If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776101916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.691989,"lon":-119.528448,"icon":""}]} |
Location: 00/16-19-077-10W6/0 | |
Location Alias: 00/16-19-77-10 W6M | |
Location Alias 2: 00/16-19-077-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 10 | |
Section: 19 | |
County/Municipality: Saddle Hills County | |
Well Name: B.A. BRAEBURN 16-19MU-77-10 | |
Operator Name: Gulf Canada Limited | |
License Number: 0007664 | |
License Date: 1954-02-09 | |
License Status: RecExempt | |
Spud Date: 1954-03-05 | |
Final Drill Date: 1954-10-31 | |
Well Total Depth: 3361.30 m | |
Surface Hole Latitude: 55.691989 | |
Surface Hole Longitude: -119.528448 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-02-09 | Obtained License |
1954-03-21 | Drill Stem Test Performed |
1954-03-23 | Drill Stem Test Performed |
1954-04-03 | Drill Stem Test Performed |
1954-04-07 | Drill Stem Test Performed |
1954-04-10 | Drill Stem Test Performed |
1954-04-18 | Drill Stem Test Performed |
1954-04-19 | Drill Stem Test Performed |
1954-05-23 | Drill Stem Test Performed |
1954-05-24 | Drill Stem Test Performed |
1954-05-26 | Drill Stem Test Performed |
1954-05-28 | Drill Stem Test Performed |
1954-07-19 | Drill Stem Test Performed |
1954-07-21 | Drill Stem Test Performed |
1954-07-25 | Drill Stem Test Performed |
1954-07-28 | Drill Stem Test Performed |
1954-10-31 | Finished Drilling |
1954-11-12 | Production Casing Operation Performed |
1954-11-18 | Perforation Treatment Performed - Jet Perforation |
1954-11-19 | Drill Stem Test Performed |
1954-11-21 | Drill Stem Test Performed |
1954-11-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1954-11-25 | Perforation Treatment Performed - Cement Squeeze |
1954-11-26 | Drill Stem Test Performed |
1954-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1954-11-26 | Perforation Treatment Performed - Jet Perforation |
1954-11-27 | Drill Stem Test Performed |
1954-11-27 | Perforation Treatment Performed - Jet Perforation |
1954-11-29 | Drill Stem Test Performed |
1954-11-29 | Perforation Treatment Performed - Jet Perforation |
1954-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1954-12-03 | Drill Stem Test Performed |
1954-12-03 | Perforation Treatment Performed - Jet Perforation |
1954-12-04 | Drill Stem Test Performed |
1954-12-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1954-12-04 | Perforation Treatment Performed - Jet Perforation |
1954-12-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1954-12-06 | Drill Stem Test Performed |
1954-12-06 | Perforation Treatment Performed - Jet Perforation |
1954-12-07 | Perforation Treatment Performed - Jet Perforation |
1954-12-14 | Well Mode changed to Drilled and Cased |
1962-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-06-13 | Perforation Treatment Performed - Jet Perforation |
1962-06-14 | Well Mode changed to Drilled and Cased |
1962-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-02-26 | Well Began Production |
1965-02-26 | Well Fluid changed to Gas |
1965-02-26 | Well Mode changed to Flowing |
1966-07-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1966-07-09 | Perforation Treatment Performed - Jet Perforation |
1966-07-09 | Well Fluid changed to Gas |
1966-07-09 | Well Mode changed to Abandoned Zone |
1966-07-12 | Perforation Treatment Performed - Acid Wash - No Pressure |
1966-08-13 | Perforation Treatment Performed - Jet Perforation |
1966-08-21 | Perforation Treatment Performed - Cement Squeeze |
1966-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-09-09 | Perforation Treatment Performed - Acid Wash - No Pressure |
1966-09-12 | Perforation Treatment Performed - Jet Perforation |
1966-09-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1970-05-31 | Perforation Treatment Performed - Cement Plug |
1970-05-31 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-11-18 | Perforation | 3322.30 | 3334.50 | 13 |
1954-12-03 | Perforation | 2511.60 | 2520.70 | 13 |
1954-12-04 | Packing Device Capped w/Cement | 2491.70 | 2491.70 | 0 |
1954-12-04 | Perforation | 2436.90 | 2446.00 | 13 |
1954-12-05 | Packing Device Capped w/Cement | 2423.20 | 2423.20 | 0 |
1954-12-06 | Perforation | 2210.70 | 2211.60 | 13 |
1954-12-07 | Perforation | 2211.60 | 2217.10 | 13 |
1954-12-07 | Perforation | 2220.80 | 2234.80 | 13 |
1962-06-13 | Perforation | 1700.50 | 1702.00 | 13 |
1962-06-13 | Acid Treatment | 1700.50 | 1702.00 | 0 |
1962-06-16 | Acid Treatment | 2210.70 | 2234.80 | 0 |
1954-11-22 | Acid Treatment | 3322.30 | 3334.50 | 0 |
1966-07-09 | Packing Device Capped w/Cement | 2199.10 | 2202.20 | 0 |
1966-07-09 | Perforation | 1695.60 | 1697.70 | 7 |
1966-07-09 | Perforation | 1555.10 | 1556.60 | 7 |
1966-07-12 | Acid Wash | 1555.10 | 1556.60 | 0 |
1966-08-13 | Perforation | 1646.80 | 1647.10 | 13 |
1966-08-21 | Cement Squeeze | 1646.80 | 1647.10 | 0 |
1966-09-09 | Acid Treatment | 1695.60 | 1697.70 | 0 |
1966-09-09 | Acid Treatment | 1700.50 | 1702.00 | 0 |
1966-09-09 | Acid Wash | 1555.10 | 1556.60 | 0 |
1966-09-12 | Perforation | 1696.20 | 1697.70 | 7 |
1954-11-25 | Cement Squeeze | 3322.30 | 3334.50 | 0 |
1966-09-12 | Perforation | 1555.10 | 1556.60 | 7 |
1966-09-15 | Acid Treatment | 1696.20 | 1697.70 | 0 |
1966-09-15 | Acid Treatment | 1555.10 | 1556.60 | 0 |
1970-05-31 | Cement Plug | 1521.60 | 1706.90 | 0 |
1954-11-26 | Perforation | 3212.60 | 3224.80 | 13 |
1954-11-26 | Packing Device Capped w/Cement | 3186.70 | 3186.70 | 0 |
1954-11-27 | Perforation | 2898.60 | 2907.80 | 13 |
1954-11-29 | Perforation | 2804.20 | 2819.40 | 13 |
1954-11-29 | Perforation | 2743.20 | 2755.40 | 13 |
1954-12-02 | Packing Device Capped w/Cement | 2706.60 | 2706.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]