No Incident Encountered 0.00 0.00

For data sources see[8]